Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

D

01 02 03 04 C B A
CEILING VENT CEILING VENT

10.30 6.10
0.75 2.40 4.15 3.75 0.45 0.75 0.70 2.95 2.45 0.45

APEX LINE OF ROOF


1.85

1.85
0.10
0.10

TOP OF BEAM
CEILING LINE

0.20
DOWNSPOUT

0.30
0.10
DOWNSPOUT
VERTICAL BARS

1.50
1.20
BRISE SOLEIL 2'' THICK MOLDINGS
PAINT COATED
2.60

RAILINGS

1.80
8.05

8.02
0.90

0.90
3'' METAL BARS

0.30
PAINT COATED
0.30

SECOND FLOOR LINE

CEILING LINE

1.40
2'' THICK MOLDINGS

0.10
PAINT COATED
0.20 0.30

0.10
0.35 1.15
2.70
2.50

2.10

0.30
0.90
1.60

F.F.L.

0.50
0.50

N.G.L.

A RIGHT SIDE ELEVATION A RARE ELEVATION


5-8 SCALE 1:100 M 6-8 SCALE 1:100 M

You might also like