Shrinking rules
• Use a suitable heat source like gas burner or hot-air blower.
• Set gas burner to a soft (yellow) flame.
• Clean cable sheaths and conductor insulation with a suitable cleaning agent.
• On shrinking, observe even heating, avoid over-heating.
1a) 1b)
Cable without armouring Cable with armouring
• Cut back the cable sheath according to • Cut back the cable sheath by 30 mm
C = B + A + X as shown in the for armoured cables.
drawing. • Clean the cable sheath.
X = L + 5 mm for copper conductors • Apply sealant mastic DM1 onto the
X = L + 10 mm for aluminium Cable sheath according to the drawing.
conductors
• Clean the cable sheath.
• Apply sealant mastic DM1 onto the cable
sheath according to the drawing.
CHE-3I(A) 202021/1105/2/7 2/7
2a) 2b)
Without armouring With armouring
Cover the screen wires or the earthing Cover the screen wires or the earthing
braids with a second layer of mastic braids with a second layer of mastic
DM1. DM1.
a) For cable with wire screen: • Slip on the heat-shrink tubes SR2
Fix two screen wires with PVC tape (length 350 mm; if B was chosen
As per length B. < 350 mm, shorten the tubes
b) For cable with tape screen: accordingly) as far as possible into
Fix the copper tape screen with the crutch area of the cable and
tinned wire as per length B and shrink them carefully.
cut back the upper part of the screen.
Leave 60 mm of the endings of the
binding wire BD.
• Remove carefully the outer conductive
layer (A+X-30 mm). Make sure that the
cut-back edges have a clean cut.
5) 6)
• Push the heat-shrink spreader-cap • Bend the left-over of the screen wire
SEH over the conductor ends as far as (or the endings of the binding wire BD)
possible into the crutch area and over the heat-shrink tube and fix it
shrink it carefully. 50 mm underneath the tube ending
with a pressure spring.
10)
9)
• Remove the PVC tape from the ends • Push the heat-shrink tube (red) over
of the conductors. the cores down to the pressure
• Mount the cable lugs according to the spring and shrink it carefully from the
manufacturer`s specification, then bottom. Do not cover the pressure
remove all sharp edges and clean. spring.
• Wrap sealant mastic DM1 (grey) onto
the cable lug and cover 10 mm of the
Insulation.
13) 14)
• Slip on the silicon sheds by using the with a distance of 60 mm to each other.
applicator and position them. • Installed termination.
The position of the first shed is at the
upper end of the stress-control
element.
• Additional sheds have to be positioned
Voltage a b c
Distance distance between
Phase/earth sheds
(kV) (mm) (mm)