RFQ NO. 6528625-Arzanah Warehouse Facility Retrofitting at SAN campus
Sr. No. Date Clarification requested by Vendor
1 1/19/2024 Flooring for offices is not mentioned. Please clarify.
2 1/19/2024 Please confirm that outside area flooring works is excluded.
3 1/19/2024 Please clarify the location for Ceiling works items C.1 & C.2 4 1/19/2024 Please clarify the location for curtain walls. fitting at SAN campus
KU Response Epoxy Flooring
contractor to put it as an optional
item wherever we have fit-out, ceiling will be included as per site condition