Tentative Line Clear/Outages Request for the month of May-2024 of Bengaluru Transmission Zone pertaining to BMAZ NORTH/SOUTH/BRAZ/CTAZ ZONE,

BESCOM (Yet to be approved from


Duration ofBESCOM)
LC request
Date Time
Name of Wheather
Name of the Name of the Date on which
Name of the the Name of the Load Affected alteranate Power
Sl No KPTCL BESCOM Name of the station/Line Reason for availing LC last LC was Areas Affected Remarks
KPTCL Circle BESCOM BESCOM Division (MW) Supply Arranged
Division Zone From To From To Duration availed
Circle or not

Informed to
TL and SS Div 31.5MVA power transformer -2 of 66/11KV
1 BMAZ South BMAZ SOUTH East Whitefield 04.05.2024 04.05.2024 9:00 15:00 6:00 For carrying quarterly maintenance. 03.02.2024 whitefield area 2.8 Yes BESCOM for load
Hoody 220KV r/s Hoody
change over

Load on the Power


For carrying out periodical Transformer will be
maintenance works as per changed over to
maintenance schedule for 1st quarter 150MVA
TL&SS Somanahalli
TL & SS 150MVA Power Transformer-3 at 220/66/11KV of FY 2024-25. Load on the Power No load will be Transformer-1 and
2 BMAZ South BMAZ SOUTH South Circle and O&M Division, 04.05.2024 04.05.2024 10:00 15:00 5:00 14.12.2023 NIL -
Somanahalli R/S, Somanahalli, Bengaluru. Transformer will be changed over to affected. 220kV Stations of
BESCOM, Kengeri
150MVA Transformer-1and other Subramanyapura
220kV stations. No load will be and Kanakapura.
affected. No load will be
affected.

For connecting Jumps from newly


Transmission Major Works 220KV Nagarbhavi constructed Hybrid Terminal Bay to
3 BMAZ SOUTH West Rajajinagara 05.05.2024 05.05.2024 12:00 2:00 2:00 - in and around Chandra Layout 18 MW No
(Works)Circle Division, North 66/11KV Chandra Layout Station existing66kV BUS at 66/11kV
Chandra Layout substation
For carrying out periodical
No load will be
maintenance works as per
TL&SS Somanahalli affected as 220kV
TL & SS 220KV Somanahalli-Bidadi line-1 at maintenance schedule for 1st quarter No load will be
4 BMAZ South BMAZ SOUTH South Circle and O&M Division, 07.05.2024 07.05.2024 10:00 15:00 5:00 06.02.2024 Nil Somanahalli-Bidadi -
Somanahalli 220/66/11KV R/S, Somanahalli, Bengaluru of FY 2024-25 No load will be affected affected.
BESCOM, Kengeri line-1&2 are in
as 220kV Somanahalli-Bidadi line-1&2
parallel.
are in parallel.

For carrying out periodical


No load will be
maintenance works as per
TL&SS Somanahalli affected as 220kV
TL & SS 220KV Somanahalli-Bidadi line-2 at maintenance schedule for 1st quarter No load will be
5 BMAZ South BMAZ SOUTH South Circle and O&M Division, 08.05.2024 08.05.2024 10:00 15:00 5:00 06.02.2024 Nil Somanahalli-Bidadi -
Somanahalli 220/66/11KV R/S, Somanahalli, Bengaluru of FY 2024-25 No load will be affected affected.
BESCOM, Kengeri line-1&2 are in
as 220kV Somanahalli-Bidadi line-1&2
parallel.
are in parallel.

Adugodi,Salapuria Tower,Big
Bazar,Accenture,KMF
Godown,Nanjappa Layout,New mico Note:LC proposal has
220kV road,Chikkalakshmi Load will be been sent in April-24
HSR Layout: S12 Maintenanace of 11kV Bus, bank 1 Sobha Forest Apartments,
6 BMAZ South Subramanyapu BMAZ SOUTH South 66/11 KV Sobha Forest View Substation 13.05.2024 13.05.2024 10:00 15:00 5:00 08.12.2023 Layout,Mahalingeshwara 4 changed over by if not approved in
O&M-1 & 2 and Power transformer Talaghattapura
Banagirinagar, Jayanagar 7th block, 6 MW load can be
ra badavane,bangalore BESCOM. April-24 please
BSK2nd stage,BDA layout,
dairy,Forum,Rangadasappa shifted on nearby considerproposal
in May-24
66KV and 11KV Bus maintenance Note:LC has
Complex,Channamanakere
Lakkasandra,Wilson stations 66/11kV
220kV including determination of IR values of been sent in April-24
Achhakatu, Saroja Complex,
Garden,Chinnayyana Sarakki, Nimhans,
7 BMAZ South Subramanyapu BMAZ SOUTH South HSR 66/11KV Padmanabhanagara 13.05.2024 13.05.2024 10:30 15:30 5:00 Bus and replacement of week 18.12.2023 19 if not approved in
Rajivnagar, Padmanabhanagar,
Palya,Chandrappa Nagara,Nimhans Banashankari,
ra insulators (if any) and attending April-24 please
Yarabnagar, TATA
Administrative Silkfarm,
block,Bande ISRO Layout, by
Hotspots Peak load-33MW, consider in May-24
Shastrinagar,Forum,Brundavana
slum,Sunnakal S9 Subdivision Bescom at the time
premises, 9th Main Batashowroom. Load change over- of line clear. 1st Quarterly
Jayanagara and 1st Quarterly maintenance of Slum, NDRI-police quarters, 8th Load Changeover-
8 BMAZ South HSR Layout BMAZ SOUTH South 66/11KV Adugodi Sub-Station 14.05.2024 14.05.2024 10:00 15:00 5:00 17.01.2024 18MW, L.C.maintenance
was approved of on
Koramangala Transformer-2&3 block, 7th block adugodi, NDRI 18MW
Load affected- Transformer-2&3
18.01.2024, but
NIANP, St Johj Hospital, 5th block
15MW BESCOM EE
industrial layout, Mico Bosch, JNC
220kV 11KV Bus, Tr-1 and Tr-2, Banks, 11KV Sorronding, 5th Block KHB colony, Jayanagar divison to
HSR(S10,S12s
9 BMAZ South Subramanyapu BMAZ SOUTH South 66/11KV DLF(Annabel) 14.05.2024 14.05.2024 10:00 15:00 5:00 Bus maintenance of Bank-1,Bank-1A 21.12.2024 Industrial DLF
AreaApartment
5th block, 7th block 5 _ postpone_ the L.C,
subdivision)
ra and Bank2 khb colony, Industrial Area 3rd due to constraints in
block, 8th to 11th main, Industrial field andproposal
Note:LC maintaining
has
Maintenanace of 220kV Bus, 220kV uninterrupted power
220kV area 5th block, Koramangala 3rd, been sent in April-24
Somanahalli-Khodays- supply due to
10 BMAZ South Subramanyapu BMAZ SOUTH South HSR and Jayanagara 220/66/11KV Khodays glass factory station 14.05.2024 14.05.2024 10:00 15:00 5:00 07.01.2024 4th, 5th, 6th Block,
Nill Maruthi nagara, No Load affected ) _
Load Changeover- if not approved in
Subramanyapura Lines and 220kV Wilson colony,
Garden,OLdHombegowda Lalbhag flower show
ra Dabas Madivala,, 14.3MW, 66kV April-24 please
Transformers (150MVA TR-1) Nagara,
Oracle, Madivala,Nagara,
Sampagi Chikka J.C. road,
Adugodi, Peak load-21MW, National college
via E-Mail
consider Date:
in May-24
Shanti Nagar,
Krishna BTSIndustrial
nagara Road, Richmond
Area, 17.01.24. hence L.C.
Quarterly maintenance work of 66kV Load changeover- loads (Load of
BMAZ Jayanagar & Circle,Residency
Davanam Jewellers. not availed on
11 BMAZ South HSR Layout South 66/11KV BMTC S/s 15.05.2024 15.05.2024 10:00 15:00 5:00 PT, 66kV Main BUS, 66kV Breakers 18.10.2023 14.3 MW 16MW) to be
SOUTH Indiranagar Road,sudhamanagara, K.H. Road, 18.01.2024.
and Maintenance of 11kV BUS. Load affected- change over to
Shantinagar,wilson Garden,Double LC was not approved
6.7MW 220kV NIMHANS
Road,subbaiah Circle,siddayya in the month of
R/S or to 66kV
Road, Lalbagh Road February & March-
Victoria S/s
load can be LC was 2024
proposed on
Subramanyapu Maintenanace of 11kV Bus, bank 1,
12 BMAZ South BMAZ SOUTH South Jayanagara : S6 66/11KV Prestige Falcon City Substation 15.05.2024 15.05.2024 10:00 15:00 5:00 03.02.2024 Prestige falcon city apartment 4 changed over by 11.03.2024 but
ra bank 2 and Power transformers
BESCOM. approval. was not
"Periodical
given. 1ST
Quarterly
maintenance work
Note:LC 2024-25
proposal has
been sent in April-24
Subramanyapu Kengeri K1 "
13 BMAZ South BMAZ SOUTH West 66/11KV Provident 15.05.2024 15.05.2024 10:00 15:00 5:00 11kV Bus maintenance works 16.01.2024 Nill Nill _ if not approved in
ra Subdivision
April-24 please
City Market, Avenue road, BVK consider in May-24
iyengar road, RT street, CT street,
Chikkapet, Nagarathpet, SP road,
Vidhana soudha
Town hall, JC road, Minerva Circle, During LC period,
Division (W5, W3, Quarterly maintenance work of 66kV 4MW load will be
BMAZ NORTH West, East KG road, Gandhi
BTM 1st nagar,
stage, Masidi,
Majestic 8MW of load will be
W4), RR nagar Line, Bus and 11kV Bus bar and to affected after
14 BMAZ North NRS & BMAZ and South 66/11 KV Victoria Station 16.05.2024 16.05.2024 10:00 17:00 7:00 17.12.2023 Mysore road police quarters,
apartment,Gurappana palya,AXA,Jai Gori 4 changed over to
Division (W2), attend hot spot in 66kV Transformer 2 changeover of loads
SOUTH Circle palya, nagar,Chocolate
bheem Binny pet, New tharagu pet,
factory road, other Stations by
Jayanagar Division isolator at 66/11kV Victoria Station. to1ST Quarterly
other Stations
Chamarajpet, AM road,
old madiwala,BTM Kalasipalya,
Layout,Asis BESCOM Maintenance work of
(S2)
1)Quarterly Maintenance work of Victoria Hospital,
Bhavan,Bismilah KIMS,
nagar, Bharathi 66/11kV
1) 1ST Quarterly
66/11kV Transformers, 66kV Shankarpuram, Dental college RMU, Peak load-24MW,
layout,St John hostel,koramangala Transformers, 66kV
Jayanagara and Load change over- Load Changeover- maintenance-on
15 BMAZ South HSR Layout BMAZ SOUTH South 66/11KV St John Wood Sub-Station 16.05.2024 16.05.2024 10:00 15:00 5:00 Isolators,66kV CT's & PT's 18.01.2024 SJ park RMU
2nd block,kudre mukha Isolators,66kV CT's
Koramangala 18MW, 18MW 31.5MVA TR-1,TR-2
2)11kV Switchgears maintenance colony,CPWD
Bommanahalli,Quarters, siddartha Peak load-53MW,
HSR Layout, & PT's
& TR-3
Load affected-6MW
colony, tavarekere,
Kudulu, SG palya,
Jakkasandra, Load change over- 2)11kV Switchgears
2)Megging of
BMAZ 220/66/11KV HSR Layout R/s 1 st Quarterly maintenance work of Accenture, St john wood Load Changeover- maintenance
16 BMAZ South HSR Layout South HSR Layout 16.05.2024 16.05.2024 10:00 15:00 5:00 08.01.2024 Kaikondanahalli, 20MW, transformers HV to
SOUTH (66/11KV side only) 31.5MVA Transformer-1, 2 & 3, apartment,Oracle,Maruthinagar,Ven 20MW
Somasundarapalya, Hosapalya, Load affected- LV,Circuit breakers
kateshwara College
Koramanagala 33MW and current
road,Brundavana nagara. transformers.
Duration of LC request
Date Time
Name of Wheather
Name of the Name of the Date on which
Name of the the Name of the Load Affected alteranate Power
Sl No KPTCL BESCOM Name of the station/Line Reason for availing LC last LC was Areas Affected Remarks
KPTCL Circle BESCOM BESCOM Division (MW) Supply Arranged
Division Zone From To From To Duration availed
Circle or not
Load of 66kV
Somanahalli-Jigani
For carrying out periodical line 1 bay [RBI,
maintenance works as per South city] can be
maintenance schedule for 1st quarter changed over to
of FY 2024-25 Load of 66kV 220kV Station,
TL&SS Somanahalli 66KV Somanahalli-Jigani line 1 bay [RBI,
TL & SS Somanahalli-Jigani line 1 bay [RBI, No load will be Khodays. No load
17 BMAZ South BMAZ SOUTH South Circle and O&M Division, South city] at 220/66/11KV R/S, Somanahalli, 16.05.2024 16.05.2024 10:00 15:00 5:00 13.12.2023 Nil -
Somanahalli South city] can be changed over to affected. will be affected.Or,
BESCOM, Kengeri Bengaluru.
220kV Station, Khodays. No load will Load of 66/11kV
be affected. Or, Load of 66/11kV RBI RBI will be affected
will be affected if LC is availed on if LC is availed on
66/11kV RBI station on the same day. 66/11kV RBI
station on the same
day.

RBI layout,Kottanur,J.P Nagar 5th


phase,Shreyas colony,Gaurav
07 MW load can be
nagara,Nataraja layout,Nrupathunga
220kV shifted on nearby LC was proposed on
nagar,Jambusavare
18 BMAZ South Subramanyapu BMAZ SOUTH South HSR and Jayanagara 66/11KV RBI 16.05.2024 16.05.2024 10:00 15:00 5:00 Periodic maintainance works 13.12.2024 20 stations by 13.03.2024 but
dinne,Chunchughatta,Brigade
ra BESCOM at the approval was not
Millenium & Briagde Gardenia
time of Line clear. given.
appartments and areas surrounding
the sub-station.

Byrohalli, Ramohalli, Kengeri Town,


Bidadi Rural, Devikiran, Deccan
Note:LC proposal has
Herrald, KAIDB 1st phase,KAIDB
been sent in April-24
Subramanyapu Kengeri(K1 2nd phase, Geruplaya industrial
19 BMAZ South BMAZ SOUTH West 66/11KV Kumbalagodu 16.05.2024 16.05.2024 10:00 15:00 5:00 Periodic maintainance works 30 No if not approved in
ra subdivision) area, ISRO, Gonipura,BGS,
April-24 please
Kengeri,Brigade ponorama,Srirama
consider in May-24
badavane, Kanminike,Sandeep
thota, Chalghatta, MLC compound.

All feeders have


change over on
Quarterly maintenance of 31.5MVA T-
TL and SS Div South and IndiraNagar & F-GM palya, F11-vignayan nagar, nearby stations
20 BMAZ South BMAZ SOUTH 66/11KV Bagmane Tech Muss 17.05.2024 17.05.2024 9:00 17:00 8:00 1&2, Tan Delta by R&D, Bus GOS, 07.10.2023 5MW Yes
Hoody East Koramangala F13- Ayappanagar except F8, F11 &F13
11KV Switchgears maintenance.
have only partial
change overs..

66/11kV Shoba Apartment Sub- Peak load-25MW,


station for: Load changeover- Periodical 1ST
Sarjapura,Cessana garden,Outer
1)Quarterely Maintenance work of 12 MW Quarterly
ring road,Central mall,Exora
BMAZ HSR Layout & 66/11kV Transformers, 66kV Load affected-13 maintenance work
21 BMAZ South HSR Layout South 66/11KV Shoba Apartment S/s 17.05.2024 17.05.2024 10:00 15:00 5:00 45254 Business park,Shobha Load changeover-
SOUTH Koramangala Breakers,66kV CT's & PT's. MW 2024-25
Apartments,Salarpuria 12 MW
2)11kV Breaker maintanance 3) Tan-
Softzone,Thakshasheela Health care. Load of 66/11kV
Delta test for 66kV CTS and Timer,
Station,
CRM for 66kV Breakers.
Anjanapura may be
For carrying out periodical changed over to
maintenance works as per 220kV Khodays.
maintenance schedule for 1st quarter Load of 66/11kV
of FY 2024-25. Load of 66/11kV Station,
Station, Bannerghatta may be changed Bannerghatta may
TL&SS Somanahalli 66KV Somanahalli-Jigani line-2 bay
TL & SS over to 220kV Station, Jigani or load of No load will be be changed over to
22 BMAZ South BMAZ SOUTH South Circle and O&M Division, [Somanahalli-Bannerghatta-Anjanapura] at 17.05.2024 17.05.2024 10:00 15:00 5:00 18.01.2024 Nil -
Somanahalli 66/11kV Station Bannerghatta may be affected. 220kV Station,
BESCOM, Kengeri 220/66/11KV R/S, Somanahalli, Bengaluru.
affected if LC of 66/11kV Jigani or load of
Bannerghatta is approved on the same 66/11kV Station
day. Load of 66/11kV Station, Bannerghatta may
Anjanapura may be changed over to be affected if LC of
220kV Khodays. 66/11kV
Bannerghatta is
approved on the Previously date of
04 MWsame day.
load can be Station LC was on
ISRO Layout, ISRO layout Ind. Area,
220kV shifted on nearby 06.02.2023.
Jayanagara(S5 Kumarswamy layout, Vittal nagara,
23 BMAZ South Subramanyapu BMAZ SOUTH South 66/11KV ISRO Layout 17.05.2024 17.05.2024 10:00 15:00 5:00 Periodic maintainance works 45245 15 stations by LC was proposed on
Subdivision) Vikram nagar, Ilyaznagar,
ra BESCOM at the 23.05.2023 but
Yelchenahalli, surrounding area.
time of Line clear. approval was not
given.

Weavers coloney, Gottigere,


Note:LC proposal has
For carrying out maintenance work on Mantapa, Purvankara, AMC College, BESCOM to make
220kV been sent in April-24
Ramanagar HSR and 66kV BUS, 66kV BUS GOS, 66kV Ragihalli, Kasaraguppe, National alternate
24 BMAZ South Subramanyapu BMAZ SOUTH 66/11KV Bannerghatta station 17.05.2024 17.05.2024 10:00 15:00 5:00 18.01.2024 17 if not approved in
a and South Chandapura Transformer Isolators, 11kV Park, Basavanapura, Mylasandra, arrangements at
ra April-24 please
Switchgear maintenance work. Bytarayandoddi, Lakshmipura, 11kV side.
consider in May-24
Shivanahalli and surrounding Areas
Duration of LC request
Date Time
Name of Wheather
Name of the Name of the Date on which
Name of the the Name of the Load Affected alteranate Power
Sl No KPTCL BESCOM Name of the station/Line Reason for availing LC last LC was Areas Affected Remarks
KPTCL Circle BESCOM BESCOM Division (MW) Supply Arranged
Division Zone From To From To Duration availed
Circle or not

All feeders have


Attending Hot Line observations, OLTC change over on
Overhauling of 31.5MVA Trf-2, and for nearby stations. Also
TL and SS Div
25 BMAZ South BMAZ SOUTH East Indiranagar 66KV NGEF MUSS 18.05.2023 18.05.2023 10:00 17:00 7:00 carrying out station bays CT's Tan 30.12.2023 Nil Nil Yes BMRCL will be
Hoody
Delt testing by RT and quarterly change over to
maintenance. 220KV HAL during
LC period.

During LC Period
BMAZ NORTH Quarterly Maintenance works of 1.3MW load will be
Global mall, Sobha Indraprastha
26 BMAZ North NRS & BMAZ North, West Vidhana Soudha 66/11 KV Shoba Indra prastha Station 18.05.2024 18.05.2024 10:00 17:00 7:00 station equipments at 66/11kV Sobha 20.12.2023 1.3 affected as per
Apartment
SOUTH Indraprastha Substation concerned
BESCOM officials.

Alternative power
TL and SS Div Whitefield and 31.5MVA power transformer -01 of For carrying 1st quarterly maintenance suplly arranged for
27 BMAZ South BMAZ SOUTH East 18.05.2024 18.05.2024 10:00 13:00 3:00 11.11.2023 Nil Nil Yes
Hoody indirangara 220/66/11KV ITI GIS station and periodical tan delta test. all feeders from
BESCOM

Alternative power
TL and SS Div Whitefield and 31.5MVA power transformer -02 of For carrying 1st quarterly maintenance suplly arranged for
28 BMAZ South BMAZ SOUTH East 18.05.2024 18.05.2024 13:00 17:00 4:00 17.11.2023 Nil Nil Yes
Hoody indirangara 220/66/11KV ITI GIS station and periodical tan delta test. all feeders from
BESCOM

Informed to
TL and SS Div 31.5MVA power transformer -1 of 66/11KV For carrying quarterly maintenance
29 BMAZ South BMAZ SOUTH East Whitefield 18.05.2024 18.05.2024 9:00 15:00 6:00 30.09.2023 Nil Nil Yes BESCOM for load
Hoody 220KV r/s Hoody work
change over

10MW load will be


affected. Bus
coupler changeover
Informed to
For carrying 3rd quarterly is available for
TL and SS Div 31.5MVA power transformer -1 of 66/11KV BESCOM for load
30 BMAZ South BMAZ SOUTH East Whitefield 18.05.2024 18.05.2024 9:00 17:00 8:00 maintenance work and OLTC 09.09.2023 whitefield area 10MW Bank-1, and Bank-
Hoody Kadugodi station change over. MOM
Overhauling work 1A feeders. And
Enclosed.
also change over
can be arraged by
BESCOM postpone the L.C,
S1-Nimhans, KIDWAI, Rajiv Gandhi, due to constraints in
Sanjay Gandhi, Indira Gandhi, field and maintaining
Jayanagar-1st,2nd,3rd,4th ,9th T uninterrupted power
block Someshwaranagar supply due to
Peak load-24MW,
S2- Wilson Garden Lalbhag flower show
BMAZ Jayanagara and Quarterly maintenance work of 66kV Load change over- Load Changeover-
31 BMAZ South HSR Layout South 220/66/11KV NIMHANS R/S 18.05.2024 18.05.2024 10:00 15:00 5:00 21.10.2023 S16-Accenture IBC Tech park, via E-Mail Date:
SOUTH Koramangala PT, 66kV Main BUS and 66kV Isolators 18MW, 18MW
Bannerghatta road 17.01.24. hence L.C.
Load affected-6MW
W2- RV road, MNK park, Gandhi not availed on
bazar 20.01.2024.
"Periodical 1ST
Quarterly
layout,SRK gardens,NAL layout,Tilak maintenance work
nagar,9th block Jayanagar,partial
4th T block,Shanthi park and
apartment,Jayadeva hospital,Ranka
colony road and surrounding,NS Arrangement can
Peak load-35MW,
1)Periodical Quarterly-4 Maintenance palya main road,GRB main be done from Periodical 1ST
Jayanagar, Load change over-
BMAZ work of 66/11kV Transformers, 66kV road,Jain temple road,some parts of BESCOM end Quarterly
32 BMAZ South HSR Layout South Koramangala,BTM & 66/11KV Jayadeva S/s 18.05.2024 18.05.2024 10:00 16:00 6:00 20.01.2024 8MW,
SOUTH Isolators,66kV CT's & PT's 2)11kV BTM 4th stage, Vaishya bank through maintenance work
Hulimaavu Load affected-
Switchgears maintenance colony,BTM 2nd stage,MCHS changeovers for 2024-25
27MW
layout,BHCS layout,Shantiniketan load of about 8MW
school,Mico layout,7th main, Mantri
apartment, & surrounding
areas,Oracle,IBM & SPAR,
Gurappanapalya full area,Timber buscoupler will be * Attending Hotline
used and load will Observations of
be affected 220kV Bus
partially. * Quarterly
* Attending oil Leakage
Bank-2 & Bank-3 Load will not be Maintenance of Bus
220/66/11KV Naganathpura R/s * Hotline Observations
load will be affected as the load Isolators
BMAZ
33 BMAZ South HSR Layout South HSR 18.05.2024 18.05.2024 10:00 17:00 7:00 20.01.2024 NIL affected partially will be change over "Periodical 1ST
SOUTH 66KV/11KV Transformer Bays * Quarterly maintenance of
buscoupler will be on 220kV HSR - Quarterly
" 66kV/11kV Transformer Bays
used during Line Mylasandra Line 1 maintenance work
clear period one by 2024-25"
one. Load will be
affected for 5MW
for each Bank.-1 &
Duration of LC request
Date Time
Name of Wheather
Name of the Name of the Date on which
Name of the the Name of the Load Affected alteranate Power
Sl No KPTCL BESCOM Name of the station/Line Reason for availing LC last LC was Areas Affected Remarks
KPTCL Circle BESCOM BESCOM Division (MW) Supply Arranged
Division Zone From To From To Duration availed
Circle or not

Observations of
220kV Bus
* Quarterly
Maintenance of Bus
Peak load-225MW,
Load will not be Isolators
load changeover-
220kV Line Quarterly affected partially as "Periodical 1ST
220/66/11KV Naganathpura R/s 10MW,
BMAZ maintenance ,150MVA Trf-1 & the load will be Quarterly
34 BMAZ South HSR Layout South HSR 220KV Mylasandra Line,220KV HSR 18.05.2024 18.05.2024 10:00 15:00 5:00 22.10.2023 NIL load affected-6MW
SOUTH 150MVA Trf-2 Quarterly maintenance change over on maintenance work
Line,150MVA TRF-1& 150MVA TRF-2 (Downstream
work 66kV HSR Layout 2024-25
station 90MW will
Line 2 Line Clear will be
be removed)
taken only 66kV
Velankanni Line Line
clear approved on
20.04.2024
* Attending Hotline Observations of
66kV Bus*
* Quarterly maintenance of 66/11kV, Peak load-32MW,
20MVA Power Transformers. Electronic City Ph-1, Neeladri Road, load changeover- "Periodical 1ST
66/11KV Electronic City S/s
BMAZ HSR Layout & * Quarterly Maintenance of Bus Hebgodi, Veersandra, Golahalli,EHT 10MW, Load Changeover- Quarterly
35 BMAZ South HSR Layout South (66/11KV Hulimangala S/s since it is radially 18.05.2024 18.05.2024 10:00 17:00 7:00 17.12.2023
SOUTH Chandapura Isolators and 66kV Drake conductor Infosys, 66/11kV Hulimangala load affected- 10MW maintenance work
fed from 66/11KV Electronic City S/s)
Bus. station feeding areas. 22MW 2024-25
* Quarterly maintenance of 66kV Bays
& 38Nos 11kV Switchgears

* Attending Hotline Observations of


66kV Bus
* Quarterly Maintenance of Bus Electronic City Ph-1, Doddathagur, Peak load-25MW, "Periodical 1ST
66/11KV Electronic City Ph-2 Sec-1 Isolators Bommanahalli, NJR Layout, load changeover- Load Changeover- Quarterly
36 BMAZ South HSR Layout BMAZ SOUTH South HSR Layout 18.05.2024 18.05.2024 10:00 15:00 5:00 17.12.2023
(Velankani) S/s * Quarterly maintenance of 66kV Chikkthogur, Hongsandra, 16MW, 16MW by bescom maintenance work
Velankani, Keonics Bay & Transformer Konnappana Agrahara. load affected-9MW 2024-25
Bays

* Attending Hotline Observations of


66kV Bus
Electronic City ph-2, Veersandra, Peak load-40MW,
* Quarterly Maintenance of Bus "Periodical 1ST
66KV Electronic City Ph2 sec2 (Malgudi) S/s & Doddanagamangla, Ananthanagara, load changeover-
BMAZ HSR Layout, Isolators Load Changeover- Quarterly
37 BMAZ South HSR Layout South 66/11KV Chokkasandra S/s since it is radially 18.05.2024 18.05.2024 10:00 15:00 5:00 16.12.2023 Shantipura, EHT Biocon, EHT 17MW,
SOUTH Chandapura * Quarterly maintenance of 66kV 17MW by BESCOM maintenance work
fed from 66/11KV Electronic City ph2 sec2 S/s Techmahendra, EHT Tata BP Solar, load affected-
Naganathapura Line-1&2, 66kV 2024-25
66/11kV Chokkasandra S/s 23MW.
Chokkasandra Bays, EHT Biocon &
Techmahindra Bays, Transformer Bays

Load of EHTs AO
For carrying out periodical Smith, Bhoruka
maintenance works as per Gas, Orchid
maintenance schedule for 1st quarter Laminates Unit-1
TL&SS Somanahalli
TL & SS 66KV Somanahalli-Harohalli line-2 bay at of FY 2024-25. Load of EHTs AO No load will be and Saint Gobain
38 BMAZ South BMAZ SOUTH South Circle and O&M Division, 18.05.2024 18.05.2024 10:00 15:00 5:00 17.12.2024 Nil -
Somanahalli 220/66/11KV R/S, Somanahalli, Bengaluru. Smith, Bhoruka Gas, Orchid affected. may be changed
BESCOM, Kengeri
Laminates Unit-1 and Saint Gobain over to 220kV
may be changed over to 220kV KIADB KIADB Harohalli.
Harohalli. No load will be affected. No load will be
affected.

1.220kV BUS:
220kV Bus Isolators maintenance and
replacement of deterioted clamps of Arehalli, Ittamadu, AGS Layout, 08 MW load can be Note:LC proposal has
220kV BUS and Bus Isolators. Chikalsandra, TG Layout, shifted on nearby been sent in April-24
Jayanagara( S5 and
39 BMAZ South Subramanyapu BMAZ SOUTH South Zone 220/66KV Subramanyapura 18.05.2024 18.05.2024 11:00 16:00 6:00 For attending hot spots, 18.11.2023 Bhuvneshwarinagar and areas 40 stations by if not approved in
S18 subdivision)
ra Maintenance of 220kV Bus Potential surrounding the sub-station. BESCOM at the April-24 please
transformer. time of Line clear. consider in May-24
2.Battery charger and DCDB
maintenance.

* 66kV BUS: - 66kV BUS GOS 04-05 MW load can Note:LC proposal has
ISRO Layout, ISRO layout Ind. Area,
220kV maintenance be shifted on been sent in April-24
Jayanagara(S15, S18 Kumarswamy layout, Vittal nagara,
40 BMAZ South Subramanyapu BMAZ SOUTH South Zone 66/11KV Arehalli 18.05.2024 18.05.2024 11:00 16:00 6:00 * Maintenance of 66kV PT 18.11.2023 16 nearby stations by if not approved in
subdivision) Vikram nagar, Yelchenahalli,
ra * Bank1 & Bank-2 -11kV Bus BESCOM at the April-24 please
surrounding area.
maintenance of Bank-1 & Bank2 time of Line clear. consider in May-24

Alternative power
TL and SS Div Whitefield and 31.5MVA power transformer -03 of For carrying 1st quarterly maintenance suplly arranged for
41 BMAZ South BMAZ SOUTH East 19.05.2024 19.05.2024 10:00 15:00 5:00 25.11.2023 Nil Nil Yes
Hoody indirangara 220/66/11KV ITI GIS station and periodical tan delta test. all feeders from
BESCOM

* Attending Hotline
Observations of
220kV Bus
* Quarterly
load change over - Load will not be
Maintenance of Bus
Quarterly maintenance work of 66kV 140MW from affected as the load
BMAZ 220/66/11KV HSR R/s 220KV HSR Isolators
42 BMAZ South HSR Layout South HSR Layout 19.05.2024 19.05.2024 10:00 17:00 7:00 PT, 66kV Main BUS, 66kV Breakers 21.01.2024 NIL existing 220kV will be change over
SOUTH Mylasandra Line 1 "Periodical 1ST
and Maintenance of 11kV BUS. Hsr-Mylasandra on 220kV HSR -
Quarterly
line -2 Mylasandra Line 1
maintenance work
2024-25
Duration of LC request
Date Time
Name of Wheather
Name of the Name of the Date on which
Name of the the Name of the Load Affected alteranate Power
Sl No KPTCL BESCOM Name of the station/Line Reason for availing LC last LC was Areas Affected Remarks
KPTCL Circle BESCOM BESCOM Division (MW) Supply Arranged
Division Zone From To From To Duration availed
Circle or not

For carrying out periodical


Load of 220kV
maintenance works as per
Subramanyapura
TL&SS Somanahalli maintenance schedule for 1st quarter
TL & SS 220KV Somanahalli-Khodays line bay at No load will be and Khoday's may
43 BMAZ South BMAZ SOUTH South Circle and O&M Division, 19.05.2024 19.05.2024 10:00 15:00 5:00 of FY 2024-25. 25.02.2024 Nil -
Somanahalli 220/66/11KV R/S< Somanahalli affected. be changed over to
BESCOM, Kengeri Load of 220kV Subramanyapura and
220kV Peenya. No
Khoday's may be changed over to
load affected.
220kV Peenya. No load affected.
All feeders have
Quarterly maintenance 20MVA T-3 &
TL and SS Div change over on B
44 BMAZ South BMAZ SOUTH East IndiraNagar 66/11KV B station 20.05.2024 20.05.2024 9:00 16:00 7:00 feeders to carry out IR &PI test & TAN 21.11.2023 Nil Nil Yes
Hoody station & nearby
DELTA by RT staff.
Vivek nagar, Trinity Church, Vijaj stations.
on Tr-2 through
bank, Hotel Taj,Victoria layout,
Buscoupler from
1. Periodical Maintenance work( 1st Museum Road, Albert street, king
10:00 to 11:25 Hrs
Quarterly) of 66kV EDC line, 3x20MVA street, Museum cross road, Lavelle
- No load affected
Tr's, Bus GOS, line GOS, 66kV road, St. mark road, Y.G.Palya,
2. Tr-2 load taken
Breakers, 66kV CT's and 66kV PT's. KSRP, ITC hotel, Richmond road,
Koramangala, on Tr-1 through Load Change Periodical 1st
BMAZ South & 2. Periodical Maintenance work of Vannerpet, Life Style, M.G.Road,
45 BMAZ South HSR Layout Indiranagar and 66/11KV Austin Town S/s 20.05.2024 20.05.2024 10:00 15:00 5:00 18.11.2023 Buscoupler from over=14MW by Quarterly
SOUTH East 11kV switchgears Hayes Road, Convent Road,
Jayanagar 11:30 Hrs to 01:00 BESCOM maintenance work.
3. Tan Delta test on 66kV EDC line bay S.L.Apartment, Richmond Town,
Hrs- No load
and CRM test on 66kV EDC line Najappa circle, Stain garden,
affected.
breaker Richmond Park, Longford Road,
3. 66kV Incoming
Braight street, Foodworld road,
line L.C required
Johnson market, BWSSB water
from 01:05 Hrs to
supply, longford road, Ashoknagar, All feeders have
Quarterly maintenance 20MVA T-4 &
TL and SS Div change over on B
46 BMAZ South BMAZ SOUTH East IndiraNagar 66/11KV B station 21.05.2024 21.05.2024 10:00 16:00 6:00 feeders & attending OLTC trouble by 16.10.2023 Nil Nil Yes
Hoody station & nearby
RT staff.
Load of 66kV stations.
Somanahalli-Jigani
line 1 bay [RBI,
For carrying out periodical
South city] can be
maintenance works as per
changed over to
maintenance schedule for 1st quarter
220kV Station,
TL&SS Somanahalli 66KV Somanahalli-Subramanyapura line-1 of FY 2024-25 Load of 66kV ISCKON
TL & SS No load will be Khodays. No load
47 BMAZ South BMAZ SOUTH South Circle and O&M Division, [ISCKON] bay at 220/66/11KV R/S, 21.05.2024 21.05.2024 10:00 15:00 5:00 may be changed over to 220kV 21.03.2024 Nil -
Somanahalli affected. will be affected.Or,
BESCOM, Kengeri Somanahalli, Bengaluru. Subramanyapura or load of 66/11kV
Load of 66/11kV
ISCKON station will be affected if LC is
RBI will be affected
availed at 66/11kV ISCKON station on
if LC is availed on
the same day.
66/11kV RBI
station on the same
day.
66kV BUS:
1) Maintenance of Bus isolators & 03 MW load (out of
66kV Bus, Manthri apartment, 7 MW) can be
220kV LC was proposed on
2) 66kV PT Maintenance. Thalaghattapura, Raghuvanagalli, shifted on nearby
48 BMAZ South Subramanyapu BMAZ SOUTH south Jayanagara 66/11KV ISKCON 21.05.2024 21.05.2024 10:00 14:00 4:00 22.12.2024 4 06.03.2024 but
3) 11kV Bus maintenance of Bank-1 Gublala, kuvempu nagar, VV nagar; stations by
ra approval was not
and Bank-2. VV layout, Balaji Layout, Royal form BESCOM at the
given.
4) Battery charger and DCDB time of Line clear.
maintenance.

Note:LC proposal has


Jayanagara : S6
220kV Konanakunte, Thalaghattapura, 02 MW load can be been sent in April-24
O&M-1 & 2
49 BMAZ South Subramanyapu BMAZ SOUTH South 66/11KV Khodays Glass Factory station 21.05.2024 21.05.2024 10:00 15:00 5:00 Periodic maintainance works 24.11.2023 Doddakallasandra, Shreenidhi 12 MW changed over by if not approved in
and HSR Layout: S12
ra layout, Avalahalli. BESCOM. April-24 please
O&M-1 & 2
consider in May-24

Peak load-
10.0MW,
1. Periodical Maintenance work (1st
Load change over-
Quarterly) of 1x20MVA Tr's, Bus GOS,
9.0MW,
line GOS, 66kV Breakers, 66kV CT's BWSSB STP, Jakkasandra, HSR 5th
Load affected-1MW Load Change Over- Periodical 1st
HSR Layout & and 66kV PT's. Sector teachers colony, part of
50 BMAZ South HSR Layout BMAZ SOUTH South 66/11KV Jakkasandra S/s 22.05.2024 22.05.2024 10:00 15:00 5:00 24.01.2024 9.0 MW by Quarterly
Koramangala 2. Periodical Maintenance work of Venkatapura, Greenage Apartment,
01 MW load BESCOM maintenance work.
11kV switchgears Koramangala extention
affected from
10:00 to 15:00
Hrs, due to there
is only one Bank
For carrying out periodical
TL&SS Somanahalli maintenance works as per No load will be
TL & SS 220KV Somanahalli-Mylasandra line-1 at No load will be
51 BMAZ South BMAZ SOUTH South Circle and O&M Division, 22.05.2024 22.05.2024 10:00 15:00 5:00 maintenance schedule for 1st quarter 07.11.2023 NIL affected as both are -
Somanahalli 220/66/11KV R/S, Somanahalli, Bengaluru. affected.
BESCOM, Kengeri of FY 2024-25. No load will be affected source stations.
as both are source stations.
Srinagara , hosakerehalli , pes engg
college , veerbhadranagara , Bank
colony , Hanumanthnagara ,
girinagara , seetha circle , 08 MW load can be
Jayanagar and RR 1) Attendending Hotspot and
220kV vidhyapeeta circle , pramod layout , shifted on nearby LC was proposed on
West & nagara (W1,W2,W6, maintenance of 66KV Bus and 11KV
52 BMAZ South Subramanyapu BMAZ SOUTH 66/11KV Banashanakari 22.05.2024 22.05.2024 10:00 15:00 5:00 22.11.2023 muneshwara block ,nagendra 40 stations by 23.03.2024 but
South W7 & S15 Bus
ra block , Bull temple Road , BESCOM at the approval was not
Subdivisions) 2) Maintenance of all equipments
kathriguppe , Avalahalli ,Sterling time of Line clear. given.
apartment ,NTY Layout ,
Thyagarajanagara , Basavangudi ,
BSK 3rd stage

Note:LC proposal has


been sent in April-24
Subramanyapu Kengeri(K1 150MVA Tr-2 respective BUS Periodic
53 BMAZ South BMAZ SOUTH West 220KV Kumbalagodu GIS 22.05.2024 22.05.2024 10:00 15:00 5:00 24.01.2024 Nill Nill _ if not approved in
ra subdivision) maintainance works
April-24 please
consider in May-24

Note:LC proposal has


been sent in April-24
Subramanyapu Kengeri(K1 150MVA Tr-1 and respective BUS
54 BMAZ South BMAZ SOUTH West 220KV Kumbalagodu GIS 23.05.2024 23.05.2024 10:00 15:00 5:00 23.01.2024 Nill No Load affected _ if not approved in
ra subdivision) Periodic maintainance works
April-24 please
consider in May-24
Duration of LC request
Date Time
Name of Wheather
Name of the Name of the Date on which
Name of the the Name of the Load Affected alteranate Power
Sl No KPTCL BESCOM Name of the station/Line Reason for availing LC last LC was Areas Affected Remarks
KPTCL Circle BESCOM BESCOM Division (MW) Supply Arranged
Division Zone From To From To Duration availed
Circle or not

KSIT College,8th Block


1) Maintenance work of line bay Note:LC proposal has
Anjanapura,weavers
220kV equipments such as 66kV LA, GOS, been sent in April-24
coloney,Purvankara
55 BMAZ South Subramanyapu BMAZ SOUTH South HSR (S12), 66/11KV Anjanapura 23.05.2024 23.05.2024 10:00 15:00 5:00 CT, PTs etc 16.01.2024 10 No if not approved in
Apartment,Amruthnagara,SP
ra 2) 66kV BUS Isolators April-24 please
thota,Vaddarapalya,Kembathahalli
maintenance/alignment work. consider in May-24
and area surronding sub-station.
3) 66kV & 11kV Bus maintenance.

BMAZ NORTH RR Nagar,Rajaji Load changeover


East,West,S Areas feeding from 66/11kV Kengeri
56 BMAZ North NRS & BMAZ nagar,Kengeri,Jayana 66/11 KV Kengeri satellite Town station 24.05.2024 24.05.2024 10:00 17:00 7:00 Quarterly maintenance 29.11.2023 10 will be done by
outh Sateelite Town S/s
SOUTH gar,Vidhanasoudha BESCOM

Vishwapriya Layout , Begur koppa


220kV 11KV Bus, Tr-1 and Tr-2, Banks, 11KV Road, devarachikkanahalli,
HSR(S10,S12
57 BMAZ South Subramanyapu BMAZ SOUTH South 66/11KV Soudella 24.05.2024 24.05.2024 10:00 15:00 5:00 Bus maintenance of Bank-1,Bank-1A 19.01.2024 Akshyanagara, Prestige Song of 15 No
subdivision)
ra and Bank2 South, tejaswini Nagara, Hirnadani
Aparatent and surrounding Areas

Mylasandra , Ideal
66kV BUS: homes ,Uttarahalli ,
1) Maintenance of Bus isolators & sachidanandanagar,Vaddarapalya ,
05 MW load can be Note:LC proposal has
66kV Bus, Gaanakalu, BEML Layout,
220kV RR Nagar/ shifted on nearby been sent in April-24
2) 66kV PT Maintenance. Rajarajeshwari temple ,
58 BMAZ South Subramanyapu BMAZ SOUTH South Kengeri division/ 66/11KV Substation, Rajarajeshwarinagar 24.05.2024 24.05.2024 10:00 15:00 5:00 16.11.2023 35 stations by if not approved in
3) 11kV Bus maintenance of Bank-1, Pattanagere , Global village, BGS
ra Jayangar BESCOM at the April-24 please
Bank-2 and Bank2A. Hospital, part of kengeri,
time of Line clear. consider in May-24
4) Battery charger and DCDB Channasandra,Vaddarapalya,Uttara
maintenance. halli, Poorna Prajna Layout, BHCS
Layout and surrounding areas
L.C. was approved on
22.01.2024, but
66/11kV Devarabisanahalli sub- BESCOM AE (M)
Peak load-22MW,
station for: Belladur S11 Sub
load changeover-
1)TAN-Delta test of 20MVA Power Division Someshwara
10MW,
Transformer 2 by RT Bellandur,RMZ,Devarabisanahalli,K O&M postpone the
load affected-12
BMAZ HSR Layout & 2)Quarterely Maintenance work of ariyammanapalya,Akme Load Changeover- L.C, due to
59 BMAZ South HSR Layout South 66/11KV Devarabisanahalli S/s 25.05.2024 25.05.2024 10:00 15:00 5:00 11/23/2023 MW
SOUTH Koramangala 66/11kV Transformers, 66kV projects,Anupama,Total 10MW constraints in field to
Isolators,66kV CT's & PT's. Mall,Shobha IRIS arrange alternate
3)11kV Breaker maintanance power supply via E-
4)CRM & Timer Test of 66kV Breakers Mail Date:
by RT 20.01.2024. hence
L.C. not availed on
22.01.2024.
All feeders have
Quarterly maintenance of 20MVA T- change over on
TL and SS Div South and IndiraNagar & 1&2, Bus GOS, 11KV Switchgears nearby stations
60 BMAZ South BMAZ SOUTH 66/11KV Leela Venture Muss 27.05.2024 27.05.2024 9:00 17:00 8:00 15.12.2023 F4-Manipal Hospital 2.5MW Yes
Hoody East Koramangala maintenance. & OLTC overhauling of except F4 due to
T-2. change over cable is
fauty.

66kV BUS: Gubbalala, Part of Uttarahalli, ISRO


1) Maintenance of Bus isolators & layout Ind. Area, Adarsha aprtments 04 MW load (out of
Note:LC proposal has
66kV Bus, I & II, Mantri Tranquill apartments, 16 MW) can be
220kV been sent in April-24
Jayanagar(S5,S18 2) 66kV PT Maintenance. Maruthi layout, Bharath layout, shifted on nearby
61 BMAZ South Subramanyapu BMAZ SOUTH South 66/11KV Subramanyapura 28.05.2024 28.05.2024 10:00 15:00 5:00 21.11.2023 12 if not approved in
subdivision) 3) 11kV Bus maintenance of Bank-1 Doddakallasandra Ind,area, Agara stations by
ra April-24 please
and Bank-2. and connected areas, Kuamraswamy BESCOM at the
consider in May-24
4) Battery charger and DCDB lyt, Vittal nagara, Yadalam nagar, time of Line clear.
maintenance. Maruthi nagar.

Laxmi Layout, Southcity


appartments, Kammanahalli,
66kV BUS: 5MW load can be Note:LC proposal has
Shanthinikethana, Doddamma
220kV Bank1 & Bank2 shifted on nearby been sent in April-24
Layout, Panduranganagara Layout,
62 BMAZ South Subramanyapu BMAZ SOUTH South HSR 66/11KV South City muss 28.05.2024 28.05.2024 10:00 15:00 5:00 -11kV Bus maintenance of Bank-1 and 23.01.2024 20 stations by if not approved in
BWSSB Kothanoor, Motappa
ra Bank-2. BESCOM at the April-24 please
compound, Mahendra homes, Good
time of line clear consider in May-24
homes, surrounding area of S12 &
S14 sub Division.
Banashankari
station,66/11kV
RRnagar will be
shifted on 220kV
During LC Period
To attend Hotspots and Maintenance Spura.Load of
Down streams of Vrushabhavathi 65MW load will be
works of all station equipments at BMRCL station will
BMAZ NORTH RR Nagar,Rajaji R/S: 66/11kV Chandra Layout affected after
East,West,S 220/66/11kV Vrushabhavathi RS and be shifted on BMRCL
63 BMAZ North NRS & BMAZ nagar,Kengeri,Jayana 220/66/11 KV Vrushabhavathi R/S 29.05.2024 29.05.2024 10:00 17:00 7:00 16.12.2023 MUSS, 6611kV Sir MV 65 rearranging of loads
outh downstream stations: 66/11kV Byappanahalli
SOUTH gar,Vidhanasoudha Layout,6611kV Kengeri MUSS, on other stations as
Chandra Layout MUSS, 6611kV Sir station
Mysore Road surrounding area. per concerned
MV Layout,6611kV Kengeri MUSS (Source:Hoody).Load
BESCOM officials.
of 66/11kV
Chandrappa circle
will be shifted on
Kumbalagodu
BMAZ NORTH RR Nagar,Rajaji Load changeover
East,West,S Areas feeding from 66/11kV Sir, M
64 BMAZ North NRS & BMAZ nagar,Kengeri,Jayana 66/11 KV Sir M V Layout station 29.05.2024 29.05.2024 10:00 17:00 7:00 Quarterly maintenance 16.12.2023 15 will be done by
outh V Layout S/s
SOUTH gar,Vidhanasoudha BESCOM

3MW load can be


Elita Promenade Appartments,K.R
220kV shifted on nearby LC was proposed on
11KV Bus, Tr-1 Bank, 11KV Bus layout ,Sharadanagar,
65 BMAZ South Subramanyapu BMAZ SOUTH South Jayanagar 66/11KV Elita Promonade muss 29.05.2024 29.05.2024 10:00 15:00 5:00 20.12.2024 3 stations by 20.03.2024 but
maintenance of Bank- chunchughatta and area surronding
ra BESCOM at the approval was not
sub-station.
time of line clear given.
Kaveri Nagar, Hulimavu, Akshaya
Nagar, Hongasandra, BTS layout,
7MW load can be
Virat Nagar, Kalena Agrahara, Vega
220kV 11KV Bus, Tr-1 and Tr-2, Banks, 11KV shifted on nearby
BMAZ HSR(S10, S12, S8 city, Arakere, BDA,
66 BMAZ South Subramanyapu BMAZ SOUTH 66/11KV BTM 29.05.2024 29.05.2024 10:00 15:00 5:00 Bus maintenance of Bank-1,Bank-1A 27.01.2024 20 stations by
South Sub division Nyanappanahalli, Satyasai BDA,
ra and Bank2 BESCOM at the
Kodichikkanahalli, Vijaya Bank
time of Line clear.
layour, Vishwapriya layout
surrounding Area
Duration of LC request
Date Time
Name of Wheather
Name of the Name of the Date on which
Name of the the Name of the Load Affected alteranate Power
Sl No KPTCL BESCOM Name of the station/Line Reason for availing LC last LC was Areas Affected Remarks
KPTCL Circle BESCOM BESCOM Division (MW) Supply Arranged
Division Zone From To From To Duration availed
Circle or not

Note:LC proposal has


Maintenanace of 220kV Bus, 220kV
220kV been sent in April-24
Somanahalli-Khodays-
67 BMAZ South Subramanyapu BMAZ SOUTH South HSR and Jayanagara 220/66/11KV Khodays glass factory station 30.05.2024 30.05.2024 10:00 15:00 5:00 24.01.2024 Nill No Load affected _ if not approved in
Subramanyapura Lines and 220kV
ra April-24 please
Transformers( 150MVA Tr-2)
consider in May-24
7th Main to 13th Main, Ist Stage
Thimmenahally, Part of MC Layout,
Binny Layout, Marenahally Layout,
Part of Vinayaka Layout, PC
During LC Period Most of the 15MW
Industrial Area, Kaveripura,
21MW load will be load will be changed
Ranganathapura, KCG Ind. Area,
affected after over to neighbouring
NRS Nanjappa Ind. Estate,
68 BMAZ North NRS BMAZ NORTH North 66/11 KV Vijayanagar 14.05.2024 14.05.2024 10:00 17:00 7:00 Quarterly maintenance 28.12.2023 21 rearranging of loads stations and only
Division,Rajajinagar. Sunnadagodu, Selvam Industrial
on other stations as 21MW load will be
Estate, Ballayana Kere, Syndicate
per concerned affected during LC
Bank Colony, Kaveripura 1st Block,
BESCOM officials. period.
2nd Block, 3rd Block, 5th Block, 6th
Block, 7th Block, 8th Block,
Nagarbhavi 11th block, KHB Colony,
HVR Layout, Syndicate Bank Colony
City Market, Avenue road, BVK
iyengar road, RT street, CT street,
Chikkapet, Nagarathpet, SP road,
Vidhana soudha
Town hall, JC road, Minerva Circle, During LC period,
Division (W5, W3, Quarterly maintenance work of 66kV 4MW load will be
BMAZ NORTH West, East KG road, Gandhi nagar, Masidi, 8MW of load will be
W4), RR nagar Line, Bus and 11kV Bus bar and to affected after
69 BMAZ North NRS & BMAZ and South 66/11 KV Victoria Station 16.05.2024 16.05.2024 10:00 17:00 7:00 17.12.2023 Mysore road police quarters, Gori 4 changed over to
Division (W2), attend hot spot in 66kV Transformer 2 changeover of loads
SOUTH Circle palya, Binny pet, New tharagu pet, other Stations by
Jayanagar Division isolator at 66/11kV Victoria Station. to other Stations
Chamarajpet, AM road, Kalasipalya, BESCOM
(S2)
Victoria Hospital, KIMS,
Shankarpuram, Dental college RMU,
SJ park RMU

During LC Period
BMAZ NORTH Quarterly Maintenance works of 1.3MW load will be
Global mall, Sobha Indraprastha
70 BMAZ North NRS & BMAZ North, West Vidhana Soudha 66/11 KV Shoba Indra prastha Station 18.05.2024 18.05.2024 10:00 17:00 7:00 station equipments at 66/11kV Sobha 20.12.2023 1.3 affected as per
Apartment
SOUTH Indraprastha Substation concerned
BESCOM officials.
(from 66kV NRS2
line) & 66/11kV
Shobha
Indraprastha & Alternate power
66/11kV Victoria supply to be
To attend R&D observations, tan delta Areas feeding from Down streams of will be fed from arranged by
Vidhana
71 BMAZ North NRS BMAZ NORTH North 220/66 KV 'A' Station 19.05.2024 19.05.2024 10:00 17:00 7:00 test hotspots & Quarterly Maintenance 10.12.2023 220/66kV A Station: 66/11kV 10 220kV NRS BESCOM by
Soudha,Jayanagar
work Kanteerava Station.For 11kV changing over of
feeders fed from 11kV loads to
66/11kV the other stations.
Kanteerava
alternate power
Nagar,H.V.K.Layout,Kirloskar supply to be
Colony,Karnataka Layout,Kamala
Nagar,V.J.S.S.Layout,Ward Office
surrounding,Gruhalakshmi Layout
Most of the 11kV
1st Stage,Nagapura,Mahalakshmi During LC
load will be changed
Quarterly maintenance work of 66kV Puram,Mhodi Hospital Road,Punjab period,10MW of
over to neighbouring
NRS Lines,Bus and 11kV Bus bar isolator National Bank,Hamsaleka Home load will be
72 BMAZ North NRS BMAZ NORTH North 66/11 KV Mahalakshmi Layout 22.05.2024 22.05.2024 10:00 17:00 7:00 21.12.2023 8 stations and only
Division,Rajajinagar. at 66/11kV Mahalakshmi Layout Surrounding,Shankarmata,Pipe Line changed over to
8MW load will be
station. road,J.C.Nagar,Kurabaralli,Rajaji other Stations by
affected during LC
Nagar 2nd BESCOM
period.
Block,E.S.I.Hoaspital.Kamala Nagar
Main road,Gruhalakshmi Layout
2nd Stage,Bovi Palya,Gelayara
Balaga,Mico Layout,G.D.Naidu
BMAZ NORTH RR Nagar,Rajaji Load changeover
East,West,S Areas feeding from 66/11kV Kengeri
73 BMAZ North NRS & BMAZ nagar,Kengeri,Jayana 66/11 KV Kengeri satellite Town station 24.05.2024 24.05.2024 10:00 17:00 7:00 Quarterly maintenance 29.11.2023 10 will be done by
outh Sateelite Town S/s
SOUTH gar,Vidhanasoudha BESCOM

Most of the 11kV


Sunkadakatte, Kamakshipalya, During LC
load will be changed
Malathahalli, Niligiri thopu, period,10MW of
Quarterly maintenance work of 66kV over to neighbouring
NRS Hegganahalli, load will be
74 BMAZ North NRS BMAZ NORTH North 66/11 KV Srigandhakaval MUSS 27.05.2024 27.05.2024 10:00 17:00 7:00 Lines,Bus and 11kV Bus bar isolator 10.12.2023 2 stations and only
Division,Rajajinagar. Annapoorneshwarinagara, changed over to
at 66/11kV Srigandhakaval station. 2MW load will be
Pattegarpalya, Kottigepalya, other Stations by
affected during LC
Kengunte. BESCOM
period.
Banashankari
station,66/11kV
RRnagar will be
shifted on 220kV
During LC Period
To attend Hotspots and Maintenance Spura.Load of
Down streams of Vrushabhavathi 65MW load will be
works of all station equipments at BMRCL station will
BMAZ NORTH RR Nagar,Rajaji R/S: 66/11kV Chandra Layout affected after
East,West,S 220/66/11kV Vrushabhavathi RS and be shifted on BMRCL
75 BMAZ North NRS & BMAZ nagar,Kengeri,Jayana 220/66/11 KV Vrushabhavathi R/S 29.05.2024 29.05.2024 10:00 17:00 7:00 16.12.2023 MUSS, 6611kV Sir MV 65 rearranging of loads
outh downstream stations: 66/11kV Byappanahalli
SOUTH gar,Vidhanasoudha Layout,6611kV Kengeri MUSS, on other stations as
Chandra Layout MUSS, 6611kV Sir station
Mysore Road surrounding area. per concerned
MV Layout,6611kV Kengeri MUSS (Source:Hoody).Load
BESCOM officials.
of 66/11kV
Chandrappa circle
will be shifted on
Kumbalagodu
BMAZ NORTH RR Nagar,Rajaji Load changeover
East,West,S Areas feeding from 66/11kV Sir, M
76 BMAZ North NRS & BMAZ nagar,Kengeri,Jayana 66/11 KV Sir M V Layout station 29.05.2024 29.05.2024 10:00 17:00 7:00 Quarterly maintenance 16.12.2023 15 will be done by
outh V Layout S/s
SOUTH gar,Vidhanasoudha BESCOM
Duration of LC request
Date Time
Name of Wheather
Name of the Name of the Date on which
Name of the the Name of the Load Affected alteranate Power
Sl No KPTCL BESCOM Name of the station/Line Reason for availing LC last LC was Areas Affected Remarks
KPTCL Circle BESCOM BESCOM Division (MW) Supply Arranged
Division Zone From To From To Duration availed
Circle or not

catered on Tr-2
through buscoupler
1. To carry out Maintenance work of and during this
E8,E9 sub incoming line, outgoing line, period no load will
10MW load to be
division Transformer Bays, 66kV bus Gos,11kV Purvankara apartment, gavigudi, be affected.
changed over by
,Additional Shivajinagar & bus and breaker maintenance. kalkere road, poorna pragnya, 2)During LC
BESCOM for
77 BMAZ North Hebbal BMAZ NORTH East Hoskote division 66/11KV Purvankara MUSS 13.05.2024 13.05.2024 10:00 15:00 5:00 2. For attending Hotspot works. 9.11.2023 maragondanahalli, halehalli, byrathi period of Tr-
carrying out 11kV
Division 3. For carrying out IR test of all village, byrathi bande,kanakashree 2(12.5MVA) from
& 66kV Bus
Shivajinagar equipements like CT's, PT's, LA's, layout, kyalasanahalli 11:30 to 13:00,
maintenance
division Transformers, 66kV & 11kV Breakers, load of Tr-2 will be
and 11kV Bus. catered on Tr-1
through buscoupler
and during this
RT nagar, ganga nagar,cholanagar, and Trasformer-2
1. To carry out Maintenance work of
outer ring and Transformer-3
2*20 MVA ,1*31.5 MVA Transformer,
road,kariyappalayout,ashram road, will be in charge
66kV bus Gos,11kV bus and breaker 13 MW will be
1st block anandnagar condition 2) The
maintenance. affected during LC
guddappareddy layout, hebbal, Transformer 2 lc
2. For attending Hotspot works. period of 20MVA
jayamahal 1st block, nandidurga shall be availed
C4,C5,C2 benson 3. For carrying out IR test of all Tr-1 & 2
78 BMAZ North Hebbal BMAZ NORTH North 220/66/11 KV Hebbal 14.05.2024 14.05.2024 11:00 16:00 5:00 26/09/2023 road, marappa garden, from 12:30 to 14:00
down equipements like CT's, PT's, LA's, 19MW will be
jcnagar,millers road ganga hrs and 13 mw load
Transformers, 66kV Breakers, 11kV affected during LC
nagar ,CHAMundhi shall be affected ,
Breakers, Wall entry bushings and period of 31.5MVA
nagar,dinnur,P&T colony ,EX service transfomer 1 and
11kV Bus. Tr-3
men colony ,Mla layout,Gananagar transformer 3 will
4. For conducting Tan-Delta on all
extension ,RBI colony,HMT be in charge
66kV CT's
layout ,Vasanthappa block etc will be changed
condition 3)
over to Tr-2
through
1. To carry out periodic maintenance
buscoupler, no load
work of incoming line, Transformer 1 & Yelahanka old Town, Yelahanka 11MW load will be
affected
2 Bays & 66kV bus maintenance and Newtown, Yelahanka Industrial affected for
3) During LC of Tr-
11kV feeders. Layout, Yelahanka 4th& 5th Phase, 2:30hrs from
C7 Yelahanka new 2, from 11:15 to
79 BMAZ North Hebbal BMAZ NORTH North 66/11KV KHB COLONY 15.05.2024 15.05.2024 10:00 15:00 5:00 2. For carrying out IR test of all 45272 chikka bommasandra, Anantha 12:30 to 15:00
town 12:30, load of Tr-2
equipements like CT's, PT's, pura, Puttenahalli, while carrying out
will be changed
Transformers, 66kV Breakers, 11kV Ramagondanahalli, Kempanahalli 66kV BUS
over to Tr-1
Breakers, etc maintainance
through
3. For attending Hotspot works.
buscoupler, no load
affected 4) During
Arabic college, K.G.Halli,
1. To carry out Maintenance work of 66kVbe catered
Bus LC on
from
Govindpura Village, Vinobhanagar,
Incoming line, Outgoing line, transformer-3 by
BM layout, Arogyamma layout,
Transformer Bays, 66kV bus Gos, using bus coupler-2
Kaveri garden and surrounding
11kV bus and breaker maintenance. and during this
areas HBR L/O, 4th Block, yasin
2. For attending Hotspot works. period no load will
Nagar, 5th Block, HBR Nagawara 1. 25MW load will
3. For carrying out IR test of all be effected.
East Division & main road, Nagawara, N.J.K be effected for
80 BMAZ North Hebbal BMAZ NORTH East 66/11KV HBR Layout MUSS 16.05.2024 16.05.2024 10:30 16:00 5:30 equipments like CT's, PT's, LA's, 28.11.2023 2. During LC period
Hebbal Division Garments, Byrankunte, 3hrs during bus &
Transformers, 66kV Breakers, 11kV of Transformer- 3
Kuppuswamy L/O, HKBK College PT maintainence
Breakers and 11kV Bus. (1:30 Hrs)
4th & 5th of HBRL/O,Vidya Sagar,
Transformer- 1 (20
Thanisandra, R.K.Hegde nagar,
MVA) will be in
K.Narayan pura, N.N.Halli, Balaji
4. For connecting 11kV Buscopler-1 charge condition
L/O, PHASE 1 TO 3, Railway mens
fish plate between Bank-1 & Bank-2. and the load of
L/O, BDS L/O, Central Excise, K. K. 1. 12MW load will stations.
be affected during 1. During Tr-2 and
Horamavu, Lingarajpuram, Hennur, Tr-1 LC 66kV ITI Line Bay
Hoysalanagar, NRI Layout, D J Halli, 2. 12MW load wll LC, about 6MW
Subbaiyanpalaya, HRBR Layout 1st be affected during load can be
Shivajinagar 1. For carrying out preventive Block, AFNHB, Baldwin School, Tr-2 and 66kV ITI changed over to Tr- Each Transformer LC
81 BMAZ North Hebbal BMAZ NORTH East (Additional East) 66/11KV Banaswadi S/s 18.05.2024 18.05.2024 10:30 16:00 5:30 maintenance of Line Bays and 13/12/2024 Kammanahalli Main road, OMBR Line Bay LC 1 through bus- will be availed obe
Division Transformer Bays. Layout, Babusabpalya, Dodda 3. 12MW load will coupler. after the other.
Gubbi, Canopy Apartments, ADMC, be affected during 2. During Tr-1 LC,
Pillareddy Nagar, Doctors Layout, TR-3 about 6MW load
Bilishivale, Banjara Layout 4. 30MW during can be changed
66kV Hebbal Line over to Tr-2
GateByrathi Cross, Byrathi Village, bay LC. through bus-
while carrying out stations, remining
Evergreen L/O Kanakashree
maintainance 7MW load will be
L/OGeddalahalli, Blessing garden,
1. To carry out periodic maintenance works on affected for 2 hours
Mantri Appt, heremath L/O, Trinity
work of incoming line, Transformer 1 & Transformer 1 and .
Fortune, Mycle SchoolBHK
2 Bays & 66kV bus maintenance and Transformer 2 as b) During LC peroid
Industries, janakiram L/O,
11kV feeders. the 10 MW load of Transformer 2,
Additional East vaddarapalya, Anugraha L/O,
82 BMAZ North Hebbal BMAZ NORTH East 66/11KV Hennur road 21.05.2024 21.05.2024 10:00 15:00 5:00 2. For carrying out IR test of all 22.11.2023 change over to be from 11:30 to
Shivajinagar division Cauvery L/OAtma Vidhya Nagar
equipements like CT's, PT's, done by BESCOM. 13:00, 5 MW load
Byrathi Village, KRC, Doddagubbi
Transformers, 66kV Breakers, 11kV 2.14MW load of change over shall
Cross, Kuvempu L/O, Sangam
Breakers, Hennur muss be done by
Encleve, Byrathi Bande, Nakshatra
3. For attending Hotspot works. muss will be BESCOM to
L/O, Thimme Gowda L/ONRI, Richs
affected for 1 neighboring
Garden, Andra Colony, manjunatha
Hours during 66kv effected.
stations, remining
Nagar, Hormavu BBMP GOSAgara

1. 8MW of load will


1. To carry out Maintenance work of Maruthi Sevanagar, Jai Bharath
be affected for 2
incoming line, outgoing line, nagar, Frazer Town , Cox Town,
Hrs while carrying
Transformer-1, Transformer-2 Bay, Benson town, Richards town, Davis 2. During LC
Additional out transformer- 2
66kV bus Gos, 11kV bus and breaker Road, Mosque Road, Biyappana period of
83 BMAZ North Hebbal BMAZ NORTH East E1,E2,E5 66/11KV Pottery Road MUSS 22.05.2024 22.05.2024 10:30 16:00 5:30 18.01.2024 maintenance
maintenance. Halli, Nagena Palya, Lingaraj Puram, Transformer-2 (2
Division 2. 25MW of load
Halsoor, Jeevana halli, R K Road, Hrs)- Peak load is
will be effected for
2. For reocrding the PI Coles Road Tanery Road, and ITC, 16 MW Transformer
3 Hrs during bus
value of Retrofilled TR-1 20MVA etc.. -1 (20 MVA) will be
& PT maintainence
in charge condition
and the load of
be catered on
transformer-2 will
transformer-2 by
using bus coupler.
A.K.Ashram Road, Devagowda Road, 1. 6MW of load will
1. To carry out Maintenance work of No load will be
R.T.Nagar 1st Block, Thimmaiah be affected for 2
incoming line, outgoing line, effected.
Garden, Modi Garden, Military Area, Hrs while carrying
East Transformer-1, Transformer-2 Bay, 2. During LC
Veerannapalya, Lumbini Garden, out transformer- 2
Division & 66kV bus Gos, 11kV bus and breaker period of
84 BMAZ North Hebbal BMAZ NORTH E1, E9, C5 66/11KV Yellarbande MUSS 23.05.2024 23.05.2024 10:30 16:00 5:30 14.12.2023 BWSSB Sewage plant, maintenance
Hebbal maintenance. Transformer-2 (2
Mariyannaplaya, Coffee board L/O, 2. 22MW of load
Division Hrs)- Peak load is
Kempapura,Dasarahalli, Maruthi will be effected for
2. For attending Hotspot 17 Transformer -1
L/O, Buvaneshwari nagar, Byrappa 3 Hrs during bus
works. (20 MVA) will be in
L/O and surrounding areas. & PT maintainence
charge condition
and the load of
transformer-2 will
Duration of LC request
Date Time
Name of Wheather
Name of the Name of the Date on which
Name of the the Name of the Load Affected alteranate Power
Sl No KPTCL BESCOM Name of the station/Line Reason for availing LC last LC was Areas Affected Remarks
KPTCL Circle BESCOM BESCOM Division (MW) Supply Arranged
Division Zone From To From To Duration availed
Circle or not

from 66kV A
1) 8MW Load
1. To carry out Maintenance work of station line and No
affected from
incoming line, outgoing line, Vidhana Soudha, Ganesh Temple load affected on
10:00 to 12.00hrs
Transformer Bays, 66kV bus Gos,11kV R.M.U,Miller Road.,Jaymahal, M.K Bank 1 , 1A& 1B.
Trf-2 LC
bus and breaker maintenance. Street., Cunningham Road,Kemp 2. Complete
Shivajinagar 2) 22MW Load
2. For attending Hotspot works. Road,Benson Town,Spencer Road, shutdown From
Division/ affected from
3. For carrying out IR test of all S.G.Road, R.M.Z. Millenia,B& LC 12.00 to 13.00,
85 BMAZ North Hebbal BMAZ NORTH BMAZ North Vidhanasoudha 66/11KV C station 25.05.2024 25.05.2024 10:00 16:00 6:00 10.02.2024 12:00 to 13:00
equipements like CT's, PT's, LA's, Hospital, Chikkabazar Road, Geneva 66kV Bus
Division/ Bus LC complete
Transformers, 66kV Breakers, 11kV House, Thimmaiah Road, Tasker mainteance will be
Indira nagar Shut down .
Breakers, Wall entry bushings and town, P.G Halli, Hains Road, carried, 15 MW of
3) 12MW Load
11kV Bus. Chandraia, Muneshwara nagar, load to be changed
affected from
4. For conducting Tan-Delta on all shivajinagar. over by BESCOM
13:00 to 16:00 .
66kV CT's and 22MW will be
Trf-1 LC
10,Serenita Block 13, Paradiso be in charge
affected for 1 Hr
Block 3, Block 17, Brigade condition load of
1. To carry out Maintenance work of
Northridge, Sampigehalli Police Tr-1, will be shifted
incoming line, outgoing line,
station. Chokkanahalli layout, on Tr-2 using Bus
Transformer Bays, 66kV bus Gos,11kV 21 MW load will be
Basavalingappanagara, Hegdenagar, Coupler.
bus and breaker maintenance. affected for 3hrs
balaji krupa Layout, central exuse 2)While carrying
Shivajinagar and 2. For carrying out IR test of all while carrying out
86 BMAZ North Hebbal BMAZ NORTH EAST 66/11KV Shobhacity 29.05.2024 29.05.2024 11:00 16:00 5:00 21.11.2023 layout, central revenue out Tr-2
Hebbal equipements like CT's, PT's, LA's, 11kV Bus & 66kV
layout,Shiridi Sai ram Layout,BDS maintenance ,Trans
Transformers, 66kV Breakers, 11kV Bus Maintenance
Layout,railway main layout, former1 will be in
Breakers, Wall entry bushings and work
Thirumenahalli, charge condition
11kV Bus.
Bharathicity,Nandanavana Layout, load of Tr-2 ,will be
Manipal, Police Quarters, shifted on Tr-1
Kempegowda layout, Nagenahalli, using Bus Coupler.
of Tr-1 from 10:00
to 11:30, load of Tr-
1. To carry out Maintenance work of
1 will be catered on
incoming line, outgoing line,
Tr-2 through
Transformer Bays, 66kV bus Gos,and
5MW load to be buscoupler and
breaker maintenance. Vidyaranyapura,Yelaankaoldandnew
changed over by during this period
2. For attending Hotspot works. town, KMF ,Marutinagar, M.S.Palya,
87 BMAZ North Hebbal BMAZ NORTH North HEBBAL, Jalaalli 66/11KV ATTUR MUSS 30.05.2024 30.05.2024 10:00 15:00 5:00 8.2.2024 BESCOM to to the no load will be
3. For carrying out IR test of all L&T, NCBS, RMZ, Purvankara
neighbouring affected.
equipements like CT's, PT's, LA's, Block-1,2,3,4,JudicialLayout,G KVK
station. 2)During LC period
Transformers, 66kV Breakers, 11kV
of Tr-2 from 11:30
Breakers,
to 13:00, load of Tr-
2 will be catered on
Tr-1 through
For erection of towers and replacement
of conductor in the existing line
Transmission Major Works Bengaluru Existing 66kV NRS DB Pura –Vijayapura SC
88 BRAZ Nelamangala 5/10/2024 5/10/2024 10:00 17:00 7:00 corridor in the work of line - Devanahalli, Vijayapura 19MW No
(Works)Circle Division, North Rural line
strenthening of Existing 66kV NRS DB
Pura –Vijayapura SC line
For erection of towers and replacement
of conductor in the existing line
Transmission Major Works Bengaluru Existing 66kV NRS DB Pura –Vijayapura SC
89 BRAZ Nelamangala 5/11/2024 5/11/2024 10:00 17:00 7:00 corridor in the work of line - Devanahalli, Vijayapura 19MW No
(Works)Circle Division, North Rural line
strenthening of Existing 66kV NRS DB
Pura –Vijayapura SC line
For erection of towers and replacement
of conductor in the existing line
Transmission Major Works Bengaluru Existing 66kV NRS DB Pura –Vijayapura SC
90 BRAZ Nelamangala 5/12/2024 5/12/2024 10:00 17:00 7:00 corridor in the work of line - Devanahalli, Vijayapura 19MW No
(Works)Circle Division, North Rural line
strenthening of Existing 66kV NRS DB
Pura –Vijayapura SC line
For erection of towers and replacement
of conductor in the existing line
Transmission Major Works Bengaluru Existing 66kV NRS DB Pura –Vijayapura SC
91 BRAZ Nelamangala 5/13/2024 5/13/2024 10:00 17:00 7:00 corridor in the work of line - Devanahalli, Vijayapura 19MW No
(Works)Circle Division, North Rural line
strenthening of Existing 66kV NRS DB
Pura –Vijayapura SC line
For erection of towers and replacement
of conductor in the existing line
Transmission Major Works Bengaluru Existing 66kV NRS DB Pura –Vijayapura SC
92 BRAZ Nelamangala 5/14/2024 5/14/2024 10:00 17:00 7:00 corridor in the work of line - Devanahalli, Vijayapura 19MW No
(Works)Circle Division, North Rural line
strenthening of Existing 66kV NRS DB
Pura –Vijayapura SC line
For erection of towers and replacement
of conductor in the existing line
Transmission Major Works Bengaluru Existing 66kV NRS DB Pura –Vijayapura SC
93 BRAZ Nelamangala 5/15/2024 5/15/2024 10:00 17:00 7:00 corridor in the work of line - Devanahalli, Vijayapura 19MW No
(Works)Circle Division, North Rural line
strenthening of Existing 66kV NRS DB
Pura –Vijayapura SC line
For erection of towers and replacement
of conductor in the existing line
Transmission Major Works Bengaluru Existing 66kV NRS DB Pura –Vijayapura SC
94 BRAZ Nelamangala 5/16/2024 5/16/2024 10:00 17:00 7:00 corridor in the work of line - Devanahalli, Vijayapura 19MW No
(Works)Circle Division, North Rural line
strenthening of Existing 66kV NRS DB
Pura –Vijayapura SC line
For erection of towers and replacement
of conductor in the existing line
Transmission Major Works Bengaluru Existing 66kV NRS DB Pura –Vijayapura SC
95 BRAZ Nelamangala 5/17/2024 5/17/2024 10:00 17:00 7:00 corridor in the work of line - Devanahalli, Vijayapura 19MW No
(Works)Circle Division, North Rural line
strenthening of Existing 66kV NRS DB
Pura –Vijayapura SC line
For erection of towers and replacement
of conductor in the existing line
Transmission Major Works Bengaluru Existing 66kV NRS DB Pura –Vijayapura SC
96 BRAZ Nelamangala 5/18/2024 5/18/2024 10:00 17:00 7:00 corridor in the work of line - Devanahalli, Vijayapura 19MW No
(Works)Circle Division, North Rural line
strenthening of Existing 66kV NRS DB
Pura –Vijayapura SC line
For erection of towers and replacement
of conductor in the existing line
Transmission Major Works Bengaluru Existing 66kV NRS DB Pura –Vijayapura SC
97 BRAZ Nelamangala 5/19/2024 5/19/2024 10:00 17:00 7:00 corridor in the work of line - Devanahalli, Vijayapura 19MW No
(Works)Circle Division, North Rural line
strenthening of Existing 66kV NRS DB
Pura –Vijayapura SC line
For erection of towers and replacement
of conductor in the existing line
Transmission Major Works Bengaluru Existing 66kV NRS DB Pura –Vijayapura SC
98 BRAZ Nelamangala 5/20/2024 5/20/2024 10:00 17:00 7:00 corridor in the work of line - Devanahalli, Vijayapura 19MW No
(Works)Circle Division, North Rural line
strenthening of Existing 66kV NRS DB
Pura –Vijayapura SC line
Duration of LC request
Date Time
Name of Wheather
Name of the Name of the Date on which
Name of the the Name of the Load Affected alteranate Power
Sl No KPTCL BESCOM Name of the station/Line Reason for availing LC last LC was Areas Affected Remarks
KPTCL Circle BESCOM BESCOM Division (MW) Supply Arranged
Division Zone From To From To Duration availed
Circle or not

Doddaballapura town, Rajgatta,


Tippuru, Raghunathapura,
For erection of towers in the existing
Talagwara, Gandrajapura,
Transmission Major Works Bengaluru Existing 66kV NRS DB Pura –Devanahalli DC line corridor in the work of line
99 BRAZ Nelamangala 5/21/2024 5/21/2024 10:00 17:00 7:00 - Konagatta, Muddanayakanapalya, 25MW No
(Works)Circle Division, North Rural line strenthening of Existing 66kV NRS DB
Hanabe, SS Ghati, Antharahalli,
Pura –Devanahalli DC line
Kantanakunte, Neralagatta,
Hadonahalli and surrounding areas

Doddaballapura town, Rajgatta,


Tippuru, Raghunathapura,
For erection of towers in the existing
Talagwara, Gandrajapura,
Transmission Major Works Bengaluru Existing 66kV NRS DB Pura –Devanahalli DC line corridor in the work of line
100 BRAZ Nelamangala 5/22/2024 5/22/2024 10:00 17:00 7:00 - Konagatta, Muddanayakanapalya, 25MW No
(Works)Circle Division, North Rural line strenthening of Existing 66kV NRS DB
Hanabe, SS Ghati, Antharahalli,
Pura –Devanahalli DC line
Kantanakunte, Neralagatta,
Hadonahalli and surrounding areas

Doddaballapura town, Rajgatta,


Tippuru, Raghunathapura,
For erection of towers in the existing
Talagwara, Gandrajapura,
Transmission Major Works Bengaluru Existing 66kV NRS DB Pura –Devanahalli DC line corridor in the work of line
101 BRAZ Nelamangala 5/23/2024 5/23/2024 10:00 17:00 7:00 - Konagatta, Muddanayakanapalya, 25MW No
(Works)Circle Division, North Rural line strenthening of Existing 66kV NRS DB
Hanabe, SS Ghati, Antharahalli,
Pura –Devanahalli DC line
Kantanakunte, Neralagatta,
Hadonahalli and surrounding areas

Doddaballapura town, Rajgatta,


Tippuru, Raghunathapura,
For erection of towers in the existing
Talagwara, Gandrajapura,
Transmission Major Works Bengaluru Existing 66kV NRS DB Pura –Devanahalli DC line corridor in the work of line
102 BRAZ Nelamangala 5/24/2024 5/24/2024 10:00 17:00 7:00 - Konagatta, Muddanayakanapalya, 25MW No
(Works)Circle Division, North Rural line strenthening of Existing 66kV NRS DB
Hanabe, SS Ghati, Antharahalli,
Pura –Devanahalli DC line
Kantanakunte, Neralagatta,
Hadonahalli and surrounding areas

Doddaballapura town, Rajgatta,


Tippuru, Raghunathapura,
For erection of towers in the existing
Talagwara, Gandrajapura,
Transmission Major Works Bengaluru Existing 66kV NRS DB Pura –Devanahalli DC line corridor in the work of line
103 BRAZ Nelamangala 5/25/2024 5/25/2024 10:00 17:00 7:00 - Konagatta, Muddanayakanapalya, 25MW No
(Works)Circle Division, North Rural line strenthening of Existing 66kV NRS DB
Hanabe, SS Ghati, Antharahalli,
Pura –Devanahalli DC line
Kantanakunte, Neralagatta,
Hadonahalli and surrounding areas

Doddaballapura town, Rajgatta,


Tippuru, Raghunathapura,
For erection of towers in the existing
Talagwara, Gandrajapura,
Transmission Major Works Bengaluru Existing 66kV NRS DB Pura –Devanahalli DC line corridor in the work of line
104 BRAZ Nelamangala 5/26/2024 5/26/2024 10:00 17:00 7:00 - Konagatta, Muddanayakanapalya, 25MW No
(Works)Circle Division, North Rural line strenthening of Existing 66kV NRS DB
Hanabe, SS Ghati, Antharahalli,
Pura –Devanahalli DC line
Kantanakunte, Neralagatta,
Hadonahalli and surrounding areas

Doddaballapura town, Rajgatta,


Tippuru, Raghunathapura,
For erection of towers in the existing
Talagwara, Gandrajapura,
Transmission Major Works Bengaluru Existing 66kV NRS DB Pura –Devanahalli DC line corridor in the work of line
105 BRAZ Nelamangala 5/27/2024 5/27/2024 10:00 17:00 7:00 - Konagatta, Muddanayakanapalya, 25MW No
(Works)Circle Division, North Rural line strenthening of Existing 66kV NRS DB
Hanabe, SS Ghati, Antharahalli,
Pura –Devanahalli DC line
Kantanakunte, Neralagatta,
Hadonahalli and surrounding areas

Doddaballapura town, Rajgatta,


Tippuru, Raghunathapura,
For erection of towers in the existing
Talagwara, Gandrajapura,
Transmission Major Works Bengaluru Existing 66kV NRS DB Pura –Devanahalli DC line corridor in the work of line
106 BRAZ Nelamangala 5/28/2024 5/28/2024 10:00 17:00 7:00 - Konagatta, Muddanayakanapalya, 25MW No
(Works)Circle Division, North Rural line strenthening of Existing 66kV NRS DB
Hanabe, SS Ghati, Antharahalli,
Pura –Devanahalli DC line
Kantanakunte, Neralagatta,
Hadonahalli and surrounding areas

Doddaballapura town, Rajgatta,


Tippuru, Raghunathapura,
For erection of towers in the existing
Talagwara, Gandrajapura,
Transmission Major Works Bengaluru Existing 66kV NRS DB Pura –Devanahalli DC line corridor in the work of line
107 BRAZ Nelamangala 5/29/2024 5/29/2024 10:00 17:00 7:00 - Konagatta, Muddanayakanapalya, 25MW No
(Works)Circle Division, North Rural line strenthening of Existing 66kV NRS DB
Hanabe, SS Ghati, Antharahalli,
Pura –Devanahalli DC line
Kantanakunte, Neralagatta,
Hadonahalli and surrounding areas

Doddaballapura town, Rajgatta,


Tippuru, Raghunathapura,
For erection of towers in the existing
Talagwara, Gandrajapura,
Transmission Major Works Bengaluru Existing 66kV NRS DB Pura –Devanahalli DC line corridor in the work of line
108 BRAZ Nelamangala 5/30/2024 5/30/2024 10:00 17:00 7:00 - Konagatta, Muddanayakanapalya, 25MW No
(Works)Circle Division, North Rural line strenthening of Existing 66kV NRS DB
Hanabe, SS Ghati, Antharahalli,
Pura –Devanahalli DC line
Kantanakunte, Neralagatta,
Hadonahalli and surrounding areas
Duration of LC request
Date Time
Name of Wheather
Name of the Name of the Date on which
Name of the the Name of the Load Affected alteranate Power
Sl No KPTCL BESCOM Name of the station/Line Reason for availing LC last LC was Areas Affected Remarks
KPTCL Circle BESCOM BESCOM Division (MW) Supply Arranged
Division Zone From To From To Duration availed
Circle or not

All areas feeding from following


station will be effected:
1)66/11kV Volvo
2)66/11kV Pillagumpa
3)66/11kV Sulibele
For quarterly maintenance work of
4)66/11kV Channarayaptna
Hosakote ,Nandagudi 220kV KIADB HP & Downstream stations 220kV R/s KIADB HP and its down
109 BRAZ BIAL BRAZ BRC Kengeri 5/21/2024 5/21/2024 10:00 16:00 6:00 26.11.2023 5)66/11kV Nandagudi 150 MW No
,Devanhalli stream 220kV Ekarajapura, &
EHT- Grindwell Nortan,Orient Bell
66/11kV stations .
ceramics,SHELL ,BPH minor
irigation,BOEING.
220kV Ekarajapura & 220kV
aerospace are downstream stations
for 220kV HP .
220kV BIAL BEGUR , 66kV
110 BRAZ BIAL BRAZ BRC Kengeri Hosakote Division 220kV BIAL and downstream stations 5/21/2024 5/21/2024 10:00 16:00 6:00 Quarterly maintenance 26.11.2023 Vidyangara, 66kV Budigere, BIAL- 80 MW No
1&2 EHT, ITC EHT

Konadasapura,
111 BRAZ BIAL BRAZ BRC Kengeri Hosakote Division 66/11kV Konadsapura 5/16/2024 5/16/2024 10:00 16:00 6:00 Quarterly maintenance 24.11.2023 27 MW No
Battrahalli,medahalli, Kanmangala

220kV R/S Malur, Railway traction-


1 &2, Kembodi, Tamaka, Yeldur,
Dalsanur, DRDO, T.D.Halli,
112 BRAZ Kolar BRAZ Kolar Kolar 220 kV R/S Kolar 5/19/2024 5/19/2024 9:00 17:00 8:00 First quarterly maintenance works 45148 Sugutur, S M Mangala, Vemgal, 422 MW No
Talgunda, Kyalanur, Narsapura,
Vokkaleri, Bangarpet, Kolar urban
and rural areas

Load will be
Doddabalalpau 220KV Nelamangala Line-2 Bay cattered on 220kV
113 BRAZ BRAZ BRC Kengeri Nelamangala 5/15/2024 5/15/2024 9:00 13:00 4:00 Tan Delta Testing of the 220kV CT's 24.02.2024 No load affected . NO Load affected
ra (220KV NRS Dbpura) Nelamangala -1
Line.

Load to be cattered
Doddabalalpau 220KV Nelamangala Line-1 Bay on 220kV
114 BRAZ BRAZ BRC Kengeri Nelamangala 5/15/2024 5/15/2024 13:00 17:00 4:00 Tan Delta Testing of the 220kV CT's 24.02.2024 No load affected . NO Load affected
ra (220KV NRS Dbpura) Nelamangala -2
Line.

Load to be cattered
on 220kV
Doddabalalpau 220KV BAIL BEGUR Quarterly maintenance works of 220kV Nelamangala -1 & 2
115 BRAZ BRAZ BRC Kengeri Hoskotte 5/21/2024 5/21/2024 11:00 16:00 5:00 26.11.2023 No load affected . NO Load affected
ra (220KV NRS Dbpura) bay at station Line and also
220kV KIADB R/S
line.
Vijaypura and
Doddabalalpau Quarterly maintenance works of the Jangamkotte ,Gundamgerre ,
116 BRAZ BRAZ BRC Kengeri Nelamangala 100MVA Power Transformer-3 NRS DBPura, 5/17/2024 5/17/2024 10:00 18:00 8:00 31.03.2024 62MW No
ra station. saslu .Doddabelavangala and EHT
AIR and
Vijaypura
Doddabalalpau Quarterly maintenance works of the Jangamkotte ,Gundamgerre ,
117 BRAZ BRAZ BRC Kengeri Nelamangala 66/11kV S/s Vijaypura & Jangamkotte 5/17/2024 5/17/2024 10:00 18:00 8:00 18.01.2024 62MW No
ra station. saslu .Doddabelavangala and EHT
AIR and
Vijaypura
Doddabalalpau Quarterly maintenance works of the Jangamkotte ,Gundamgerre ,
118 BRAZ BRAZ BRC Kengeri Nelamangala 66/11kV S/s Doddabelavangala 5/17/2024 5/17/2024 10:00 18:00 8:00 23.01.2024 62MW No
ra station. saslu .Doddabelavangala and EHT
AIR and
Vijaypura
Doddabalalpau Quarterly maintenance works of the Jangamkotte ,Gundamgerre ,
119 BRAZ BRAZ Nelamangala 66/11kV S/s Gundamgerre 5/17/2024 5/17/2024 10:00 18:00 8:00 23.01.2024 62MW
ra station. saslu .Doddabelavangala and EHT
AIR and
Vijaypura
Doddabalalpau Quarterly maintenance works of the Jangamkotte ,Gundamgerre ,
120 BRAZ BRAZ BRC Kengeri Nelamangala 66/11kV S/s Saslu 5/17/2024 5/17/2024 10:00 18:00 8:00 23.01.2024 62MW No
ra station. saslu .Doddabelavangala and EHT
AIR
Devanahalli,Kundana, Brigade
Doddabalalpau Quarterly maintenance works of the
121 BRAZ BRAZ BRC Kengeri Nelamangala 100MVA Power Transformer-1 NRS DBPura, 5/21/2024 5/21/2024 10:00 18:00 8:00 24.01.2024 Orchade ,D cross, Doddaballapura 76MW No
ra station.
Local areas,
Devanahalli,Kundana, Brigade
Doddabalalpau Quarterly maintenance works of the
122 BRAZ BRAZ BRC Kengeri Hoskotte 66/11kV S/s Devnahalli & Brigade Orchade 5/21/2024 5/21/2024 10:00 18:00 8:00 24.01.2024 Orchade ,D cross, Doddaballapura 76MW No
ra station.
Local areas,
Devanahalli,Kundana, Brigade
Doddabalalpau Quarterly maintenance works of the
123 BRAZ BRAZ BRC Kengeri Hoskotte 66/11kV S/s Kundanna 5/21/2024 5/21/2024 10:00 18:00 8:00 24.01.2024 Orchade ,D cross, Doddaballapura 76MW No
ra station.
Local areas,
Devanahalli,Kundana, Brigade
Doddabalalpau Quarterly maintenance works of the
124 BRAZ BRAZ BRC Kengeri Hoskotte 66/11kV S/s D.Cross 5/21/2024 5/21/2024 10:00 18:00 8:00 18.01.2024 Orchade ,D cross, Doddaballapura 76MW No
ra station.
Local areas,
Chikkaballapura Town,
Doddabalalpau Quarterly maintenance works of the Chikkabalapura Industrial Area,
125 BRAZ BRAZ BRC Kengeri Nelamangala 100MVA Power Transformer-2 NRS DBPura, 5/19/2024 5/19/2024 10:00 17:00 7:00 04.02.2024 73MW No
ra station. Nallimaradhaalli,Tubagere and AFTL
Solar IPP.
Chikkaballapura Town,
Doddabalalpau Quarterly maintenance works of the Chikkabalapura Industrial Area,
126 BRAZ BRAZ Kolar CBPura 66/11kV S/s CBPura IA 5/19/2024 5/19/2024 10:00 17:00 7:00 04.02.2024 73MW No
ra station. Nallimaradhaalli,Tubagere and AFTL
Solar IPP.
Chikkaballapura Town,
Doddabalalpau Quarterly maintenance works of the Chikkabalapura Industrial Area,
127 BRAZ BRAZ Kolar CBPura 66/11kV S/s CBPura U 5/19/2024 5/19/2024 10:00 17:00 7:00 04.02.2024 73MW No
ra station. Nallimaradhaalli,Tubagere and AFTL
Solar IPP.
Chikkaballapura Town,
Doddabalalpau Quarterly maintenance works of the Chikkabalapura Industrial Area,
128 BRAZ BRAZ Kolar CBPura 66/11kV S/s Nallimaradahalli 5/19/2024 5/19/2024 10:00 17:00 7:00 04.02.2024 73MW No
ra station. Nallimaradhaalli,Tubagere and AFTL
Solar IPP.
Chikkaballapura Town,
Doddabalalpau Quarterly maintenance works of the Chikkabalapura Industrial Area,
129 BRAZ BRAZ BRC Kengeri Nelamangala 66/11kV S/s Tubagere 5/19/2024 5/19/2024 10:00 17:00 7:00 04.02.2024 73MW No
ra station. Nallimaradhaalli,Tubagere and AFTL
Solar IPP.
Duration of LC request
Date Time
Name of Wheather
Name of the Name of the Date on which
Name of the the Name of the Load Affected alteranate Power
Sl No KPTCL BESCOM Name of the station/Line Reason for availing LC last LC was Areas Affected Remarks
KPTCL Circle BESCOM BESCOM Division (MW) Supply Arranged
Division Zone From To From To Duration availed
Circle or not

Raguttahalli, Bommepalli cross,


Yenigadale, Shidlagatta, Melur,
Jangamakote,
Nandhiganahalli,G.Kodihalli,
220KV PGCIL Kolar-Chintamani Line-1 To carry out
Srinivasapura 220KV Station and
& 220KV PGCIL Kolar-Chintamani quarterly
it's downstrem station, Iragampalli,
Line-2 No,due to Quarterly maintenance works
October 8th M.Gollahallli, Ganjigunte,
130 BRAZ Chintamani BRAZ Kolar Chintamani 220KV RS Chintamani 5/22/2024 5/22/2024 9:00 17:00 8:00 190 MW maintenance works at 220kV R/S
2023 Burudugunte, Pallicherlu, Sadali &
at all stations Chintamani and its
Dibburahalli Substations.
To carryout quarterly maintenance downstreams
& RTSS Chintamani
work stations
Solar IPPs:
1. ACME Solar IPP-20MW at
66/11kV Pallicherlu.
66/11kV S/s Mandikal , 9.
2. AFTL 5MW Solar IPP- 66/11kV
Alipura S/s 10.
Kudumulakunte(a1 steel EHT)
220Kv R/s Mittemari R/s and
Alternate power
connected stations 1.66/11kV S/s
supply will not be
Somanathapura, 2.66/11kV S/s 150-
arranged as the
peresandra,3.66/11kV S/s 160MW(GBDR)
131 BRAZ Gowribidanur BRAZ KOLAR Chikkaballapura 220/66/11kV R/s Gowribidanur 5/15/2024 5/15/2024 10:00 17:00 7:00 For quarterly maintenance work. 21.01.2024 maintenance of the
somenahalli, 4.66/11kV S/s sadali +140-150
above mentioned
5,julpalya,6.66/11kV S/s MW(Mittemari)
66kV Sub stations
chelur(Solar),7.66/11kV S/s
will be carried out.
chakavelu, 8.66/11kV S/s
pathapalya, 9.66/11kV S/s
thimmampalli,,10.66/11kV S/s
bagepalli,11.66/11kV S/s 66kV downstream
sub-stations T-
2nd Quarterly maintenance works of gollahalli,Anderson
220kV R/S T.Gollahalli along with
the station. R&D routine calibration pet,Nangli,H-
its connected 66kV downstream
and Hotline observations.To attend Gollahalli,Tayaluru,
sub-stations T-
220kV R/S T-Gollahalli along with its critical hotspots in 220kV Bus-1&2 Avni,NG
gollahalli,Andersonpet,Nangli,H-
132 BRAZ MALUR BRAZ KOLAR KGF connected 66kV downstream sub-stations and 5/18/2024 5/18/2024 9:00 17:00 8:00 selector isolators and also for re- 45211 160MW Hulkur,KGF 1
Gollahalli,Tayaluru, Avni,NG
220kV Bus-1&2 conditioining of 220kV Bus-1&2 &2 ,Doddakari,Kya
Hulkur,KGF 1
selector isolators of 220kV Bus coupler samballi,BEML
&2 ,Doddakari,Kyasamballi,BEML
Bay and to carry out 2nd Quarterly EHT,Kamasamudra
EHT,Kamasamudra substations
Maintenance. substations (Due to
2nd Quarterly
maintenance works
Alternate power
150 MW supply can be
2nd Quarterly Maintenance work of
(220/66kV Malur arranged for
Station, 100MVA PTR-2
R/S) downstream
OVERHAULING, Replacement of PTR-2 1. 220/66kV Malur R/S,66/11kV
220kV R/S Malur along with its connected 160 stations of
66kV Strung Bus & To attend critical Downstream Stations of
133 BRAZ MALUR BRAZ KOLAR KGF 66kV downstream sub-stations and 220kV 5/11/2024 5/11/2024 9:00 17:00 8:00 17.12.2023 MW(220/66kV 220/66kV
hotspots in 220kV Bus-1&2 selector 2. 220/66kV Sarjapura R/S &
Bus-1&2 Sarjapura, VTP, Sarjapura, Cessna,
isolators and also for re-conditioining 3. 220/66kV VTP, Cessna and Exora
Cessna and Exora Exora & VTP R/S
of 220kV Bus-1&2 selector isolators of R/S
R/S ) from Yerandahally
220kV Bus coupler Bay.
Total=300MW & HSR Layout
Stations

66/11 kV Iggalur substation and 66 kV T K No alternate power


134 Ramanagara TKHalli BRAZ Ramanagara Ramanagara 5/28/2024 5/28/2024 10:00 15:00 5:00 Station Quarterly maintenance work 19.12.2023 Iggaluru (surrounding villages) 15 MW
Halli- Iggalur line supply

66 kv iggaluru line
load arranged by
66/11 kV Akkurmole substation and 66 kV T
135 Ramanagara TKHalli BRAZ Ramanagara Ramanagara 5/15/2024 5/15/2024 10:00 15:00 5:00 Station Quarterly maintenance work 12.12.2023 Akkurmole (surrounding villages) 16 MW 220 kv Tubinakere
K Halli- Akkurmole line
receiving station
with restricted load.

Kodambahalli sub division of


Channapattana Taluk area feeding
66/11 kV Guruvinapura and 66/11 kV B V from 66/11 kV B V Halli/
No alternate power
136 Ramanagara TKHalli BRAZ Ramanagara Ramanagara Halli substations and 66 kV T K Halli- 5/17/2024 5/17/2024 10:00 15:00 5:00 Station Quarterly maintenance work 14.12.2023 Guruvinapura substation and 13 MW
supply
Harohalli-2 line at T K Halli Sathnur subdivision area of
Kanakapura Taluk feeding from
66/11 kV Guruvinapura.
Bevoor, Sankalagere and Dashavara No alternate power
137 Ramanagara TKHalli BRAZ Ramanagara Ramanagara 66/11 kV Bevoor, Sankalagere and Dashavara 5/14/2024 5/14/2024 10:00 15:00 5:00 Station Quarterly maintenance work 15.12.2023 16MW
(surrounding villages) supply
220/66/11 kV R/S Channapattana & 66/11 Channapatna & No alternate power
138 Ramanagara TKHalli BRAZ Ramanagara Ramanagara 5/21/2024 5/21/2024 10:00 15:00 5:00 Station Quarterly maintenance work 13.12.2023 20MW
kV vandaraguppe substation vandaraguppe(surrounding villages) supply

66kV Kanakapura-Chikkenahalli &


Quaterly maintenance work of Allimaranahalli, Chikkenahalli S/s
139 Ramanagara Kanakapura BRAZ Kanakapura Kanakapura Channapatna Line & 66/11kV Allimaranahalli 5/9/2024 5/9/2024 10:00 16:00 6:00 13.12.2023 18.4 NO
Transmission line & Substations & surounding Villages.
& Chikkenahalli S/s.
66/11kV Substations Harobele,
66kV Kanakapura-T.K Halli Line-1 & 66kV Kunur, Hukunda , Kodihalli,
Kanakapura-Kunur line, 66/11kV Harobele, Quaterly maintenance work of Bijjahalli, Hunasanahalli, M/s̤
140 Ramanagara Kanakapura BRAZ Kanakapura Kanakapura 5/14/2024 5/14/2024 10:00 16:00 6:00 15.12.2023 46 NO
Hukunda, Kodihalli, Kunur, Bijjahalli & Transmission line & Substations Hunasakodihalli IPP, M/s̤
Hunasanahalli S/s. Hunasakodihalli IPP & surounding
Villages.

66kV KIADB Harohalli -V.R doddi line, Line maintenance work & Quaterly
141 Ramanagara Kanakapura BRAZ Kanakapura Kanakapura 5/17/2024 5/17/2024 10:00 16:00 6:00 17.12.2023 V.R Doddi S/s sorounding villages. 9.3 NO
66/11kV V.R Doddi S/s, maintenance work of V.R Doddi S/s
Kanakapura Town & surounding
142 Ramanagara Kanakapura BRAZ Kanakapura Kanakapura 66/11kV Kanakapura S/s 5/19/2024 5/19/2024 10:00 16:00 6:00 Quaterly maintenance work 10.12.2023 24.6 NO
villages
Doddalahalli, M/s̤ GRT Jewellers IPP
66kV Kanakapura-T.Khalli Line-2 Quaterly maintenance work of
143 Ramanagara Kanakapura BRAZ Kanakapura Kanakapura 5/21/2024 5/21/2024 10:00 16:00 6:00 20.12.2023 & Shivanahalli Megha Dairy 11 NO
66/11kV Doddalahalli & Shivanahalli S/s Transmission line & Substations
&sorrounding villages
100MVA TR2 Quaterly maintenance
144 Ramanagara Kanakapura BRAZ Kanakapura Kanakapura 220kV KIADB Harohalli 5/28/2024 5/28/2024 10:00 16:00 6:00 22.12.2023 No load affeted - Yes
work
20MVA TR2 Quaterly maintenance
145 Ramanagara Kanakapura BRAZ Kanakapura Kanakapura 220kV KIADB Harohalli 5/28/2024 5/28/2024 10:00 16:00 6:00 27.12.2023 No load affeted - Yes
work
Duration of LC request
Date Time
Name of Wheather
Name of the Name of the Date on which
Name of the the Name of the Load Affected alteranate Power
Sl No KPTCL BESCOM Name of the station/Line Reason for availing LC last LC was Areas Affected Remarks
KPTCL Circle BESCOM BESCOM Division (MW) Supply Arranged
Division Zone From To From To Duration availed
Circle or not

BESCOM Kudur subdivision area


feeding from Hullenahalli substation
, Neralekere, Gangonahalli,
146 Ramanagara Nelamangala BRAZ Ramanagara Magadi 66/11KV Hullenahalli 5/22/2024 5/22/2024 10:00 15:00 5:00 LC availed for Quartely maintenance 26.11.2023 Tippasandra, Hullenahalli, 10 NO
Tavarekere, Sankigatta, Honnapura,
Virupapura, Sugganahalli, Hebalalu,
Beechanahalli and Chikkanahalli

BESCOM Kudur subdivision area


feeding from Kudur Substation,
Kudur, Hulllical, Tippasandra,
Narasandra, Byrapura, Adrangi,
147 Ramanagara Nelamangala BRAZ Ramanagara Magadi 66/11KV Kudur 5/22/2024 5/22/2024 10:00 15:00 5:00 LC availed for Quartely maintenance 26.11.2023 17 NO
Arsinakunte, Hoojenahally, kannur,
Biskur, kagimadu, srigiripura,
Maruru, Madigondanahalli and
Veerasagara

BESCOM kudur subdivision area


feeding from Srigiripura Substation,
Srigiripura, Veerasagar,
148 Ramanagara Nelamangala BRAZ Ramanagara Magadi 66/11KV Srigiripura 5/22/2024 5/22/2024 10:00 15:00 5:00 LC availed for Quartely maintenance 26.11.2023 Marasandra, bettahalli, Hosahalli, 6 NO
Acharipalya, Dollenahalli,
Chikkamaskal, Kempapura
mallapanahalli etc.,

Magadi Sub Division Area feeding


from Agalkote substation, Hulikatte,
Kalludevanahalli, Seegekuppe,
149 Ramanagara Nelamangala BRAZ Ramanagara Magadi 66/11KV Agalkote 5/15/2024 5/15/2024 10:00 15:00 5:00 Quarterly Maintenance 13.12.2023 8MW NO
Byranahally,koramangala,Chakrabh
avi, Agalkote, Dandigepura, Jodi
Hosahalli

Magadi Sub Division Area feeding


from Mathikere(Heligehalli)
150 Ramanagara Nelamangala BRAZ Ramanagara Magadi 66/11KV Mathikere(Heligehalli) 5/29/2024 5/29/2024 10:00 15:00 5:00 Quarterly Maintenance 20.12.2023 4MW NO
substation,Basapana Doddi,
Yeligehalli ,Gejjagaraguppe
hotspots.
2. 100MVA TR1 & 150 MVA TR2- 1st A. Areas feeding from Down streams
Quaterly and Annual preventive of 220/66/11kv R/s Dabaspet.
maintenance and attending critical 1.66/11 kv Nelamangala
hotspot observation. 2. 66/11 kv Thyamagondlu
3. 31.5MVA TR1 & TR2- 1 st Quaterly 3. 66/11 kv T Begur
and Annual preventive maintenance 4. 66/11 kv Hirehalli
151 Ramanagara Nelamangala BRAZ Bangalore Nelamangala 220/66/11 kv R/S Dabaspet 5/19/2024 5/19/2024 10:00 17:00 7:00 10.12.2023 190MW No
and attending critical hotspot 5. 66/11 kv Averahalli
observation. 5. 66/11 kv S K Steel(EHT)
4. 220kv and 66kv Line bays-1 st 6. 66/11 kv Jindal(EHT).
Quaterly and Annual preventive B. Dabaspet Sub Division Area
maintenance and attending critical feeding from
hotspot observation. 1.220/66/11kv R/s Dabaspet
5. 11kv GOS- 1 st Quaterly and
Erection of Intermediate tower between BESCOM Kudur subdivision area
loc:12-13 near Bagginagere village feeding from Hullenahalli
152 Ramanagara Nelamangala BRAZ Ramanagara Magadi 66kV Anchepalya-Hullenahalli-Kuduru line 5/22/2024 5/22/2024 9:00 17:00 8:00 26.11.2023 30MW No
limits to increase the vertical clearance substation, Kuduru substation and
at Hazardous location Srigiripura substation.

BESCOM Kudur subdivision area


feeding from Gudemaranahalli
Substation, Solur, Lakkenahalli,
Gudemaranahalli, Mariguppe,
153 Ramanagara Nelamangala BRAZ Ramanagara Magadi 66/11KV Gudemaranahalli 5/26/2024 5/26/2024 10:00 15:00 5:00 LC availed for Quartely maintenance 26.11.2023 17 NO
Chilling centre, Banavadi,
Chennuvalli, hakkinalu,
bittasandra, yenegere and
Kormangla.

11kV feeders Evacuating from


66/11kV T Begur Substation coming
154 Ramanagara Nelamangala BRAZ Bangalore Nelamangala 66/11kv Substation T Begur 5/19/2024 5/19/2024 10:00 17:00 7:00 LC availed for Quartely maintenance 10.12.2023 22MW No
under Nelamangala and Dabaspet
Subdivisions, BESCOM

11kV feeders Evacuating from


For carrying out preventive quarterly 66/11kV Nelamangala Substation
155 Ramanagara Nelamangala BRAZ Bangalore Nelamangala 66/11kv Substation Nelamangala 5/19/2024 5/19/2024 10:00 17:00 7:00 10.12.2023 39 No
maintenance coming under Nelamangala
Subdivisions, BESCOM

11kV feeders Evacuating from


66/11kV Thyamagondlu Substation
156 Ramanagara Nelamangala BRAZ Bangalore Dabaspet 66/11kV Thyamagondlu 5/19/2024 5/19/2024 10:00 17:00 7:00 LC availed for Quartely maintenance 10.12.2023
coming under Nelamangala and
Dabaspet Subdivisions, BESCOM

11kV feeders Evacuating from


66/11kV Averahalli Substation
157 Ramanagara Nelamangala BRAZ Bangalore Dabaspet 66/11kV Averahalli 5/19/2024 5/19/2024 10:00 17:00 7:00 LC availed for Quartely maintenance 10.12.2023
coming under Nelamangala and
Dabaspet Subdivisions, BESCOM

11kV feeders Evacuating from


158 Ramanagara Nelamangala BRAZ Bangalore Nelamangala 66/11kV S/s Alur 5/18/2024 5/18/2024 10:00 17:00 7:00 LC availed for Quartely maintenance 09.12.2023 66/11kV Alur substation,
Nelamangala BESCOM subdivision

Dodderi, CK Tandya, Byalalu,


Chikkanahalli, Lakkayyanapalya,
159 Ramanagara Nelamangala BRAZ Ramanagara Magadi 66/11kV Chandrappa circle 5/12/2024 5/12/2024 10:00 15:00 5:00 1st Quarterly Maintenance 10.12.2023 Kurubarahalli, Gollahalli, 22MW No
Chunchanakuppe, Uddandanahalli
and Sulivara
Duration of LC request
Date Time
Name of Wheather
Name of the Name of the Date on which
Name of the the Name of the Load Affected alteranate Power
Sl No KPTCL BESCOM Name of the station/Line Reason for availing LC last LC was Areas Affected Remarks
KPTCL Circle BESCOM BESCOM Division (MW) Supply Arranged
Division Zone From To From To Duration availed
Circle or not

BYYANDAHALLI GIDDENAHALLI,
varma layout Seegehalli gate Forest
gate , GURAPPANAPALYA
hulluramma temple vinayaka narar
kadabagere ramohalli kere
Ramanagar
vinayaka l/o, Ibrahim L\O
a&
160 Ramanagara Nelamangala BRAZ Magadi & Kengeri 66/11kV Kodigehalli 5/19/2024 5/19/2024 10:00 15:00 5:00 1st Quarterly Maintenance 10.12.2023 Ragavendra l/o ESWARA FARM 20MW No
Bangalore
kamadenu VADDARAHALLI Agro
South
test commodities,
chikkagollarahatti, Machohalli,
Kachohalli, Gangondanahalli
UDDANDAYYA LAYOUT Dasappa
Layout Bylakonahalli,
Bychaguppe Devamachohalli
Basawanpalya village Metipalya
magadi road Varthur ( HT ) Gankallu
, kurubarahalli
Jaladasipalya Deva manchanahalli
Muddayyana Palya Gulganji halli
Ramanagar MAGADI AND
161 Ramanagara Nelamangala BRAZ 66/11kV Tavarekere 5/26/2024 5/26/2024 10:00 15:00 5:00 1st Quarterly Maintenance 26.11.2023 Thippagondanahalli yarappa 16MW No
a NELAMANGALA
industrial area Gangappanahalli
Kempgondanahalli Guruvebavi
palya Dodda gollarahatti
nangenahalli Manjunath nagar
YALACHAGUPPE Basavana
Palya,Gangenahalli channenahalli
hotspots. A. Areas feeding from Down streams
2. 100MVA TR1 & 100 MVA TR2- 1st of 220/66/11kv R/s Magadi.
Quaterly and Annual preventive 1.66/11 kv Magadi
maintenance and attending critical 2. 66/11 kv Hosapalya Circle
hotspot observation. 3. 66/11 kv VG Doddi
3. 12.5MVA TR1 st Quaterly and 4. 66/11 kv TG Halli
Ramanagar
162 Ramanagara Nelamangala BRAZ Magadi 220/66/11 kv R/S Magadi 5/19/2024 5/19/2024 10:00 17:00 7:00 Annual preventive maintenance and 26.11.2023 5. 66/11 kv Tavarekere 80MW No
a
attending critical hotspot observation. 5. 66/11 kv GM Halli
4. 220kv and 66kv Line bays-1 st B. Magadi Sub Division Area
Quaterly and Annual preventive feeding from
maintenance and attending critical 1.220/66/11kv R/s Magadi Like
hotspot observation. Sathanur,Mathikere,Managal,Kempa
5. 11kv GOS- 1 st Quaterly and sagara
Magadi Subdivision Areas like
Magadi Town, Kalya
Gate,Thaggikuppe,
Ramanagar Madbal,Belagumba,Kalya
163 Ramanagara Nelamangala BRAZ Magadi 66/11 KV S/S Magadi 5/19/2024 5/19/2024 10:00 17:00 7:00 1st Quarterly Maintenance works 26.11.2023 18MW No
a Nethenahhallu, Jodagatte,
Savanadurga, Chandurayanahalli,
Kenchanahalli, Mayanayakanahalli,
Managal

Gangapanahalli,banchenahatti,
varadenahalli,
Ramanagar
164 Ramanagara Nelamangala BRAZ Magadi 66/11KV T G Halli 5/26/2024 5/26/2024 10:00 15:00 5:00 1st Quarterly Maintenance works 26.11.2023 motaganahalli,BWSSB, kuvanahalli, 5MW no
a
jogerahalli, yellapanapalya,
peddanapalya, kemogondnahalli,

DOdderi, Dodderi colony,


mayasandra, chikkeluru, BBMP
Ramanagar venkatapura, gopalanagara,
165 Ramanagara Nelamangala BRAZ Magadi 66/11KV DODDERI 5/12/2024 5/12/2024 10:00 15:00 5:00 1st Quarterly Maintenance 10.12.2023 4MW no
a gurubhavipalya, sheshgurupalya,
subrayanapalya, vaishnavi layout,
kundalpura, c.k thandya, koluru

1. Quarterly mainteance works on all


power Transformer Dommasandra,
Yerrandanahall
166 Ramanagara BRAZ Ramanagara Chandapura 220/66/11kV R/s Sarjapura 5/11/2024 5/11/2024 9:00 15:00 6:00 2. Attending hotline observations 16.12.2023 attibele,surrounding areas of 45 MW NO
i
3. To conduct Tan delta tests on Sarjapura
100MVA power Transformers
Yerrandanahall to carryout 1st quarterly maintenance Jigani link road and surrounding
167 Ramanagara BRAZ Ramanagara Chandapura 66/11kV S/s Jigani Link Road 5/19/2024 5/19/2024 10:00 15:00 5:00 26.11.2023 18 MW NO
i works areas
Yerrandanahall Bommasandra Industrial Area and
168 Ramanagara BRAZ Ramanagara Chandapura 66/11 kV S/s Bommasandra I/A 5/26/2024 5/26/2024 10:00 15:00 5:00 1st quarterly maintainance 21.01.2024 24 MW NO
i surrounding area
Chokkasandra station sarrounding
Yerrandanahall planned to carry Quarterly
169 Ramanagara BRAZ Ramanagara Chandapura 66/11kV S/s Chokkasandra(Huskur) 5/19/2024 5/19/2024 10:00 16:00 6:00 16.12.2023 area(Avalahalli, Gopasandra, 10 MW NO
i maintenance work
Gattahalli)
Yerrandanahall
170 Ramanagara BRAZ Ramanagara Chandapura 66/11kV S/s Suryanagara 5/19/2024 5/19/2024 10:00 15:00 5:00 Maintenance work 17.12.2023 Suryanagar surrounding areas 9.3 MW NO
i
Partial load can be
Yerrandanahall shifted on Attibele,
171 Ramanagara BRAZ Ramanagara Chandapura 66/11kV S/s Chandapura 5/18/2024 5/18/2024 10:00 15:00 5:00 Maintenance work 17.12.2023 Chandapura Surrounding areas 23 MW
i Y'halli,
Chokkasandra
Yerrandanahall Dommasandra and sarajapura
172 Ramanagara BRAZ Ramanagara Chandapura 66/11kV S/s Dommasandra 5/11/2024 5/11/2024 10:00 15:00 4:00 Quarter mentainance 21.01.2024 24 MW NO
i surrounding area

1.For carrying out Quarterly


maintenance work and to attend hot Bommasandra Industrial Area ,
line observations. Veerasandra, Yarndanahalli &
Yerrandanahall
173 Ramanagara BRAZ Ramanagara Chandapura 220/66/11kV Receiving-station Yarandanahalli 5/19/2024 5/19/2024 10:00 15:00 5:00 2. For 23.12.2023 Ananthnagara and 11kV Feeders of 30 MW NO
i
replacing of 66kV CT's of 31.5 MVA Tr- Bank-2, 2A, 3 & 3A from
3. 3. For OLTC 220/66/11kV RS Yarandanahalli
Overhauling of 31.5MVA Transformer-
2

66kV Attibele Line, 66kV Samandur


For station maintenance works, and
Yerrandanahall line, Areas feeding from Anekal S/S
174 Ramanagara BRAZ Ramanagara Chandapura 66/11kV S/s Anekal 5/18/2024 5/18/2024 10:00 15:00 5:00 other scheduled works at 66/11kV S/s 06.08.2023 25 MW NO
i such as Anekal Town and its
Anekal
surrounding rural areas
Duration of LC request
Date Time
Name of Wheather
Name of the Name of the Date on which
Name of the the Name of the Load Affected alteranate Power
Sl No KPTCL BESCOM Name of the station/Line Reason for availing LC last LC was Areas Affected Remarks
KPTCL Circle BESCOM BESCOM Division (MW) Supply Arranged
Division Zone From To From To Duration availed
Circle or not

66kV Bagganadoddi line, Areas


For station maintenance works and
feeding from Kumbaranahalli S/S
Yerrandanahall other scheduled works at 66/11kV S/s
175 Ramanagara BRAZ Ramanagara Chandapura 66/11 kV S/s Kumbaranahalli 5/12/2024 5/12/2024 10:00 15:00 5:00 17.12.2023 such as Haragadde, 15 MW NO
i Kumbaranahalli
Kumbaranahalli, Jigani and its
surrounding areas.

For station maintenance works, and Areas feeding from Bagganadoddi


Yerrandanahall other scheduled works at at 66/11kV S/S such as Indlawadi,
176 Ramanagara BRAZ Ramanagara Chandapura 66/11 kV S/s Bagganadoddi 5/12/2024 5/12/2024 10:00 15:00 5:00 17.12.2023 3 MW NO
i S/S Bagganadoddi Bagganadoddi, Kadujakkanahalli
and its surrounding areas

Yerrandanahall for carrying out Quarterly maintenance Attibele industrial area, Attibele and
177 Ramanagara BRAZ Ramanagara Chandapura 66/11 kV S/s Attibele 5/19/2024 5/19/2024 10:00 15:00 5:00 17.12.2023 37 MW NO
i in 66/11 kV Attibele station surrounding areas

Yerrandanahall for carrying out Quarterly maintenance samanduru, Gandhinagar, Halehalli


178 Ramanagara BRAZ Ramanagara Chandapura 66/11 kV S/s Samanduru 5/18/2024 5/18/2024 10:00 15:00 5:00 10.12.2023 5 MW NO
i in 66/11 kV Samanduru station and other surrounding areas

For station maintenance works, and 66kV Kumbaranahalli &


Yerrandanahall
179 Ramanagara BRAZ Ramanagara Chandapura 220/66/11kV R/s Jigani 5/12/2024 5/12/2024 10:00 18:00 8:00 other scheduled works at 17.12.2023 Bagganadoddi S/s, Areas feeding 35 MW NO
i
220/66/11kV R/s Jigani from Jigani 220Kv R/S
Yerrandanahall Jigani, madapatna, haragadde,
180 Ramanagara BRAZ Ramanagara Chandapura 66/11 kV S/s Jigani old 5/19/2024 5/19/2024 10:00 16:00 6:00 For qurterly manitenace work 26.11.2023 23 MW NO
i Nisarga layout.
AKKURU, CHIKKAGANGAWADI,
DODDAGANGAWADI, TALAWADI,
66kV Kothipura-Melehalli-Chikkangagawadi- 66kV Solar IPP AND SORROUDING
Kootgallu Outgoing line at Melehalli sub 14.12.2023(Ch AREAS feeding from
station. ikkagangawadi Chikkangangwadi Sub station
Affected Station are:- To carry out 1ST quarterly ) 2) Jalamangala, Akkuru,
181 Ramanagara Somanahalli BRAZ Ramangara Ramanagara 1. Chikkagangawadi 5/11/2024 5/11/2024 10:00 16:00 6:00 maintenance works of substation and 12.12.2023(Jal Tadikavagilu, Kysapurua, Solar IPP 15MW No
2.Jalamangala Lines from TLI staff amangala) feeding form Jalamangala Sub
3.Kootgallu 08.12.2023(Ko station.
4.Melehalli otagallu) 3) Yerehalli, Kootgallu,
Danayankanapura,
Shyanaboganahalli and
Kunamoodanahalli feeding from
Ramanagara Town, Hunsenahalli
66kV Kothipura-Ramanagara line. To carry out 1ST quarterly
Village, Bilagumba Village,
182 Ramanagara Somanahalli BRAZ Ramangara Ramanagara Affected Stations are: 5/12/2024 5/12/2024 10:00 16:00 6:00 maintenance works of substation and 09.12.2023 19MW No
Janapadaloka, Basavanapura,
1. Ramanagara Lines from TLI staff
K.P.Doddi, Vaderahalli Villages

1) Namdaari, Myganahalli, ABM


Build tech, Heggadagere and
66kV Kempanahalli-Uragahalli Line
16.12.2023 sourrounding areas feeding from
Affected Stations are To carry out 4th quarterly
(Kempanahalli) Kempanahalli sub station
183 Ramanagara Somanahalli BRAZ Ramangara Ramanagara 1. Uragahalli sub station 5/19/2024 5/19/2024 10:00 16:00 6:00 maintenance works of substation and 12.5MW No
20.12.2023
2. Kempanahalli sub station. Lines from TLI staff
(Uragahalli) 2) H.M.doddi, Annahalli, M.G.palya
and sourrounding areas feeding
from Uragahalli Sub station.

To carry out 1st quarterly maintenance BANNIKUPPE, ANKANHALLI,


184 Ramanagara Somanahalli BRAZ Ramangara Ramanagara 66/11kV SHIVANAHALLI 5/15/2024 5/15/2024 10:00 16:00 6:00 works of substation and Lines from TLI 13.12.2023 DODDANAHALLI, KADANAKUPPE 9MW NO
staff AND SOURROUNDING AREAS

WONDERALLA, HEJJALLA,
BANNIKUPPE, GOMTHI,
To carry out 1st quarterly
KADUMANE,
185 Ramanagara Somanahalli BRAZ Ramangara Ramanagara 66/11kV Hejjala 5/26/2024 5/26/2024 10:00 16:00 6:00 maintenance works of substation and 10.12.2023 12MW No
MANCHANAYAKANAHALLI,
Lines from TLI staff
HOSSADODDI, AVAREGERE, KHB
HAMPAPURA
2*31.5MVA, 20MVA, 100MVA TR-
1&2, 66Kv BOSCH, 66KV TTIPL,
66KV COCOCOLA.
Areas Affected are
1.Hittamadu, byramangala,
Hposuru, Bananduru, Medanahalli,
To carry out 1st quarterly maintenance
Bidadi Town, Shanamangala,
186 Ramanagara Somanahalli BRAZ Ramangara Ramanagara 220/66/11kV Bidadi 5/19/2024 5/19/2024 10:00 16:00 6:00 works of substation and Lines from TLI 17.12.2023 50MW No
Kodiyala.
staff
Industriral feeders affected are
Ingersollrand, MEI, KIADB, MTPL,
Lumax, Hightemp, Nextgen, KIADB-
3, Coco Cola green, Toyoto Techno
park, Eagleton,TKAP, Manjushree,
To carry out 1st quarterly maintenance Renewsour(IPP),
187 Ramanagara Somanahalli BRAZ Ramangara Ramanagara 220/66/11kV Bidadi 5/21/2024 5/21/2024 10:00 18:00 8:00 - PGCIL1 & 2 220kV Lines 0MW YES
works of Railway Bay

Newly
Commissioned
To carry out 1st quarterly maintenance
188 Ramanagara Somanahalli BRAZ Ramangara Ramanagara 220/66/11kV Bidadi 5/17/2024 5/17/2024 10:00 15:00 5:00 lIne.Commissi 220kV Bidadi-Kothipura Line-1 0MW YES
works of specific bays
oned on
29.11.2023

Newly
Commissioned
To carry out 4th quarterly
189 Ramanagara Somanahalli BRAZ Ramangara Ramanagara 220/66/11kV Bidadi 5/18/2024 5/18/2024 10:00 15:00 5:00 lIne.Commissi 220kV Bidadi-Kothipura Line-2 0MW YES
maintenance works of specific bays
oned on
29.11.2023

Partial Load can be


To carry out 1st quarterly maintenance 12.5MVA Tr-1 and Its associated
190 Ramanagara Somanahalli BRAZ Ramangara Ramanagara 220/66/11KV KOTHIPURA 5/26/2024 5/26/2024 10:00 15:00 5:00 10.12.2023 4MW arranged from
works of specific bays Bay equipments
Ramanagara MUSS

To carry out 1st quarterly maintenance 100TR-1 and 100MVA Tr-2, 220kV
191 Ramanagara Somanahalli BRAZ Ramangara Ramanagara 220/66/11KV KOTHIPURA 5/22/2024 5/22/2024 10:00 15:00 5:00 14.12.2023 0MW YES
works of specific bays Bidadi Line-1, Thubnkinere Line-2

220kV Bidadi Line-2, Thubinkere


To carry out 1st quarterly maintenance
192 Ramanagara Somanahalli BRAZ Ramangara Ramanagara 220/66/11KV KOTHIPURA 5/23/2024 5/23/2024 10:00 15:00 5:00 15.9.2023 Line-1 and 220kV associated BUS 0MW YES
works of specific bays
Equipments
Duration of LC request
Date Time
Name of Wheather
Name of the Name of the Date on which
Name of the the Name of the Load Affected alteranate Power
Sl No KPTCL BESCOM Name of the station/Line Reason for availing LC last LC was Areas Affected Remarks
KPTCL Circle BESCOM BESCOM Division (MW) Supply Arranged
Division Zone From To From To Duration availed
Circle or not

400kV Devanahalli Hardware Park Project:


220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
193 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/8/2024 5/8/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line
400kV Devanahalli Hardware Park Project:
220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
194 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/9/2024 5/9/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line
400kV Devanahalli Hardware Park Project:
220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
195 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/10/2024 5/10/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line
400kV Devanahalli Hardware Park Project:
220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
196 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/11/2024 5/11/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line
400kV Devanahalli Hardware Park Project:
220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
197 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/12/2024 5/12/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line
400kV Devanahalli Hardware Park Project:
220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
198 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/13/2024 5/13/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line
400kV Devanahalli Hardware Park Project:
220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
199 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/14/2024 5/14/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line
400kV Devanahalli Hardware Park Project:
220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
200 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/15/2024 5/15/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line
400kV Devanahalli Hardware Park Project:
220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
201 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/16/2024 5/16/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line
400kV Devanahalli Hardware Park Project:
220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
202 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/17/2024 5/17/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line
400kV Devanahalli Hardware Park Project:
220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
203 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/18/2024 5/18/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line
400kV Devanahalli Hardware Park Project:
220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
204 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/19/2024 5/19/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line
400kV Devanahalli Hardware Park Project:
220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
205 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/20/2024 5/20/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line
Duration of LC request
Date Time
Name of Wheather
Name of the Name of the Date on which
Name of the the Name of the Load Affected alteranate Power
Sl No KPTCL BESCOM Name of the station/Line Reason for availing LC last LC was Areas Affected Remarks
KPTCL Circle BESCOM BESCOM Division (MW) Supply Arranged
Division Zone From To From To Duration availed
Circle or not

400kV Devanahalli Hardware Park Project:


220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
206 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/21/2024 5/21/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line
400kV Devanahalli Hardware Park Project:
220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
207 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/22/2024 5/22/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line
400kV Devanahalli Hardware Park Project:
220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
208 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/23/2024 5/23/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line
400kV Devanahalli Hardware Park Project:
220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
209 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/24/2024 5/24/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line
400kV Devanahalli Hardware Park Project:
220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
210 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/25/2024 5/25/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line
400kV Devanahalli Hardware Park Project:
220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
211 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/26/2024 5/26/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line
400kV Devanahalli Hardware Park Project:
220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
212 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/27/2024 5/27/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line
400kV Devanahalli Hardware Park Project:
220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
213 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/28/2024 5/28/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line
400kV Devanahalli Hardware Park Project:
220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
214 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/29/2024 5/29/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line
400kV Devanahalli Hardware Park Project:
220kV BIAL will have
220kV MC transmission line with AAAC Moose
2 sources. 1 from
conductor from C point at proposed 400/220
Transmission SEE, BRAZ 400kV Devanahlli via
215 400kV SSCD BRAZ Hoskote kV S/s at Devanahalli Hardware park to 5/30/2024 5/30/2024 10:00 17:00 7:00 For tower erection and stringing work - No load is affected No load is affected NA
(Works)Circle O&M Circle KIADB station and
220/66kv Doddaballapura NRS S/s (2 Circuits)
another from DB
(25.10km)
Pura
220kV Hoody-Bial line