ile no. : SAJH/PP/PT/JB/7 SJ.

487 Project ID : PZ000408

BEKALAN AIR UNTUK CADANGAN PEMBANGUNAN DI ATAS LOT 358, 1396,


1397, 2046 DAN 29946 MUKIM PLENTONG, JOHOR BAHRU.

COMMUNICATION PIPE 200mm Ø MILD STEEL &


METER STAND FOR PHASE 2

For SAJH use;

CONSULTANT: DEVELOPER:

No. Tel. : No. Tel. :


No. Fax : No. Fax :

Submission no.: 1 2 3 4 5
Date of submission:
BEKALAN AIR UNTUK CADANGAN PEMBANGUNAN DI ATAS LOT 358,
1396, 1397, 2046 DAN 29946 MUKIM PLENTONG, JOHOR BAHRU.

NO. TOPIC PAGE

1.0 INTRODUCTION

2.0 PURPOSE OF APPLICATION

3.0 SOURCE OF WATER SUPPLY

4.0 SERVICE RESERVOIR

5.0 DESIGN CRITERIA

6.0 ANALYSIS OF RETICULATION PIPE

7.0 CONCULATION

HYDRAULIC ANALYSIS: -
 Average flow analysis
 Peak flow analysis
 Fire flow analysis

APPENDIX
1. SPAN Certificate
2. Pressure test result from SAJ (water source)
3. Kebenaran Merancang (KM) - Approval Plan
4. Specifications and Standard Drawing For Pipeworks
(SSD Form)
5. Phasing drawing based on Overall Concept Plan (A3
size)

DRAWING
 Reticulation Pipe
 Schematic for Average flow
 Schematic for Peak Flow
 Schematic for Fire Flow

1
BEKALAN AIR UNTUK CADANGAN PEMBANGUNAN DI ATAS LOT 358, 1396,
1397, 2046 DAN 29946 MUKIM PLENTONG, JOHOR BAHRU.

1.0 INTRODUCTION

This development is located at PTD………, Mukim Tebrau, Johor Bahru, Johor. This
development classified as residential/commercial/mix consists of double storey terres,
industri kluster, industri berkembar, kedai pejabat, lot industri sederhana, apartment,
workers’ hostel and stall.

This development will be developing by Messrs……….and water supply system for whole
development design by Messrs…….

This development will be developed based on the Development Order that was approved by
MBJB on ……2013. The approved plan no. ……..enclosed. The total aera of this
development is …. acre with water consumption estimated…. lpd as per table 1

Table 1 : Water demand

Phase Type of Unit Rate Total Expected


building (lpd) (lpd) Year Of
Completion

Total

2
KEY PLAN

3
LOCATION PLAN

4
2.0 PURPOSE OF APPLICATION

This submission is to seek approval of communication pipe 200mm Ø M.S and meter stand
for Phase 2. Layout of this development is based on the approval of Overall Concept Plan,
bil.( ) dlm. SAJ/PP/PT/JB/7 SJ. 555 dated xxxx,

3.0 SOURCE OF WATER SUPPLY

Based on the approval of Overall Concept Plan, bil.( ) dlm. SAJ/PP/PT/JB/7 SJ. 555 dated
xxxx, source of water for this development will obtained from pipe 300mm ØM.S SAJ’s
letter Bil.( ) dlm. SAJH/PP/PT/JB……..dated 30.10.2013 are related.

4.0 SERVICE RESERVOIR

The distribution of water supply for this development is through the central reservoir. Size,
TWL, BWL and PL based on Overall Concept Plan approved on 12.3.2018 via letter dated
xxxxx. The detail of service reservoir as below: -

Capacity Type PL BWL TWL Diameter


(ML) (m) (m) (m) (m)
4.27 R.C (E) 62.00 70.00 75.00 33.00

5.0 DESIGN CRITERIA

There are several criteria that were considered during designing of pipe reticulation as
follows: -

a) Analysis of average flow for pipe reticulation will be checked with factor 1.0.
b) Analysis of peak flow for pipe reticulation will be checked with factor 2.5 (2.5 x
average flow).

5
c) Analysis of fire flow (hydrant) for pipe reticulation will be checked with the
average flow (1.0 factor) + 22.7lps (The hydrant involved at node……).

d) The coefficient of friction is based on the formula of Hazen Williams roughness


coefficients (C) is 100 for Mild Steel/Ductile Iron pipe and 120 for uPVC/multi
layer uPVC pipe.

e) HSL for analysis peak flow refer to TWL of internal water tank for landed
properties (less than 15m height of building) and suction for high-rise.

f) HSL for analysis fire flow refer to platform level for landed properties (less than
15m height of building) and high-rise.

g) Minimum residual pressure referred to HSL at each node is 7.5m.

h) The maximum allowable head loss in pipe due to friction is 2/1000 for peak flow
and 15/1000 for fire flow.

i) Convey flows with a velocity of not less than 0.3 m/sec and maximum is 2.0m/sec
for average flow.

j) Minimum size for pipe reticulation is 100mm Ø.

k) All pipelines within an external reticulation system shall operate within a static
pressure not exceeding 30m at all conditions.

l) Water demand and design shall be based on the Uniform Technical Guideline for
Water Reticulation and Plumbing.

m) …… software used for analysis of pipe reticulation.

6.0 ANALYSIS OF RETICULATION PIPE.

Based on letter reference (6)SAJH.JB/PT/2/582-1 dated 7.4.2014, dated xxxx, here is


available pressure at proposed connection point:-

Available pressure at location of pressure test;

6
Residual Pressure = 33.0m

Ground level = 37.0m – 1.0m (depth of pipe)

= 36.0m

Available pressure = 33.0m + 36.0m = 69.0m

Average flow = 1.0 x average flow


= 1.0 x 63.404 lps

= 158.51lps

Peak flow = 2.5 x average flow


= 2.5 x 63.404 lps

= 158.51lps

Fire flow = (1.0 x average flow) + hydrant flow

= 63.404 lps + 22.7lps

= 86.104lps

…….Software used for analysis of pipe reticulation. Draw-off table for the analysis of pipe
reticulation can be referring in hydraulic analysis section. Based on available pressure,
67.04m that the water can be supply directly to the individual tank.

7.0 CONCLUSION

Based on the results of hydraulic analysis, here are conclusions of this report:-

1. The residual pressure refers to HSL for the peak and fire flow analysis shows the
value exceeding 7.5m.
2. The pressure head loss due to friction of the peak flow and fire flow analysis shows
the value less than 2/1000 and 15/1000.
3. Convey flows with a velocity of not less than 0.3 m/sec and maximum is 2.0m/sec for
average flow.

7
HYDRAULIC
ANALYSIS

Draw off
Node Type of building/ Units Demand/ Total Average Peak Fire Platform HSL
development unit demand Flow flow Flow Level (m)
8
(lpd) (lpd) (lps) (lps) (lps) (m)

Total

9
AVERAGE
FLOW
ANALYSIS

10
PEAK FLOW
ANALYSIS

11
FIRE FLOW
ANALYSIS

APPENDIX

Appendix 1
1. - SPAN Certificate

Appendix 2
2. - Pressure test result from SAJ (water source)

Appendix 3
3. - Kebenaran Merancang (KM) - Approval Plan

12
Appendix 4 Specifications and Standard Drawing For Pipeworks (SSD
4. - Form)

13
DRAWING

BEKALAN AIR UNTUK CADANGAN PEMBANGUNAN DI ATAS LOT 358, 1396,


1397, 2046 DAN 29946 MUKIM PLENTONG, JOHOR BAHRU.
14
LIST OF DRAWING

NO. TITLE DRAWING NO.


1.0 Reticulation pipe
2.0 Schematic plan for peak flow
3.0 Schematic plan for average flow
4.0 Schematic plan for fire flow
5.0
6.0
7.0
8.0
9.0
10.0

15

You might also like