Medium Voltage HYBRID

CHE-3I(A)...
Uo/U(Um) 6/10(12) kV – 19/33(36) kV

Working instruction

Hybrid three-core indoor termination


for all three-core polymeric cables
up to 36 kV

202021/1105/2/7

CELLPACK GmbH CELLPACK AG


Electrical Products Electrical Products
D-79761 Waldshut-Tiengen CH-5612 Villmergen
Tel. +49(0)7741/60 07 11 Tel. +41(0)56/618 12 34
Fax +49(0)7741/60 07 83 Fax +41(0)56/618 12 45
www.cellpack.com
e-mail: electrical.products@cellpack.com

CHE-3I(A) 202021/1105/2/7 1/7


General remarks
• Check the range and size of the cable and the cable accessories.
• Check the content of the kit as per packing list.
• Read the working instructions.

Installation must only be executed by competent personnel.


The manufacturer accepts no liability for breakdowns resulting from incorrect installation.

Shrinking rules
• Use a suitable heat source like gas burner or hot-air blower.
• Set gas burner to a soft (yellow) flame.
• Clean cable sheaths and conductor insulation with a suitable cleaning agent.
• On shrinking, observe even heating, avoid over-heating.

Indoor termination type CHE-3I(A)…

Voltage Cable opening A Cable opening B Number of


(kV) (mm) (mm) sheds/phase

6/10(12) – 6,35/11(12) 170 max. 350 -


8,7/15(17,5) 170 max. 350 1
12/20(24) – 12,7/22(24) 170 max. 350 1
18/30(36) – 19/33(36) 350 max. 350 2

1a) 1b)
Cable without armouring Cable with armouring

• Cut back the cable sheath according to • Cut back the cable sheath by 30 mm
C = B + A + X as shown in the for armoured cables.
drawing. • Clean the cable sheath.
X = L + 5 mm for copper conductors • Apply sealant mastic DM1 onto the
X = L + 10 mm for aluminium Cable sheath according to the drawing.
conductors
• Clean the cable sheath.
• Apply sealant mastic DM1 onto the cable
sheath according to the drawing.
CHE-3I(A) 202021/1105/2/7 2/7
2a) 2b)
Without armouring With armouring

a) Cable with wire screen: a) Armoured cables with wire screen:


Fold back the screen wires and fix Fold back the screen wires and fix
them with PVC tape 70 mm under them with PVC tape 70 mm under
the end of the cable sheath. the end of the cable sheath.
Note: Fix two wires per phase at the Fix the screen wires by means of
end of the conductors with the pressure spring RF onto the
PVC tape. armouring of the cable.
Note: Fix two wires per phase at the
ends of the conductors with
PVC tape.

b) Cable with tape screen: b) Armoured cables with tape screen:


Fix the flat copper braid of the earthing Fix the flat copper braid onto the
kit EGA by means of a armouring by means of the pressure
pressure spring close to the end spring RF.
of the cable sheath. Arrange the flat copper braid and fix
Arrange the flat copper braid and it with PVC tape 70 mm under the
fix it with PVC tape 70 mm under end of the cable sheath.
the end of the cable sheath.

Cover the screen wires or the earthing Cover the screen wires or the earthing
braids with a second layer of mastic braids with a second layer of mastic
DM1. DM1.

CHE-3I(A) 202021/1105/2/7 3/7


3) 4)

a) For cable with wire screen: • Slip on the heat-shrink tubes SR2
Fix two screen wires with PVC tape (length 350 mm; if B was chosen
As per length B. < 350 mm, shorten the tubes
b) For cable with tape screen: accordingly) as far as possible into
Fix the copper tape screen with the crutch area of the cable and
tinned wire as per length B and shrink them carefully.
cut back the upper part of the screen.
Leave 60 mm of the endings of the
binding wire BD.
• Remove carefully the outer conductive
layer (A+X-30 mm). Make sure that the
cut-back edges have a clean cut.

5) 6)

• Push the heat-shrink spreader-cap • Bend the left-over of the screen wire
SEH over the conductor ends as far as (or the endings of the binding wire BD)
possible into the crutch area and over the heat-shrink tube and fix it
shrink it carefully. 50 mm underneath the tube ending
with a pressure spring.

CHE-3I(A) 202021/1105/2/7 4/7


7)
8)

• Remove the insulation for dimension X, • In case of an easy strippable


X = L+ 5 mm for copper conductors. conductive layer, apply lubricant
X = L+ 10 mm for aluminium and filler GM1 at the ends of the
conductors. conductive layers according to the
• Protect the ends of the conductors with drawing.
PVC tape.

10)
9)

• Moisten the inside of the stress- • Position the stress-control element


control element FSE with GM1. by lightly turning.
• Insert the applicator AH into the • Wrap the sealant mastic DM1 between
stress-control element and slip on the pressure spring and cover 10 mm
up to the end of the heat-shrink of the stress-control element as shown
tube SR2. in the drawing.
• Remove the applicator, pull out
the individual tongues.

CHE-3I(A) 202021/1105/2/7 5/7


11) 12)
12)

• Remove the PVC tape from the ends • Push the heat-shrink tube (red) over
of the conductors. the cores down to the pressure
• Mount the cable lugs according to the spring and shrink it carefully from the
manufacturer`s specification, then bottom. Do not cover the pressure
remove all sharp edges and clean. spring.
• Wrap sealant mastic DM1 (grey) onto
the cable lug and cover 10 mm of the
Insulation.

13) 14)

• Slip on the silicon sheds by using the with a distance of 60 mm to each other.
applicator and position them. • Installed termination.
The position of the first shed is at the
upper end of the stress-control
element.
• Additional sheds have to be positioned

CHE-3I(A) 202021/1105/2/7 6/7


Minimum distances

When mounted in cubicles and other


electrical devices, local specifications
have to be considered.

Voltage a b c
Distance distance between
Phase/earth sheds
(kV) (mm) (mm)

6/10(12) – 6,35/11(12) according to 15 10


8,7/15(17,5) local 20 15
12/20(24) – 12,7/22(24) specifications 25 20
18/30(36) – 19/33(36) 35 25

CHE-3I(A) 202021/1105/2/7 7/7