A1.0.0.pr - 41-SITE PLAN2 - LD Comments
A1.0.0.pr - 41-SITE PLAN2 - LD Comments
A1.0.0.pr - 41-SITE PLAN2 - LD Comments
Install storm drain inlets along north curb line per City Standards. Your design
from the pavement widening is conveyed to the drainage system per City Standards.
team needs to determine locations.
shown future curb & gutter Project is required to Design driveways to City standards.
existing edge and existing driveways on construct curb & gutter Width = 16' minimum, 24' max.
Upto what length and driveways per City
of pavement the North of Renz Lane for standards Developers team to analyze properties to the north for site drainage. This is due to project widening and the
shall we show this
reference only. need to capture stormwater runoff using City standard curb gutter and drainage inlets. Onsite drainage from End new curb and gutter (conform to existing curb and gutter).
two way turn lane? the properties on the north side shouldnt be obstructed and should be able to flow to Renz Lane. Curb
gutter and driveways required by your project can not block the onsite flow from reaching Renz Lane.
please guide us how to show
REVISIONS:
the connection of proposed
lanes with the existing bike
lane and center lane
Design driveways to City standards.
24' max driveway width.
5.97
6'
6'
Folsom, CA 95630
6'
This is a non-standard curve. Update geometry per
Label proposed centerline AASHTO standards.
radius geometric information UP DNspeed of road is 35mph per City standards.
Design
GILROY, CA
SITE PLAN
UP
PROJECT
TITLE
(P) (P)
(P)
DATE: 04/08/2024
JOB : 17-39
identify pavement restoration information in cross section DWG. BY: HS
CHK. BY: MG
A1.0.0
A SECTION
SCALE-1:6
DETAIL SHEET
4 OF 98