Aquademica Mars Investments

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 25

Legal Disclaimer

This document has been prepared by the Norwegian registered company Marine Novus ltd, hereinafter referred to as the
“Company”, exclusively for your personal use only.

Your capital is at risk when you invest, especially when investing in startups and early stage businesses.

This document contains statements and projections with respect to the anticipated future performance of the Company and its
subsidiaries. These forward-looking statements reflect the Company’s current expectations and projections,
and necessarily involve a number of risks, uncertainties and assumptions. Such statements and projections reflect various
assumptions made by the management of the Company concerning anticipated results, and are subject to amendments at any
time without any prior notice. Past performance is not a reliable guide to future performance.

The historical financial information contained herein is based solely on management reports and has not been audited. The
Company does not make any representations as to any trends or activities continuing in the future.

This document is strictly confidential and may not be communicated to any third party or copied in whole or in part, without the
prior written consent of the Company. The reader of this document hereby undertakes to keep all information, documents and
knowledge of whatever kind obtained by them of the Company and its subsidiaries through this document secret and
confidential.
INSPIRED BY INDUSTRIES
Leveraging technologies, experience, knowledge and industry standards from other
industries to enhance building construction on land

A E R O S PA C E OIL & GAS SHIPPING CONSTRUCTION


ULTRA STRUCTURES HARSH ENVIRONMENT HEAVY LIFTERS HIGH RISE BUILDINGS

Extreme weight to strength ratio Life Weather resistant Streamlined production Revolutionized materials
No room for error Strong structures Standard procedures Extreme structures
Cycle Information Redundancy Redundancy Hyper Models
Traceability Durability Endurance Metadata
Complex High tech
10.000 m

0m

-5.000 m
«You don´t have to reinvent the wheel, just attach it to a new wagon» Mark McCormack
SUSTAINABLE WITH FUTURE IN FOCUS

Affordable Design Code


LOW LIVING COST FUTURE STANDARDS APPLIED

Energy efficient building with Future requirements and standards


optional solar panels, waste water are applied from design ideas to
energy recovery and other options. completion

Lifecycle 100% Fireproof


RECYCLABLE
UP TO 90 YEARS NON-COMBUSTIBLE
All materials are fully recyclable,
Unit life expectancy 90+ years, due Materials are 100% fireproof
and has a greater after use value,
to specified alloys in use and every unit has double
compared with traditional built
as well as cathode system (ICCP) fire safety time
ZEB
ZERO ENERGY BUILING
ACCOMODATION WITH MOBILITY
Driven Suction Vertical Clump Drop
pile pile Load weight Anchor/
Anchor Torpedo
Jack- Tri- VLA Pile
Up pod
Educational

Luxury living

Crew housing

Residential

Commercial
Solutions:
On Shore
On Board
Offshore Sewage Solar Water Waste Water Power Waste &
Satellite Power Treatment Water Supply Supply Re-Cycling
LOW LIVING COST WITH RENEWABLE ENERGY

Solar Power Renewable


LOW LIVING COST
HEATING & COOLING
Solar panels on roof, cladding and
wafers can generate enough power Achieved by reversible heat pump /
to be self sustainable. chiller with natural refrigerants In
the water, utilizing natural energy
*Project specific, dependent on from the ocean
location and area to be covered

PROJECT High quality Smart house


MATERIALS LOW COST
SPECIFIC REQUIREMENTS
All materials are fully compliant to All appliances have low
Each project has its own consumption, and linked to smart
future building standards, ensuring
requirements and will be defined in house controllers to reduce the
lower maintenance cost.
basic design phase. living cost

* Project specific based on size, location and end solution


DNV-RU-OU-0571
DNV-RU-OU-0571
Total Lenght 108 m
Total Width 47 m
Total Height 32 m
Draft
During use 1,20 - 2,00 m
DNV-RU-OU-0571 Transportation 1,50 m
DNV-RU-OU-0571
DNV-RU-OU-0571
Size 18 m2 24 m2 37 m2 76 m2
Priv area 18 m2 24 m2 10 m2 10 m2
Length 7,5 m 7,5 m 7,5 m 7,5 m
Width 2,9 m 3,6 m 5,8 m 11,6 m
Height 2,9 m 2,9 m 2,9 m 2,9 m
Kitchen 1 1 1 1
Bath 1 1 2 4
People 1 2 2 4
The RIBA Plan of Work
organises the process of
briefing, designing, delivering,
maintaining, operating and
0 1 2 3 4 5 6 7
using a building into eight
stages. It is a framework for
all disciplines on construction
Strategic Preparation Concept Spatial Technical Manufacturing

Project Execution Model


RIBA projects and should be
used solely as guidance for Definition and Briefing Design Coordination Design and Construction Handover Use
Plan of Work the preparation of detailed
2020 professional services and
building contracts. Projects span from Stage 1 to Stage 6; the outcome of Stage 0 may be the decision to initiate a project and Stage 7 covers the ongoing use of the building.

Stage Boundaries: Stage Outcome The best means of achieving Project Brief approved by the Architectural Concept Architectural and engineering All design information Manufacturing, construction Building handed over, Building used, operated and
Stages 0-4 will generally at the end of the stage the Client Requirements client and confirmed that it approved by the client and information Spatially required to manufacture and Commissioning Aftercare initiated and maintained efficiently
be undertaken one after confirmed can be accommodated on aligned to the Project Brief Coordinated and construct the project completed Building Contract concluded
the other. the site completed
If the outcome determines that The brief remains “live” during
Stages 4 and 5 will overlap a building is the best means of Stage 2 and is derogated in There is no design work in Stage 5 Stage 7 starts concurrently with
in the Project Programme achieving the Client Requirements, response to the Architectural Stage 4 will overlap with Stage 5 other than responding to Site Stage 6 and lasts for the life of the
the client proceeds to Stage 1 Concept on most projects Queries building
for most projects.
Stage 5 commences
when the contractor takes Core Tasks Prepare Client Requirements Prepare Project Brief Prepare Architectural Undertake Design Studies, Develop architectural and Finalise Site Logistics Hand over building in line with Implement Facilities
possession of the site during the stage including Project Outcomes Concept incorporating Engineering Analysis and engineering technical design Plan for Use Strategy Management and
Develop Business Case for Manufacture Building
and finishes at Practical and Sustainability Outcomes, Strategic Engineering Cost Exercises to test Asset Management
feasible options including Prepare and coordinate Systems and construct Undertake review of Project
Completion. Quality Aspirations and requirements and aligned to Architectural Concept
review of Project Risks and design team Building building Performance Undertake Post Occupancy
Stage 6 starts with the Spatial Requirements Cost Plan, Project Strategies resulting in Spatially
Project Budget Systems information Evaluation of building
handover of the building to and Outline Specification Coordinated design aligned Monitor progress against Undertake seasonal
Undertake Feasibility Studies performance in use
the client immediately after Ratify option that best delivers to updated Cost Plan, Project Prepare and integrate Construction Programme Commissioning
Agree Project Brief
Practical Completion and Project Strategies might include: Client Requirements Agree Project Budget Strategies and Outline specialist subcontractor Verify Project Outcomes
Derogations Inspect Construction Quality Rectify defects
finishes at the end of the – Conservation (if applicable) Specification Building Systems including Sustainability
Review Feedback from Source Site Information
Defects Liability Period.
– Cost Undertake Design Reviews information Resolve Site Queries as Complete initial Aftercare Outcomes
previous projects including Site Surveys Initiate Change Control
PEM

– Fire Safety
– Health and Safety with client and Project required tasks including light touch
Stage 7 starts concurrently Procedures Prepare stage Design
– Inclusive Design Undertake Site Appraisals Prepare Project Programme Stakeholders Post Occupancy Evaluation
with Stage 6 and lasts for – Planning Programme Undertake Commissioning
the life of the building. Prepare Project Execution Prepare stage Design of building
– Plan for Use Prepare stage Design
– Procurement Plan Programme
– Sustainability
Programme Prepare Building Manual
Planning Note: See RIBA Plan of Work 2020 No design team required for Stages 0 and 1. Client advisers may be appointed Specialist subcontractor designs Adaptation of a building (at the
Overview for detailed guidance to the client team to provide strategic advice and design thinking before Stage are prepared and reviewed during Building handover tasks bridge Stages 5 and 6 as set out in the Plan for Use end of its useful life) triggers a new
Planning Applications on Project Strategies 2 commences. Stage 4 Strategy Stage 0
are generally submitted
at the end of Stage 3 and
should only be submitted Core Statutory Strategic appraisal of Source pre-application Obtain pre-application Review design against Submit Building Regulations Carry out Construction Comply with Planning Comply with Planning
earlier when the threshold Processes Planning considerations Planning Advice Planning Advice Building Regulations Application Phase Plan Conditions as required Conditions as required
of information required has during the stage: Initiate collation of health Agree route to Building Prepare and submit Discharge pre- Comply with Planning
been met. If a Planning and safety Pre-construction Regulations compliance Planning Application commencement Planning Conditions related to
Application is made Planning Information Conditions construction
during Stage 3, a mid- Option: submit outline
Building Regulations
stage gateway should be Planning Application Prepare Construction
Health and Safety (CDM)
determined and it should Phase Plan
See Planning Note for guidance on
be clear to the project team submitting a Planning Application Submit form F10 to HSE if
which tasks and deliverables earlier than at end of Stage 3
applicable
will be required.
See Overview guidance. Procurement Tender
Appoint
Traditional contractor
Route
Appoint
Procurement: Design & Build 1 Stage ER CP contractor
The RIBA Plan of Work Appoint Appoint Appoint Appoint Facilities Management
is procurement neutral – Design & Build 2 Stage client team design team ER Pre-contract services agreement CP contractor and Asset Management teams, and
strategic advisers as needed
See Overview guidance for Management Contract Appoint
a detailed description of Construction Management contractor
how each stage might be Appoint
adjusted to accommodate Contractor-led ER Preferred bidder CP contractor
the requirements of the
Procurement Strategy. Information Client Requirements Project Brief Project Brief Derogations Signed off Stage Report Manufacturing Information Building Manual including Feedback on Project Feedback from Post
Employer’s Exchanges Health and Safety File and Performance Occupancy Evaluation
ER
Business Case Feasibility Studies Signed off Stage Report Project Strategies Construction Information
Requirements at the end of the stage Fire Safety Information
Final Certificate Updated Building Manual
Site Information Project Strategies Updated Outline Final Specifications
Contractor’s Practical Completion including Health and
Specification Feedback from light touch
CP
Proposals Project Budget Outline Specification Residual Project Strategies certificate including Safety File and Fire Safety
Post Occupancy Evaluation
Updated Cost Plan Defects List Information as necessary
Project Programme Cost Plan Building Regulations
Planning Application Application Asset Information
Procurement Strategy
Responsibility Matrix If Verified Construction
Information is required, verification
Information Requirements tasks must be defined
AQUADEMICA TEAM
Eystein Lyche – COO/Business Peter Johansson – CTO/Marine Erik Lystad – CDO/Yard relations
developer designer Project developer shipping /
An excellent relationship manager, More than 40 years of experience in offshore, stationed in China, 2nd
who’s personal spikes are his design, construction and generation of close relations with
communication and client engineering of Marine / Oil & Gas shipyards.
recruitment and development skills. units and for a variety of many Erik has experience from running a
He has extensive experience in onshore/offshore installations. computer engineering company,
developing, implementing and The experience is related to EIT design providing services to several
evolving new and existing businesses, and conceptual work as well as companies in Oslo.
products and services and has construction and commissioning.
significant experience across all areas Later he took over an air
Familiar to shipyards and site work in conditioning and construction
of the maritime industry. various remote areas. company in Spain. Involving project
Eystein has held several senior Used to hold multitask planning, project management,
management positions focused on management and supervising constructions and installations.
project finance and syndication in well positions in different companies and During this time, he became the
renowned companies, predominately projects. distributor for Ledton in Europe, a
across Asia and Australia and has over The last 20 years, Peter has been LED lightning technology company.
20 years of experience in business working as a EIT consultant for As part of the job, he got involved
development, management, different company and organizations with green energy solutions.
brokering and trading, and has played i.e., GVA, Bassoe technology, Brevik
an integral part in establishing and Erik has been in China the last 9 years
Engineering, VME, AXIS, Crest, BP, and have been the general manager
developing successful international Equinor, Sadra, Master Marine, Jurong
companies, both on the owner and the last 7 of those. The position has
shipyard, DDW. been to maintain and tie relationships
operations side.
The task has been among other to with shipyards, factories and build
Eystein holds a Degree in work as a Senior Advisor, Project general relationships within the
International Shipping & finance manager and/or Lead for the EIT international industry and financial
from The Norwegian Shipping discipline and to assist on other institutions supporting those
academy, as well as a business disciplines i.e., general arrangement, industries in China and Asia in
degree from IHM. HVAC, piping and mechanical. general.
Contact:
Eystein Lyche
+47 918 53 510
eystein@aquademica.no

You might also like