Professional Documents
Culture Documents
CSSP REV. 03 - Part1
CSSP REV. 03 - Part1
CSSP REV. 03 - Part1
WORKING AT HEIGHTS
03 01-April-2020 Issue for (Fall Protection Program Updated)
Review See Section 8 Page 110-117
Ezaganie Malcampo
Size : A4
Company : MASTOURA CONTRACTING COMPANY LTD.
Rev : 03
MASTOURA CONTRACTING COMPANY LTD.
Post Box No. 24
Rahima – 31941
KINGDOM OF SAUDI ARABIA
Section –1
(CSSP)
Size : A4
Company : MASTOURA CONTRACTING COMPANY LTD.
Rev : 03
MASTOURA CONTRACTING COMPANY LTD.
Post Box No. 24
Rahima – 31941
KINGDOM OF SAUDI ARABIA
1.1 PURPOSE
The purpose of this document is to describe the Health, Safety & Environmental Management
System to be implemented on site and therefore, to outline the main measures to be taken by
CONTRACTOR in order to prevent human injuries, property and environmental damage
during Construction up to project completion of the units and facilities under the scope of the
General Maintenance Services for Project.
This document is issued in compliance with the Schedule “D” and all related and applicable
COMPANY requirements included in it & Standards and National Law.
CONTRACTOR Site Safety Program as a full reference of their respective HSE Plan, that
should be reviewed by Loss Prevention Department and approved by the SAPO before any job
commence on the site.
This document neither abrogates nor modifies the contractual agreements between the
COMPANY and CONTRACTOR but provides the mechanism for carrying out the normal
working relationship between the parties during the Project execution
1.2 SCOPE
General Maintenance Services, The nature of the work comprises of the miscellaneous civil
works such as excavation, backfilling, compaction, paving, installation of temporary
containment walls, road signs, guardrails, fencing, concrete WORK dewatering, Structural and
Non-structural Surface Preparation and Coating, Structural and Non-structural Fabricated
Repair and/or Replacement, Pipeline Repair, Pipe Removal, Dewatering, Electrical,
Instrumentation and Mechanical Repair and/or Replacement, pipe and spool hydro-testing, and
other miscellaneous maintenance services, All requirements described herein are fully
compliance to every activity performed by CONTRACTORs.
Size : A4
Company : MASTOURA CONTRACTING COMPANY LTD.
Rev : 03
MASTOURA CONTRACTING COMPANY LTD.
Post Box No. 24
Rahima – 31941
KINGDOM OF SAUDI ARABIA
1.3. DEFINITIONS
1.3.1 General Definitions
PROPERTY DAMAGE: All those incidents with damage to or destruction of either public
property caused by CONTRACTOR or private property of the project, caused either by a
person who is not its owner or by natural phenomena
Size : A4
Company : MASTOURA CONTRACTING COMPANY LTD.
Rev : 03
MASTOURA CONTRACTING COMPANY LTD.
Post Box No. 24
Rahima – 31941
KINGDOM OF SAUDI ARABIA
Size : A4
Company : MASTOURA CONTRACTING COMPANY LTD.
Rev : 03
MASTOURA CONTRACTING COMPANY LTD.
Post Box No. 24
Rahima – 31941
KINGDOM OF SAUDI ARABIA
Size : A4
Company : MASTOURA CONTRACTING COMPANY LTD.
Rev : 03
MASTOURA CONTRACTING COMPANY LTD.
Post Box No. 24
Rahima – 31941
KINGDOM OF SAUDI ARABIA
Size : A4
Company : MASTOURA CONTRACTING COMPANY LTD.
Rev : 03
MASTOURA CONTRACTING COMPANY LTD.
Post Box No. 24
Rahima – 31941
KINGDOM OF SAUDI ARABIA
Size : A4
Company : MASTOURA CONTRACTING COMPANY LTD.
Rev : 03
MASTOURA CONTRACTING COMPANY LTD.
Post Box No. 24
Rahima – 31941
KINGDOM OF SAUDI ARABIA
Size : A4
Company : MASTOURA CONTRACTING COMPANY LTD.
Rev : 03
MASTOURA CONTRACTING COMPANY LTD.
Post Box No. 24
Rahima – 31941
KINGDOM OF SAUDI ARABIA
HSE Supervisor
(TBA)
Size : A4
Company : MASTOURA CONTRACTING COMPANY LTD.
Rev : 03
MASTOURA CONTRACTING COMPANY LTD.
Post Box No. 24
Rahima – 31941
KINGDOM OF SAUDI ARABIA
(Attachment 01)
Size : A4
Company : MASTOURA CONTRACTING COMPANY LTD.
Rev : 03
MASTOURA CONTRACTING COMPANY LTD.
Post Box No. 24
Rahima – 31941
KINGDOM OF SAUDI ARABIA
Size : A4
Company : MASTOURA CONTRACTING COMPANY LTD.
Rev : 03
Cris Arendain Torrejos
Mastoura for Trading And Contracting Company
Email: catorrejos@mastoura.com.sa
Mobile no.0580743758
Summary of Qualification
Job Description:
Job Description:
___________________________________________________________________________________
PROJECT HIGHLIGHTS
A. EPC Projects
Project : Gas system(bullet tanks) & Gas piping Installation
Clients : Commercial accounts
Jollibee - Philippines
Kentucky Fried Chicken – Philippines
And other leading local food chains & hotels
Industrial account
Republic Biscuit Corporation – Philippines
WL Foods Corporation - Philippines
Royal DAICHI Foods-Philippines
Liwayway Marketing Corporation-Philippine
EDUCATIONAL ATTAINMENT
PERSONAL DATA
Age : 46
Date of Birth : September 21, 1974
Birth Place : Zamboanga City
Nationality : Filipino
Sex : Male
CURRICULUM VITAE
R.DANIELSELVAM
Email: daniel.selvam@mastoura.com.sa
CAREER OBJECTIVE
Page 1 of 4
2.Previous Employment
Organization: Velath Engineering International FZC (EPC) - Kuwait.
Designation: Senior Project Engineer (Field Storage API 650 Tanks Fabrication,
Erection and Allied Piping).
Project Title: API 650 - 6Nos Storage Tanks Installation, Testing & Painting
Period : July 2017 to October 2018.
3. Previous Employment
(EPC- Company)
5.Previous Employment
Page 2 of 4
6.Previous Employment
Organization: AL HUSAM GEN.CONTRACTING EST. - Abu Dhabi, U.A.E
(EPC- Company)
Designation : Mechanical Site Supervisor.(Desalination Plants Construction
,Fire Fighting systems like- Deluge,
Sprinkler, Water Spray, Hydrant,
Pump House, Fire Tanks, Piping -
AG&UG, Heavy Structural,
Equipment,Storage steel Tanks )
Period : January 1999 – July 2009
7.Previous Employment
8.Previous Employment
9.Previous Employment
Page 3 of 4
SOFTWARE SKILLS
PERSONAL PROFILE
Gender : Male
Nationality : Indian
DECLARATION
I hereby declare that the statement furnished above regarding my education and
Experience is full of truth and best of my Knowledge
Place:
Date:
Page 4 of 4