Time Table Em-Tech
Time Table Em-Tech
Time Table Em-Tech
2 2nd Visit and Meeting for 1st Inquiry GEOV (ACCOUNT MANAGER) 17-Apr-24
TETUKO (JUNIOR ACCOUNT MANAGER)
3 Delivery Invoice for 1st Inquiry BOWO (COURIER) 18-Apr-24 Received by : Kartika Nadeak
4 Lan Installation PENDI AND TEAM ( TECHNIS) 22-Apr-24 Lan installation for server purpose
5 Man Power on dutty SIGIT ( TECHNICIAN ) 25-Apr-24 Setup and Installation for Server
6 Delivery for 1st Inquiry ( Batch 1 ) BOWO (COURIER) 25-Apr-24 Mic Office and Windows 11 Pro
7 Man Power on dutty SIGIT ( TECHNICIAN ) 26-Apr-24 Setup and Installation for Server
8 Visit And Meeting for advance I.T preparation purpose GEOV (ACCOUNT MANAGER) 02-May-24 Summary:
JULIANT (TECHNICIAN MANAGER) 1) Expand the network coverage by instal another Acces Point ( Still On Progress )
SILVA ( TEAM TECHNIS ) 2) Wainting Confirmation from Mr.Indra For CCTV Installation ( Waiting )
SIGIT ( TECHNICIAN ) 3) RFID Acces Door plan preparation ( Waiting Confirmation )
- Using Finger For Daily check in And RFID for Acces Door
- Using Finger and RFID For Daily check in And Access Door
- Using Face Recognation For Daily check in And Access Door
9 Delivery for 1st Inquiry ( Batch 2 ) BOWO (COURIER) 06-May-24 Mic Server dan SQL Server
10 Man Power on dutty SIGIT ( TECHNICIAN ) 06-May-24 Setup and Installation for Server, Microsoft and Windows
11 Man Power on dutty SIGIT ( TECHNICIAN ) 07-May-24 Setup and Installation for Server, Microsoft and Windows
12 Delivery for 1st Inquiry ( Batch 3 ) BOWO (COURIER) 09-May-24 Rack For Server
13 Delivery for 1st Inquiry ( Batch 4 ) BOWO (COURIER) 16-May-24 APC UPS 2000VA
14 Man Power on dutty SIGIT ( TECHNICIAN ) 16-May-24 Rack Installation and Tidy Up
All Not Done Schedule are tentative, the time will change All schedules that have not been worked out
are temporary estimates, they affect problems in the field, they could be slower or faster than estimated.