File no. : SAJH/PP/PT/JB/7 SJ.

487 Project ID : PZ000408

BEKALAN AIR UNTUK CADANGAN PEMBINAAN SATU (1) UNIT RUMAH


SESEBUAH/PPU/STP/PMU ATAS LOT 358 MUKIM PLENTONG,
JOHOR BAHRU.

COMMUNICATION PIPE 51mm Ø PA PIPE & METER STAND

For SAJH use;

CONSULTANT: DEVELOPER:

No. Tel. : No. Tel. :


No. Fax : No. Fax :

Submission no.: 1 2 3 4 5
Date of submission:
BEKALAN AIR UNTUK CADANGAN PEMBINAAN SATU (1) UNIT RUMAH
SESEBUAH/PPU/STP/PMU ATAS LOT 358 MUKIM PLENTONG,
JOHOR BAHRU.

NO. TOPIC PAGE

1.0 INTRODUCTION

2.0 PURPOSE OF APPLICATION

3.0 SOURCE OF WATER SUPPLY

4.0 SERVICE RESERVOIR

5.0 INTERNAL STORAGE

6.0 DESIGN CRITERIA

7.0 ANALYSIS OF RETICULATION PIPE

8.0 CONCLUSION

APPENDIX
1. SPAN Certificate
2. Pressure test result from SAJ (water source)
3. Kebenaran Merancang (KM) - Approval Plan
4. Building Plan (Dev. without KM) – Approval Plan
5. Specifications and Standard Drawing For
Pipeworks (SSD Form)

DRAWING
 Reticulation Pipe
 Schematic for Average flow
 Schematic for Peak Flow

1
BEKALAN AIR UNTUK CADANGAN PEMBINAAN SATU (1) UNIT RUMAH
SESEBUAH/PPU/STP/PMU ATAS LOT 358 MUKIM PLENTONG,
JOHOR BAHRU.

1.0 INTRODUCTION

This development is located at Lot ………, Mukim Tebrau, Johor Bahru, Johor. This
development classified as residential/commercial consist of one (1) unit double story
bungalow.

This bungalow will be constructed by Messrs……….based on the Kebenaran


Merancang/Building Plan that was approved by MBJB on ……2013 and water supply
system design by Messrs……. with water consumption estimated…. lpd as per table 1

Table 1 : Water demand

Type of Rate Total Expected Year


Unit
building (lpd) (lpd) Of Completion
Double story Bungalow 1 2000 2000 2021

2
KEY PLAN

3
LOCATION PLAN

4
2.0 PURPOSE OF APPLICATION

This submission is to seek approval of communication pipe 51mm Ø PA pipe and meter
stand.

3.0 SOURCE OF WATER SUPPLY

Source of water supply for this development will obtained from………... SAJ’s letter Bil.
( ) dlm. SAJH/PP/PT/JB……..dated 30.10.2013 are related.

4.0 SERVICE RESERVOIR

The distribution of water supply for this development is direct supply from existing 200mm
Ø mild steel at Jalan Persiaran Nusa Indah.

5.0 INTERNAL STORAGE

Internal storage with a capacity of 1800 gallons will be provided in this bungalow as
below:-

Type Capacity (gallon) TWL (m) BWL(m)


HDPE 1800 13.0 11.5

6.0 DESIGN CRITERIA

There are several criteria that were considered during designing of pipe reticulation as
follows: -

a) Analysis of average flow for pipe reticulation will be checked with factor 1.0.

5
b) Analysis of peak flow for pipe reticulation will be checked with factor 2.5 (2.5 x
average flow).

c) The coefficient of friction is based on the formula of Hazen Williams roughness


coefficients (C) is 100 for Mild Steel/Ductile Iron pipe and 120 for PA pipe.

d) HSL for analysis peak flow refer to TWL of internal water tank for landed
properties (less than 15m height of building) and suction for high-rise.

e) Minimum residual pressure referred to HSL at each node is 7.5m.

f) The minimum allowable head loss in pipe due to friction is 2/1000 for peak flow.

g) Convey flows with a velocity of not less than 0.3 m/sec and maximum is 2.0m/sec
for average flow.

h) Water demand and design shall be based on the Uniform Technical Guideline for
Water Reticulation and Plumbing.

7.0 ANALYSIS OF RETICULATION PIPE.

Based on the pressure test results received from SAJ via letter reference
(6)SAJH.JB/PT/2/582-1 dated 7.4.2014, the location of the pressure test is estimated
0.98km away from the proposed connection point (location plan attached). Therefore, here
is available pressure at proposed connection point:-

a. Available pressure at location of pressure test;

Residual Pressure = 33.0m

Ground level = 37.0m – 1.0m (depth of pipe)

= 36.0m

Available pressure = 33.0m + 36.0m = 69.0m

6
b. Available pressure at location of proposed connection point;

Estimate 2/1000 losses = 0.98km x 2 = 1.96m

Available pressure = 69.0m – 1.96m = 67.04m

Average flow = 1.0 x average flow


= 1.0 x 2000lpd

= 0.023lps

Peak flow = 2.5 x average flow


= 2.5 x 2000lpd

= 0.058lps

Based on available pressure, 67.04m that the water can be supply directly to the individual
tank.

Draw off table

Demand/ Total Average Peak Peak Platform


Type of HSL
Node Units unit demand Flow flow flow Level
building (m)
(lpd) (lpd) (lps) (lps) (mᶾ/s) (m)
1 Tappng point 20
2 Bungalow 1 2000 2000 0.023 0.058 0.000058 20 27

7
8.0 CONCLUSION

Based on the results of hydraulic analysis, here are conclusions of this report:-

1. The residual pressure refers to HSL for the peak and fire flow analysis shows the
value exceeding 7.5m.
2. The pressure head loss due to friction of the peak flow value less than 2/1000.
3. Convey flows with a velocity of not less than 0.3 m/sec and maximum is 2.0m/sec for
average flow.

8
APPENDIX

Appendix 1
1. - SPAN Certificate

Appendix 2
2. - Pressure test result from SAJ (water source)

Appendix 3
3. - Kebenaran Merancang (KM) - Approval Plan

- Building Plan (Dev. without KM) – Approval Plan


4. Appendix 4

Specifications and Standard Drawing For Pipeworks (SSD


5. Appendix 5 - Form)

9
DRAWING

10
BEKALAN AIR UNTUK CADANGAN PEMBINAAN SATU (1) UNIT RUMAH
SESEBUAH/PPU/STP/PMU ATAS LOT 358 MUKIM PLENTONG,
JOHOR BAHRU.

LIST OF DRAWING

NO. TITLE DRAWING NO.


1.0 Reticulation pipe
2.0 Schematic plan for peak flow
3.0 Schematic plan for average flow
4.0
5.0
6.0
7.0
8.0
9.0
10.0