DOCUMENT NO: HSE-JSA-FPG-001

TITLE: Job Safety Analysis (JSA) REV: 00 DATE PRODUCED: Mar 20, 2024

Job Title: Tank Cleaning Work Using 7,000 PSI High Pressure Water Jetting to the Alcohol Bottom Surge Tank (S-709)

Area: FPG Process Plant (Alcohol Area) Equipment Name / No: Alcohol Bottom Surge Tank (S-709)

OBZA: Siti, Azizi, Khaidir


JHA Committee:
FPG: Firman Hadi, Amirul (SHO), Zelaha Ibrahim
Helmet, Safety Glass, Coverall (or Jacket), Safety Shoes, Suitable Glove, Ear Plug, Welder Mask, Full Body Harness, clear face shield, chemical suit,
PPE Required:
chemical glove, respirator, rain boot. Others for CSE: Life line, LEL/O2 meter, SCBA
JHA Ref. No / PTW No: Issue Date: May 2024 Revision: 00

JOB STEPS HAZARD IDENTIFIED EXISTING CONTROL MEASURES ADDITIONAL CONTROL MEASURES

 Obtain PTW approval prior to work


 Handling in capacity
 Job must be monitored by
 Keep surrounding area tidy. supervisor without failed
 Back pain, disc slip and injury due to wrong  Sign in and obtain permit before entry  Job supervisor give toolbox talk
handling into restricted area. Permitting to be prior commencement of the task.
 Slips, trips and falls due to unsuitable area done by trained Work Leader/Supervisor
 Working area barricaded
 Injury due to handling while unloading or  Use good manual handling. complete with proper/suitable
Unload the equipment, tools, machinery and loading of equipment and tool from the  Working in group signage
material by manual handling. lorry/pick up  Unload at suitable area and ground  PPE: Basic PPE, Covid 19 PPE (if
 Damage to other equipment/insulation due  Use proper posture with correct required) + additional PPE -
to crash with lifting load ergonomics methods during handling minimum cotton glove, but when
 Pinch point / caught between object load is heavy and have poor grip,
 No person shall manually lift item more
use minimum semi-leather glove.
than 22.5kg alone
 Electrical tools to be inspected
 Precuation on possibility being caught
by E&I Team
hazard
 Reach item at edges / end point

 Slips, trips and falls due to unsuitable area  Preparation at suitable location  Job supervisor give toolbox talk
Unload the equipment, tools, machinery and  Only competent manpower handling the prior commencement of the task.
 Wrong slinging and rigging technique work
material by lifting using boom truck  Working area barricaded and
 Boom truck and load damage due to boom  Boom truck set-up at solid area & ground proper signage erected at
Page | 1
DOCUMENT NO: HSE-JSA-FPG-001

TITLE: Job Safety Analysis (JSA) REV: 00 DATE PRODUCED: Mar 20, 2024

truck topple and overload  Boom truck to be inspected before use - working area.
 Injury to workers due to trapped at pinch use FPG equipment checklist, by FPG  PPE: Basic PPE, Covid 19 PPE +
point SPOC additional PPE - minimum cotton
 Manpower at correct position glove, but when load is heavy
 Damage to other equipment due to crash
 Good communication - operator and and have poor grip, use
with boom or lifting load
signalman minimum semi-leather glove,
 Use tag line to control load from swing wear mask (whenever required).
 Barricade and signage area - keep on
continuous safety watch to ensure no
unauthorized person is walking near
lifting and under lifting site
 Boom truck to have spark arrestor
installed at exhaust
 Standby person/fire-watch to monitor
the job
 No manpower seating under hanging
loads (ZeTo Rules)
 Job must be monitored by
Set up warning signs before commencement of  Ensure that access is denied or restricted supervisor without failed
 Entry into area by unauthorized personnel.
work by barricade and proper signage

 Use semi lather glove and suitable PPE  Job supervisor give toolbox talk
 Use right tools for the right job. prior commencement of the task.
 Hand or finger injury
 All work done by trained workers (ES,  Working area barricaded and
 Falling object
AESP) proper signage erected at
Preparation and initial work  Pinching/sharp object working area.
 Tie all hand tools using tools lanyard
 Blinding  Slip, trip and fall  Ensure permit to work is
 Cover sharp edges with cotton to avoid
 Open manhole  Toxic/flammable gas completely filled and authorized
pinching/injuries.
 Deficient of oxygen before start job - Permit: General
 Ventilation Work
 Watch the step and be extra precaution
 Chemical exposure  FPG to ensure complete empty-
of surrounding for any obstructions /
out as much as possible.
 Opening wrong point/equipment hazards.
Communicate clearly to OBZA
 Working at height  Use suitable breathing apparatus. Safety PIC if the is at high level and not
 Splash with product / pressure trap rep to assess condition. When chemical able to maximize the empty-out.
vapour is detected , depending on the
 Compliance to CSE procedure
exposure volume, wear at minimum R95
Page | 2
DOCUMENT NO: HSE-JSA-FPG-001

TITLE: Job Safety Analysis (JSA) REV: 00 DATE PRODUCED: Mar 20, 2024

or P95 mask (low exposure) for high flow


exposure, wear half face respirator with  Implement the LOTO system and
organic vapour cartridge to ensue to comply with the
 Break the line slowly. Monitor the LOTO system
release. If there is dripping of chemical  To notify & reconfirm with FPG
from break point that might travel down PIC prior to work
to lower level people, contain the
 PTW: CSE Ventilation Plan &
release accordingly. Always stand out of
Rescue Plan
line of fire when breaking any line
 Explosion Proof Equipment
 Include briefing on hazrd/SDS of original
material inside the system in your
toolbox. Seek assistance from your FPG
SPOC
 Use proper ventilation fan
 Adequate ventilation duration
 Proper Lighting
 Shut down all power supply and blinding
off piping connected to the vessel
 All work activities are carried out by
competent person
 Supervisor conduct inspection, monitor
the work activities and to ensure safety
standards and procedures are strictly
adhered to.
 Walk through and tagging of point
before start work
 Wear body harness with double lanyard
and hook properly
 To apply PTW CSE & to provide CSE
rescue plan
 To get approval for rescue plan &
ventilation plan prior start the work
Setup Pump and other accessories  Poor condition of hoses cause injury  Experienced personnel to inspect all  Job must be monitored by
Page | 3
DOCUMENT NO: HSE-JSA-FPG-001

TITLE: Job Safety Analysis (JSA) REV: 00 DATE PRODUCED: Mar 20, 2024

 Diesel spill out hoses and couplings supervisor without failed


 Safety whip checks to be installed on all
couplings and hose joint
 Equipment c/w drip pan
 Equipment shall be distanced from any
public/monsoon drain minimum 1.5 m
 Prepare spill kit /sandbag
 Routine/shiftly check to ensure no spill
 Safe work practice.  Job must be monitored by
 Stop engine before fill up equipment supervisor without failed
with diesel.
 Put drip pan under equipment to contain
 Environmental damage spillages. Prepare spill kit /sandbag
Filling up Diesel To the diesel driven equipment.  Diesel spill ignited by nearby hot surface.  Pump must be located away at min 1.5m
from public drain
 Diesel vapour exposure
 Standby fire extinguisher
 Wear R95or P95 mask
 Use proper pump for filling activity
 Conducted at well ventilated area

 Wear all required PPE (Basic PPE +  Job supervisor give toolbox talk
additional – risk as assessed by AGT & prior commencement of the
ES) – All Entrance must wear harness task.
 Asphyxiation/deficient of oxygen (w/o lanyard)  To Display PTW, JHA , and
 Chemical burning Confine Space work permit at
 In case of strong odor during initial
 Fire & explosion entry/pre-cleaning, wear R95/P95 mask work location at all time.
Confined Space Entry
 Toxic / flammable gas at minimum, or if insufficient, wear half  Working area barricaded
face mask with organic vapour cartridge complete with proper/suitable
 Limited visibility
 Ensure CSE permit is approved and fully signage
 Heat stroke / hot environment
authorized before entry  All machine and equipment
 Gas check before enter confined space inspected by competent person
area. Oxygen level must between 19.5% -  Cleared rescue plan

Page | 4
DOCUMENT NO: HSE-JSA-FPG-001

TITLE: Job Safety Analysis (JSA) REV: 00 DATE PRODUCED: Mar 20, 2024

23.5%  Explosion Proof equipment


 Periodic gas check every two hours  Provide sufficient lighting
during operation  Rotate AE regularly. Drink
 Only Competent person to entry enough plain water during
confined space - must bring valid AESP resting time.
card
 Standby person on standby during
confined space entry
 Proper lighting and ventilation
 Continuous ventilation activity
 Wear all required PPE (Basic PPE +  Job supervisor give toolbox talk
additional – risk as assessed by your prior commencement of the task.
Safety Officer) – All Entrance must wear  To Display PTW, JHA , and
harness (w/o lanyard) Confine Space work permit at
 In case of strong odor during initial work location at all time.
entry/pre-cleaning, wear R95/P95 mask  Working area barricaded
 Hose entanglement and strain at minimum, or if insufficient, wear half complete with proper/suitable
face mask with organic vapour cartridge signage
 Uncontrolled gun operation. Striking
operator.  Wear protective clothing (waterproof  All machine and equipment
Storage Tank cleaning work tyvex) , face shield inspected by competent person.
 Confined space entry
 High Pressure Water jetting  Wear proper fit leather glove  Permit: General, CSE, Hot work –
 Noise or vibration
 Manual cleaning  Ensure hoses are free from must be filled completely by
 Fall/slippery
entanglements and laid out the way to trained WL
 Back pain eliminate trip hazards.  Wear safety / rain boot
 Fatigue  Hose inspected by work leader/safety  Get enough rest. Job rotation
rep- do not use hose with visible wear
 Ergonomic posture/buddy
and tear, or incompatible spec
 Minimize manual work/use
 Ensure correct operations of gun as per
pump whenever possible
standard HPWJ procedure.
 Only competent and experienced
personal to operate the gun (bring valid
competency card)
 Handler of HPWJ need to wear double
Page | 5
DOCUMENT NO: HSE-JSA-FPG-001

TITLE: Job Safety Analysis (JSA) REV: 00 DATE PRODUCED: Mar 20, 2024

PHP (ear plug and ear muff)- for standby


person , if exposure exceed 100dBA,
wear double PHP as well
 Job supervisor give toolbox talk
prior commencement of the task.
 Leakage and causing flooding onto the  Draining process run concurrently with
surrounding cleaning work  Working area barricaded
complete with proper/suitable
 Spillage  Use canvas or pan to cover the floor signage
Cleaning Waste management  Cleaning waste scattered surrounding  Proper waste management system  Use hose wipe
 Hose burst/disconnected and hit personnel  Set-up container/drums for cleaning  FPG to inform PIC prior to work
 Wrong labeling - product as waste vice waste execution
versa  Use spent drum  Mind on task

 Wear all required PPE. Reconfirm by  Job supervisor give toolbox talk
physical and visual check prior to use prior commencement of the task.
 Scaffolding with valid green tag  Working area barricaded
 Use full body harness with double complete with proper/suitable
lanyard signage
 Body harness hooked at the hire point  Minimize WAH activity where
Working at height  Falling objects from working platform possible
 Slip down  When working at height involved
handling of material, barricade lower
location as well, and put on safety watch
to ensure no one is walking below or in
danger zone
 Conducted by well trained workers

 Hand or finger injury  Use semi lather glove and suitable PPE  Job supervisor give toolbox talk
 Use right tools for the right job. prior commencement of the task.
 Falling object
De-blinding and box-up work  Cover sharp edges with cotton to avoid  Working area barricaded and
 Pinching/sharp object proper signage erected at
pinching/injuries.
 Slip, trip and fall working area.
 Watch the step and be extra precaution
Page | 6
DOCUMENT NO: HSE-JSA-FPG-001

TITLE: Job Safety Analysis (JSA) REV: 00 DATE PRODUCED: Mar 20, 2024

 Toxic/flammable gas of surrounding for any obstructions /


 Deficient of oxygen hazards.
 Use suitable breathing apparatus.
 Use proper ventilation fan
 Adequate ventilation duration
 Proper Lighting
 Shut down all power supply and blinding
off piping connected to the vessel
 All work activities are carried out by
competent person
 Supervisor conduct inspection, monitor
the work activities and to ensure safety
standards and procedures are strictly
adhered to.
 Small items/loose items must be placed
inside container/bag/bucket. Do not put
any loose item on grating or floor
 Tie all hand tools using tools lanyard  Job supervisor give toolbox talk
 All bolts and nuts keep in container and prior commencement of the task.
place it at secure place

 Falling objects - spanner and bolts & nuts  Use proper tools
Flange Management - Bolt tightening using Manual
Torque Wrench  Hand injury (pinch point)  Use suitable hand glove to avoid hand
injury (semi leather or dotted cotton
glove to ensure good grip)
 Job performed by trained workers

Page | 7
DOCUMENT NO: HSE-JSA-FPG-001

TITLE: Job Safety Analysis (JSA) REV: 00 DATE PRODUCED: Mar 20, 2024

 Maintains awareness of steps  Close/handback PTW


 Remove/discard all unnecessary  Ensure that operation verify that
materials, waste, excessive materials, the job is completed
signage and barricade.
 Slip  Maintain awareness of slippery surfaces.
 Trip  Wear all required PPE.
Housekeeping  Fall  All waste product shall be put in proper
 Hazardous material waste basket and remove to dispose
area immediately
 Leave the location tidy and free from any
leftover material

Page | 8
DOCUMENT NO: HSE-JSA-FPG-001

TITLE: Job Safety Analysis (JSA) REV: 00 DATE PRODUCED: Mar 20, 2024

Reviewed by
Prepared by Verified by Approved by

Name: Siti Sahfinah Binti Zulkiflee Name: Azizi Bin Kari Name: Name:
Designation: Obza’s Safety Supervisor Designation: Obza’s Superintendent Designation: Designation:
Note: Where necessary, please consider to have SHES personnel review during this JHA establishment.

SIGN OFF VERIFICATION (PRIOR TASK/WORK EXECUTION):

Proclaimer

1. I have read and understood the requirements of this JHA;

2. I have assessed the job site for new or changed hazards, and I have prepared control for those extra hazards and had incorporated into this JHA.

TABLE BELOW TO BE ENDORSED BY ALL PERSONNEL INVOLVED IN EXECUTING THE TASK/WORK.

NO. FULL NAME ID NO. DESIGNATION/COMPANY SIGNATURE DATE

Page | 9