Professional Documents
Culture Documents
PR A TD MLCP FP 201 Basement 2
PR A TD MLCP FP 201 Basement 2
PR A TD MLCP FP 201 Basement 2
SEC B
required. 200 mm wall
Cladding /Railing /Dilling etc.
01
Architect 29 Bank Street,
Fort,
Hafeez Mumbai 400 023
VENTILATION SHAFT Tel : 2266 1920
Contractor
ABOVE FOR B2 250 mm wall
STRUCTURAL CONSULTANT :
P. B1 B2 FHC
SHAFT F-503, Tower 2, Seawoods Grand
RECI
SHAFT SHAFT Central,
D4 Seawoods, Navi Mumbai - 400706
LIFT T: +91 2268224071
2200X2400 REQUIRED ENGINEERING E: info@reciengineering.com
UP
BASEMENT FRESH AIR
FAN ROOM
SPACE FOR
SERVICE AREA
300 mm wall MEP CONSULTANT :
DN
5000X3870 METRO STATION, NARAYAN BUILDING, KURLA
SMOKE ROAD, JUNCTION, NEAR SAKINAKA, SAKI NAKA,
B B B B B S S S S S S S S S B B SEC C ANDHERI, MAHARASHTRA 400072
FHC
CHECK
UP
LOBBY D1
T:+ 91 22 28508683; M: +91-9773416761
LVL +37.558M
SMOKE CHECK
LOBBY 01 ENGINEERING
www.kpm-engineering.com
E: imran.b@kpm-engineering.com
D1 150 mm NS wall W: www.kpm-engineering.com
LANDSCAPE CONSULTANT :
B 202-203, GOKARN,OPP ADITYA BANQUETS, R.M.
SEC D
B2 FLOOR LVL +39.00M SEC D
BHATTAD MARG, HARIDAS NAGAR, BORIVALI (W),
MUMBAI- 400 091. MAHARASHTRA [INDIA]
LVL +37.00M 6.00 M WIDE RAMP UP TOWARDS MLCP LVL B1 FLOOR NEWARCH
®
+ 91 22 2833 7173, + 91 22 2898 2904
01 01 150 mm full height ledge wall LANDSCAPES LLP admin@newarchllp.com
WE SHAPE OPEN SPACES
RAMP LENGTH 40.00 M , SLOPE 1:20 LIGHTING CONSULTANT :
6.00 M WIDE DRIVEWAY B
40000
B
150 mm wc ledge wall
ACOUSTICS / AV/ MULTIMEDIA/ AUDI CONSULTANT :
6.00 M WIDE DRIVEWAY
S S S S S S S S S S S S S S S S
VENTILATION SHAFT ABOVE VENTILATION SHAFT ABOVE FOR B2 VENTILATION SHAFT ABOVE FOR B2 VENTILATION SHAFT ABOVE
B
MUNICIPAL CONSULTANT :
S B
S S B B B B B B B B B B B B S S
FACADE CONSULTANT :
B
INTERIOR CONSULTANT :
24000 M[o]rph_Lab
SAMBHAV , 1301, Lodha Supremus, Senapati Bapat Marg,
6.00 M WIDE DRIVEWAY 6.00 M WIDE RAMP DN TOWARDS MLCP B2 LOWER LVL Lower Parel. (w) 400 013 , MUMBAI , INDIA.
www.morphlab.in
RAMP LENGTH 24.00 M , SLOPE 1:20 B T +91 22 24366582/66666191
SEC A SEC A E projects@morphlab.in
01 B2 FLOOR 01 Key Plan:
LVL +37.00M LVL +35.80M D1
AOS / POLICE
STATION
RG1
AREA 1108.76 SQM
LIFT LOBBY
DG
P. RG2
FHC
AREA
193.30 SQM
MOVEMENT
DG
CHECK
FIRE TENDER
LOBBY
9M WIDE FIRE
MOVEMENT
UP
TENDER
9M WIDE FIRE TENDER MOVEMENT
9M WIDE
B B B B B B B B B S
9 M. W.ROAD
SUBSTATION
LVL +44.00M
BASEMENT
PROPOSED
FHC
PATH WAY
MLCP-PHASE-1 PROPOSED
PATH WAY
G+10+1 BASEMENT MLCP-PHASE-2
G+10+2 BASEMENT
R&R
RESERVATION
D4
EXHAUST AIR
ENTRY/ EXIT
DOMESTIC
ENTRY/EXIT FOR FIRE
TENDER
LVL +44.00M
GRASS PAVERS - 1
6M WIDE SERVICE ROAD 6 M WIDE DRIVEWAY 6.0 M WIDE DRIVEWAY
6 M WIDE DRIVEWAY
3 NOSDEPTH
BEAM TO BE MINIMUM DINING
10'-6"X16'4"
3200X4975
DECK
9'-10''X5'-6''
3000X1665
SUNK BY 150 MM
DECK
9'-10''X5'-6''
3000X1665
SUNK BY 150 MM DINING
10'-6"X16'4"
3200X4975
ODU
3 NOSDEPTH
BEAM TO BE MINIMUM
ODU ODU
925 [3']
925 [3']
K K 1325 [4'-4"] 1325 [4'-4"]
K K
TOILET TOILET 2400 [7'-10"] 2400 [7'-10"]
725 [2'-5"]
725 [2'-5"]
1525X2450
5'X8' 1525X2450
5'X8'
WD-2.50 MTR
SUNK BY 75 MM
2100 2100
SUNK BY 200 MM 3970X2450
KITCHEN FOYER FOYER 3970X2450
KITCHEN SUNK BY 200 MM PROJECTION ABOVE
13'X8' FRD 1275X2900
4'-2"X9'-6" 4'-2"X9'-6"
1275X2900 FRD 13'X8'
ODU 10'X5'6"
SUNK BY 150 MM MAIN MAIN
BEAM TO BE MINIMUM DEPTH 2.0 M ENTRANCE ENTRANCE
925 [3']
WIDE ST LOBBY
Q 3100X2950 P.LIFT-01 P.LIFT-03 1325 [4'-4"]
750 [2'-6"]
M.TOILET UP
K
DINING ODU ODU 10'-2"X9'-8" 2200X1975 LIFT LOBBY 2200X1975 ODU UDO
9 M. W.RAMP UP
SUNK BY 150 MM 11'X13' LIVING
COMMON AREA
11'-6"X22'-2"
3500X6750 KITCHEN P.LIFT-02 UP DN DN UP S.LIFT-02
ELECTRICAL
ELV DB DB 2450X3970 2200X1975 2200X1975
PARENTS 1000 MM WIDE PASSAGE 8'X13' GOODS/SERVICE P.L.03 2950X2850
P.L.04 6'-7"X6'-6" 6'-7"X6'-6"
HAPPY STREET
BEDROOM UP TOILET 3650X3400
LIFT 9'-8"X11'-2"
2950X3400 9'-8"X9'-4"
11'X11'-8"
3350X3550 CONSOLE/STORAGE 1225X1450 12'X11'-2"
IN WARDROBE
4'X4'-9" ED SHAFT
PLUMBING SHAFT
PLUMBING
WALK2450X1525
8'0"X5'0"
FRD FHC
K M.TOI TOILET FOYER
5'X8'
1525X2450 1525X2450
5'X8' 2750X1275 6 ENTRANCE
MAIN
UDO
ODU
SUNK BY 75 MM SUNK BY 75 MM 9'X4'-2" LOBBY LOBBY STILTED STILTED
9'-8"X10'-2"
2950X3100 2M WIDE PASSAGE 9'-8"X10'-4"
2950X3100 + 44.50 ENTRANCE
5025X4650
LOBBY - T5 ENTRANCE
5025X4550
LOBBY - T6 + 44.50
UDO
5
ODU
K 1525X2450 1525X2450 9'X4'-2"
2750X1275 ENTRANCE ENTRANCE
5700X10540
LOBBY - T5 5850X10540
IN WARDROBE
8'0"X5'0"
5'X8' 5'X8' 18'-8"X34'-7" 18'-8"X34'-7"
WALK2450X1525
FRD BUS FHC + 44.45
FB-0.3 MTR
450.00000000 [1'-6"]
3350X3550
BEDROOM P.L.02 GOODS/SERVICE FIRE LOBBY
11'X11'-8" UP 2950X2900
P.L.01 3000X3450 3650X3450
LIFT 1975X2200 2900X2300
F.L 400.00000000 [1'-4"] UP
1000 MM WIDE PASSAGE KITCHEN 9'-8"X9'-6" 9'-10"X11'-4" 12'X11'-4" 6'-6"X7'-3" 9'-6"X7'-7"
P.SHAFT
ELV DB DB LIVING 8'X13'
2450X3970 ELV
3500X6750
DECK
SUNK BY 150 MM CHILDREN 11'-6"X22'-2"
2600X1525 3350X3950
BEDROOM GUEST BEDROOM SUNK BY 200 MM
780 [2'-7"]
1525X2450 5'X8' K 7'-10''X13' LOBBY UP DN 3050X3100
FCC 3100X3100
FCC DN UP 325 [1'-1"]
Q
10'-2"X9'-8"
3100X2950 10'X10'-2" 10'-2''X10'-2"
925 [3']
WIDE
2.0
STM
BEAM TO BE MINIMUM DEPTH SUNK BY 150 MM + 44.85 1325 [4'-4"]
ODU
ODU
3 NOS 3050X1665
DECK GLAZING
10'X5'6" 3/4 PROJECTION ABOVE
X X
STUDY ROOM FOYER KITCHEN + 44.85 + 44.85
3970X2450 2700X2800 FRD 3970X2450 SUNK BY 200 MM DROP OFF AREA
G+22
13'X8' FRD 8'-10"X9'-2" 13'X8'
ODU ODU UDO UDO + 43.90 ODU ODU UDO UDO
675 [2'-3"]
675 [2'-3"]
K DINING K
TOILET 28'-8"X8'-2"
8750X2500 TOILET
2450X1525
8'X5' 2450X1525
8'X5' 6.0M DRIVE WAY
PARENTS SUNK BY 75 MM SUNK BY 75 MM KIDS
4075X3450
BEDROOM DB ELV DB 4075X3450
BEDROOM DB ELV DB
TOILET
1525X2450 5'X8'
M.TOILET 1525X2450
5'X8'
925 [3']
925 [3']
K
K
1375 [4'-6"] 1375 [4'-6"]
6150X1525
DECK
ODU
BEAM TO BE MINIMUM DEPTH 20'-2"X5' BEAM TO BE MINIMUM DEPTH
ODU ODU ODU
RAMP
UP
LVL +41.95M
9 M.WIDE DRIVEWAY
LVL +43.9M
2400 2400
9.0 M. W.RAMP UP
RAMP LENGTH 36.00M ,SLOPE 1:18.5
SUBSTATION
RAMP LENGTH 9.00M
SLOPE 1:20
16000.0 [52'-6"]
RAMP UP
B1 B2 P. ENTRY/ EXIT
LVL +41.50M
GROUND FLOOR
Client:
VENTILATION SHAFT PRL Developers Pvt. Ltd
ABOVE FOR B2 8th Floor, Piramal Tower Ganpatrao
Kadam Marg - Lower Parel Peninsula
Corporate Park
400013, Mumbai
SEC B
01 Architect
1 x 1 x 1 Meter Sump Hafeez
MLCP BASEMENT B2 required.
Contractor
( TOTAL CARS/ FLOOR=70 NOS.) 29 Bank Street, Fort, Mumbai 400 023 Tel : 2266 1920
BIG CARS -36 CONTRACTOR IT SHALL NOT BE COPIED OR REPRODUCED IN ANY MANNER
AND SHALL BE USED ONLY DOR THE PROJECT ISSUED DOR . THIS DRAWING
TO BE EXECUTED ON SITE SUBJECT TO APPROVAL OD COMPETENT
AUTHORITY.
HANDICAP CAR-1
Issued:
TENDER DRAWING
Project : Zone :
Piramal Revanta- Mumbai,
Maharashtra
Phase-II Mulund
01 BASEMENT-2 PLAN
201 SCALE 1:250 Title :
PR-A-TD-MLCP-FP-201 R0