Professional Documents
Culture Documents
Report - Water Rect - Based On Overall
Report - Water Rect - Based On Overall
Report - Water Rect - Based On Overall
CONSULTANT: DEVELOPER:
Submission no.: 1 2 3 4 5
Date of submission:
BEKALAN AIR UNTUK CADANGAN PEMBANGUNAN DI ATAS LOT 358,
1396, 1397, 2046 DAN 29946 MUKIM PLENTONG, JOHOR BAHRU.
1.0 INTRODUCTION
7.0 CONCULATION
HYDRAULIC ANALYSIS: -
Average flow analysis
Peak flow analysis
Fire flow analysis
APPENDIX
1. SPAN Certificate
2. Pressure test result from SAJ (water source)
3. Kebenaran Merancang (KM) - Approval Plan
4. Specifications and Standard Drawing For Pipeworks
(SSD Form)
5. Phasing drawing based on Overall Concept Plan (A3
size)
DRAWING
Reticulation Pipe
Schematic for Average flow
Schematic for Peak Flow
Schematic for Fire Flow
1
BEKALAN AIR UNTUK CADANGAN PEMBANGUNAN DI ATAS LOT 358, 1396,
1397, 2046 DAN 29946 MUKIM PLENTONG, JOHOR BAHRU.
1.0 INTRODUCTION
This development is located at PTD………, Mukim Tebrau, Johor Bahru, Johor. This
development classified as residential/commercial/mix consists of double storey terres,
industri kluster, industri berkembar, kedai pejabat, lot industri sederhana, apartment,
workers’ hostel and stall.
This development will be developing by Messrs……….and water supply system for whole
development design by Messrs…….
This development will be developed based on the Development Order that was approved by
MBJB on ……2013. The approved plan no. ……..enclosed. The total aera of this
development is …. acre with water consumption estimated…. lpd as per table 1
Total
2
KEY PLAN
3
LOCATION PLAN
4
2.0 PURPOSE OF APPLICATION
This submission is to seek approval of communication pipe 200mm Ø M.S and meter stand
for Phase 2. Layout of this development is based on the approval of Overall Concept Plan,
bil.( ) dlm. SAJ/PP/PT/JB/7 SJ. 555 dated xxxx,
Based on the approval of Overall Concept Plan, bil.( ) dlm. SAJ/PP/PT/JB/7 SJ. 555 dated
xxxx, source of water for this development will obtained from pipe 300mm ØM.S SAJ’s
letter Bil.( ) dlm. SAJH/PP/PT/JB……..dated 30.10.2013 are related.
The distribution of water supply for this development is through the central reservoir. Size,
TWL, BWL and PL based on Overall Concept Plan approved on 12.3.2018 via letter dated
xxxxx. The detail of service reservoir as below: -
There are several criteria that were considered during designing of pipe reticulation as
follows: -
a) Analysis of average flow for pipe reticulation will be checked with factor 1.0.
b) Analysis of peak flow for pipe reticulation will be checked with factor 2.5 (2.5 x
average flow).
5
c) Analysis of fire flow (hydrant) for pipe reticulation will be checked with the
average flow (1.0 factor) + 22.7lps (The hydrant involved at node……).
e) HSL for analysis peak flow refer to TWL of internal water tank for landed
properties (less than 15m height of building) and suction for high-rise.
f) HSL for analysis fire flow refer to platform level for landed properties (less than
15m height of building) and high-rise.
h) The maximum allowable head loss in pipe due to friction is 2/1000 for peak flow
and 15/1000 for fire flow.
i) Convey flows with a velocity of not less than 0.3 m/sec and maximum is 2.0m/sec
for average flow.
k) All pipelines within an external reticulation system shall operate within a static
pressure not exceeding 30m at all conditions.
l) Water demand and design shall be based on the Uniform Technical Guideline for
Water Reticulation and Plumbing.
6
Residual Pressure = 33.0m
= 36.0m
= 158.51lps
= 158.51lps
= 86.104lps
…….Software used for analysis of pipe reticulation. Draw-off table for the analysis of pipe
reticulation can be referring in hydraulic analysis section. Based on available pressure,
67.04m that the water can be supply directly to the individual tank.
7.0 CONCLUSION
Based on the results of hydraulic analysis, here are conclusions of this report:-
1. The residual pressure refers to HSL for the peak and fire flow analysis shows the
value exceeding 7.5m.
2. The pressure head loss due to friction of the peak flow and fire flow analysis shows
the value less than 2/1000 and 15/1000.
3. Convey flows with a velocity of not less than 0.3 m/sec and maximum is 2.0m/sec for
average flow.
7
HYDRAULIC
ANALYSIS
Draw off
Node Type of building/ Units Demand/ Total Average Peak Fire Platform HSL
development unit demand Flow flow Flow Level (m)
8
(lpd) (lpd) (lps) (lps) (lps) (m)
Total
9
AVERAGE
FLOW
ANALYSIS
10
PEAK FLOW
ANALYSIS
11
FIRE FLOW
ANALYSIS
APPENDIX
Appendix 1
1. - SPAN Certificate
Appendix 2
2. - Pressure test result from SAJ (water source)
Appendix 3
3. - Kebenaran Merancang (KM) - Approval Plan
12
Appendix 4 Specifications and Standard Drawing For Pipeworks (SSD
4. - Form)
13
DRAWING
15