Professional Documents
Culture Documents
LAYOUT
LAYOUT
LAYOUT
G WITH TOILET
SALES BUILDIN Y
WATER FACILIT
AND DRINKING
4.50
14.47
4.50
FUEL STATION AHEAD F NO ENTRY
A 4.5 3.76
AT 1KM & 500M 1KM V
3.69
W.C. W.C.
D2
COMPULSARY DIRECTION
&
D2 TOILET(M)
INVERTERS
BATTERIES
4.00
D2
1.00 x 1.50
D1 D
TOILET (F)
G
V D
SALES ROOM
PREPARED BY : SCALE
OFFICE
D2
DATE
2.50 x 2.00
99.900
4.50
SD
YARD LIGHT
W
W
13.48
13.
CHECKED BY APPROVED BY
D GIVEWAY I NO LEFT TURN
80
XY STORM WATER
ONE WAY FUEL STATION BOARD 12.00
E J CHAMBER
15.29 9.00 10.90
48.50
51.00
99.800
99.750
7.20
14.33 9.00 11.83
CONTROL LINE AT 50 m
24.20
FROM C/L OF NH - 548D
10.00
99.650 99.700
10.50
ENTRY FACILITY
SIGN POLE SIGN POLE
CHAINAGE 99.550 99.600 CHAINAGE
ROW 34/390 J H 34/425
R=650.0M ROW
INGRESS EGRESS
ROW CATCH WATER DRAIN 3.0M WIDE BUFFER STRIP CATCH WATER DRAIN
NEAR BY NALA OPEN GUTTER NEAR BY NALA
11.50 12.00 11.50 70.00 30.00
70.00 35.00
37.00 M
R1
30.00 M
3
275MM HIGH &
150MM THK. KERB WALL
SHIKHARAPUR
C/L OF ROAD NH-548D
7.00
CHAKAN
1.50M WIDE PAVED SHOULDER 1.50M WIDE PAVED SHOULDER
1.00M WIDE EARTHERN SHOULDER H I 1.00M WIDE EARTHERN SHOULDER