6ABHA09- INSPECTION & TEST PLAN (ITP) FOR INSTALLATION & TESTING OF GLAZED CURTAIN WALLS
Review Sheet
Ref: 6ABHA09-ABHA-08-MBL-AR-ITP-00010 Revision 00 Date & Time 14 January 24
Client: Saudi Entertainment Ventures
Project Management Consultant and Engineer Saudi Consolidated Engineering Company - Khatib & Alami
Assistant Engineer and Supervision Consultant DAR International for Engineering Consultancy
Contractor Modern Building Leaders
Area / Location
Discipline:
☐ Civil ☐ Structural ☒ Architectural ☐ Mechanical ☐ GM ☐ Electrical ☐ HV ☐ IR ☐ Plumbing ☐ Quality ☐ BIM
☐ Project Control ☐ Quality Management ☐ FLS/Safety ☐ General ☒ Other (specify if other): Inspection Test Plan

Assistant Engineer and Supervision Consultant: DAR Engineering


Comments:
ITP and The check list is a live document that can be modified during the construction processes.
Eng. Name: Ashraf Abdalrahim Signature: Date: 14 January 24
Submittal Status:

☐ A- Approved ☒ B- Approved with Comments ☐ C- Revise & Resubmit

Project Management Consultant and Engineer: Khatib and Alami


Comments:
1-Reference relevant parts of the method statement /approved work procedures for items 3.1 to 3.7 incl. in
accordance with Schedule G requirement for applied procedures to be referenced under the ITP. Note method
statement and approved drawings/schedules to be stored in box at notified location for view during installation
and final inspection. 2- Material submittals for different types of curtain wall referenced under ITP Activity 1.2
should be referenced under separate ITP activity number's including the relevant Specification Section/
Parts/Clauses and compliance criteria. 3- Under Specification Section 08 11 13 Part . either demonstrate compliance
with clause (structural glazing type of curtain wall) or clause (spider system type of curtain wall). Kindly proceed as
commented.
Eng. Name: Shahzad Ali Signature: Shahzad Ali Date: 14 January 24
Submittal Status:

☐ Reviewed ☒ Reviewed with Comments


Client: Saudi Entertainment Ventures – SEVEN (IF REQUIRED)
Comments:

Eng. Name: Signature: Date: 14 January 24


Submittal Status:

☐ A- Approved ☐ B- Approved with Comments ☐ C- Revise & Resubmit


IMPORTANT: Permission to proceed does not relieve the Contractor from full compliance with contractual obligations, responsibility, and the Local Authorities requirements.

Page 1 of 1
Client PMC LDC Contractor
Saudi Entertainment Ventures Khatib & Alami Dar International Engineering Consultancy Modern Building Leaders
Project name: Program 6: Abha Entertainment Complex
Location: Abha Contract No.:

INSPECTION TEST PLAN


6ABHA09- INSPECTION & TEST PLAN (ITP) FOR INSTALLATION & TESTING OF GLAZED CURTAIN WALLS

New Submittal Submittals NO Submittals date Revision Previous submittal date

Resubmit 6ABHA09-ABHA-08-MBL-AR-ITP-00010 13-Jan-2024 00

Document purpose For Information For Notes For Approval

DECPLINE Sewage Struc. BIM Architectural

(Quality) (Method statement) (Time Schedule) (Safety)

Document type (Soil Report) (Policies) (Monthly Report) (General Report)

Weekly Report) INSPECTION TEST PLAN

Attachments 1 2 3

Sr. Document TITLE Document NO Document Status Notes

6ABHA09- INSPECTION & TEST PLAN (ITP) FOR


1 INSTALLATION & TESTING OF GLAZED CURTAIN 6ABHA09-ABHA-08-MBL-AR-ITP-00010 For Approval
WALLS

Sr.Project Manger (Contractor) Sr. Engineer (Contractor)

Name: Eng. Mohamed KotbTahoun

Signature: Technical Office Manager

Date: 13-Jan-24

Remarks:

Supervision Consultant representative PMC representative

Name: Ashraf AbdalRahim Signature: Name: Signature:

Position: Resident Engineer Date: Position: Date:

Document Status

(A) Approved As Submitted (B) Approved with Comments (C) Revise and Resubmit (D) Rejected

Issued by the contractor: Signature: From the consultant: Signature:


Date: Date:

FR-QC-CW0091-01 Issue Date 14 November 2021 Rev.00


ITP Submittal
Internal Review Checklist

Project Name: P6 - Abha ITP no.: P6-ABHA-MBL-ITP-10


Contract No: 9.22 Rev. no.: 0
Contractor: MBL Date: 13-Jan-24
Sub-Contractor: Discipline: Architectural

ITP description : Glazed Curtain Walls

No. Item Yes No N/A Comment

1 Has the scope of inspections & tests been well defined?

Has the mock-up inspection tests with frequency of the mock-up inspection tests been
2
included with Respecting W and H points?

3 Has the samples inspection tests been included with Respecting W and H points?

Are items to be inspected and tested including test stages identified and presented in a
4
logical construction order?

Are controlling documents such as test procedure, method statement, project


5
specification, related standards been included?
Are all Quality Control requirements including, pre-task quality brief, calibration, Shop
6 drawings,Redline drawing monitoring, clearance from other disciplines, and turn-over
review detailed as required?
Are acceptance criteria with a clear tolerance for each inspection and test been
7
specified?

8 Has the frequency of inspection and testing been included?

Are verifying documents has been identified with clear reference to applicable checklists
9
and forms?
Does the ITP include notification requirements for “Work Inspection Request” (WIR)/
10 Material inspection request (MIR)?(Minimum (24) hours for site work and (1) week in
advance for inspections requested during holidays and Fridays.
Does the ITP include specific code/ standard to be used for each inspection/ test in
11
accordance with the requirements of SEVEN List of Codes & Standards?

12 Are responsibilities related to inspection and test been included?

13 Are there references to Applicable procedures for testing & inspection.?

Are the 3rd party, MBL, LDC, PMC ,and SEVEN hold, witness review points been
14
established among all parties with a clear definition in the legend?

15 Does the ITP specify the percentage of tests to be done/ sampling plan?

16 Has SEVEN Project number been speicifed?

17 Are the reporting forms & checklist been included as an attachment to the ITP?

18 Are previous submittal comments have been addressed and replied?

Has the inspection & test plan been signed off by designated competent preparer,
19
reviewer and approver?

Does the inspection & test plan format & language is as per project requirements and
20
easy to understand?

Does the inspection & test plan include the repair stage or contain a reference to a
21
separate Special Procedure for repairs?

Does the inspection and test plan require an activity for the protection of completed
22
work? If yes is the approved Method/procedure mentioned in the Reference?

Conclusion/ Remarks

Prepared by: Reviewed by: Accepted by:


Name Robert Benosa Mosaab Basher Mohamed Gad
Designation MBL QA/QC Engineer MBL QA/QC Sr. Engineer MBL QA/QC Manager

Signature

Date

Aconex Ref#6ABHA09-ABHA-08-MBL-AR-ITP-00010 Rev#00 Date: 13-Jan-24


SAUDI ENTERTAINMENT VENTURES Modern Building Leaders (MBL)

Utilized By
Document Number 6ABHA09-ABHA-08-MBL-AR-ITP-00010 Document Type INSPECTION AND TEST PLAN Contract Number
Document Title Inspection Test Plan Issued by MBL SEVEN Project ID
Revision Number 0 Issue Date 06.01.2024 Start Date End Date

Title 6ABHA09 - Inspection & Test Plan (ITP) for Installation & Testing of Glazed Curtain Walls
ITP Number 6ABHA09-ABHA-08-MBL-AR-ITP-00010 Discipline ARCHITECTURAL ITP Approval Date
Project Title ABHA-P6 Entertainment Complex
WIR No
INSPECTION
RESPONSIBILITY
ITEM Acceptance Reference Recording
TASK / ACTIVITY Frequency Check List REMARKS

FLS/AC
SEVEN
PARTY
NO. Criteria / Controlling Document Document

3RD.

PMC
MBL

LDC
1.0 DOCUMENT REVIEW

1.1 Material Submittl , Shop Drawing , Methoed Statement Review Prior to start Activity N/A Specs 08 11 13 Aconec Approval N/A H H R N/A SR

1.2 Mock-up Sample Board & Preinspection Dossiue , PRQ, 3rd party Review Prior to start Activity N/A Specs 08 11 13 Aconec Approval N/A H H H N/A N/A

2.0 ONSITE RECEIVING INSPECTION

Submittal approved
2.1 Submission of drawings, MIR & review and approval Document Review 6ABHA09-ABHA-08-MBL-AR-TRN-00102 Specs 08 44 13 MIR N/A H H R N/A N/A
Design

3.0 EXAMINATION & Installation System Curtain Wall

Document Review
3.1 EXAMINATION Once 6ABHA09-ABHA-08-MBL-AR-TRN-00102 Specs 08 44 13 - 7 checklist 2.1 N/A H W S N/A N/A
/ Visual Inspection

Document Review Specs 08 44 13 - 7


3.2 Installation Mock-up & inspection Once 6ABHA09-ABHA-08-MBL-AR-TRN-00102 WIR N/A H H H H H
/ Visual Inspection SD & CL 2.1,2.2,2.3

Specs 08 44 13 - 8,SD&
3.3 TOLERANCES Test Once 6ABHA09-ABHA-08-MBL-AR-TRN-00102 Checklist 2.2 N/A H W S N/A N/A
CL2.1Survey report

Specs 08 44 13 - 9 &SD &


3.4 ADJUSTING Test Once 6ABHA09-ABHA-08-MBL-AR-TRN-00102 Checklist 2.3 N/A H W S N/A N/A
CL2.1,2.2,2.3,2.4

Document Review
3.5 PROTECTION Once 6ABHA09-ABHA-08-MBL-AR-TRN-00102 Specs 08 44 13 - 9 &SD Checklist 2.4 N/A H W S N/A N/A
/ Visual Inspection
Specs 08 44 13 - 9 ,SD &
3.6 Curtain Wall check & Pull out Test Test (Pull Out) Once 6ABHA09-ABHA-08-MBL-AR-TRN-00102 Survey report & MEP WIR H H H R N/A S/R
Clearance
Water Penetration
3.7 Final inspection & Water Test Resistance Once 6ABHA09-ABHA-08-MBL-AR-TRN-00102 Specs 08 44 13 - 5 &SD WIR H H H R N/A S/R

GENERAL NOTES

1 The first three incidents of each Inspection or testing activity listed require 100 % participation by the Consultant. After this period, the Consultant may adjust the levels of SEVEN participation based upon the Contractor’s performance.
2 Surveillance: Q A/QC organization to monitor work in progress without notice from Construction Organization

3 Witness: Q A/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative is not present.
4 Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.
5 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Consultant
LEGEND
H Hold Point for QC Inspection/ Test R Review of Documents
W Witness Inspection/Test S Surveillance

Aconex Ref#6ABHA09-ABHA-08-MBL-AR-ITP-00010 Rev#00 Date: 13-Jan-24


P6 ABHA Entertainment Complex
Project Management Consultant and Engineer: Supervision Consultant & Engineer’s Assistant Contractor:
Client:

Inspection and Test Plan (Check List)


Checklist No: Revision 01 Date 28/12/2023
Client: Saudi Entertainment Ventures
Project Management Consultant and Engineer Saudi Consolidated Engineering Company - Khatib & Alami
Supervision Consultant & Engineer’s Assistant DAR International for Engineering Consultancy
Contractor Modern Building Leaders Company (MBL)
Subcontractor United Aluminum Company (UAAC)
Building /Zone
Discipline ☐ Civil ☒ Architecture ☐ Mechanical ☐ Plumbing ☐ Electrical ☐ IT ☐ Landscape ☐ Quality
☐ Project Control ☐ Construction Management ☐ FLS/Safety ☐ Other (specify if other):

Receiving Inspection for Curtain Wall


ITEM Not
Check Points Reference Pass Fail Re-Inspection
NO. Applicable

2.1 EXAMINATION

Verify dimensions, tolerances, and method of attachment 08 44 13-7


a ☐ ☐ ☐
with other work. 3.02-A

. Verify that wall openings and adjoining air and vapor seal 08 44 13-7
b ☐ ☐ ☐
materials are ready to receive work of this section. 3.02-B

Verify that anchorage devices have been properly installed 08 44 13-7


c ☐ ☐ ☐
and located. 3.02-C

Page 1 of 5

Aconex Ref#6ABHA09-ABHA-08-MBL-AR-ITP-00010 Rev#00 Date: 13-Jan-24


P6 ABHA Entertainment Complex
Project Management Consultant and Engineer: Supervision Consultant & Engineer’s Assistant Contractor:
Client:

2.2 Installation – Mockup & Inspection ☐ ☐ ☐


Install wall system in accordance with manufacturer's 08 44 13-7
A ☐ ☐ ☐
instructions 3.03-A
Attach to structure to permit sufficient adjustment to
08 44 13-7
B accommodate construction tolerances and other
3.03-B
☐ ☐ ☐
irregularities.
Provide alignment attachments and shims to permanently 08 44 13-8
C ☐ ☐ ☐
fasten system to building structure. 3.03-C
Check plumb and level, twist. Maintain assembly 08 44 13-8
D
dimensional tolerances, aligning with adjacent work. 3.03-D
☐ ☐ ☐
Provide thermal isolation where components penetrate or 08 44 13-8 ☐ ☐
E ☐
disrupt building insulation. 3.03-E
Install sill flashings. Turn up ends and edges; seal to 08 44 13-8
F ☐ ☐ ☐
adjacent work to form water tight dam. 3.03-F
Pack fibrous insulation in shim spaces at perimeter of 08 44 13-8
H ☐
assembly to maintain continuity of thermal barrier 3.03-H ☐ ☐
08 44 13-8
I Install operating sash
3.03-I ☐ ☐ ☐
Pressure Plate Framing: Install glazing and infill panels in
08 44 13-8
K accordance with Section 08 80 00, using exterior dry ☐
3.03-K ☐ ☐
glazing method.
Sloped Glazing with External Horizontal Mullions: Place
sealant on the upslope side of the pressure plate cover 08 44 13-8
L
caps; finish the surface with a slope for drainage over the 3.03-L
☐ ☐ ☐
cap.
Page 2 of 5

Aconex Ref#6ABHA09-ABHA-08-MBL-AR-ITP-00010 Rev#00 Date: 13-Jan-24


P6 ABHA Entertainment Complex
Project Management Consultant and Engineer: Supervision Consultant & Engineer’s Assistant Contractor:
Client:

Structural Adhesive Glazing: Install glazing adhesive and


08 44 13-8 ☐ ☐ ☐
M weather seal sealant in accordance with adhesive
3.03-M
manufacturer's instructions.
Touch-up minor damage to factory applied finish; replace 08 44 13-8
N ☐ ☐ ☐
components that cannot be satisfactorily repaired. 3.03-N

2.3 TOLERANCES ☐ ☐ ☐

08 44 13-8
A Maximum Variation from Plumb: (3 mm/m) ☐ ☐
3.04-A ☐
Maximum Misalignment of Two Adjoining Members 08 44 13-8
B
Abutting in Plane (0.8 mm). 3.04-B
☐ ☐ ☐
Sealant Space Between Curtain Wall Mullions and
08 44 13-8
C Adjacent Construction: Maximum of (20 mm) and ☐ ☐ ☐
3.04-C
minimum of (6 mm)

2.4 ADJUSTING ☐ ☐ ☐

08 44 13-9 ☐
A Adjust operating sash for smooth operation. ☐ ☐
3.06-A

Page 3 of 5

Aconex Ref#6ABHA09-ABHA-08-MBL-AR-ITP-00010 Rev#00 Date: 13-Jan-24


P6 ABHA Entertainment Complex
Project Management Consultant and Engineer: Supervision Consultant & Engineer’s Assistant Contractor:
Client:

2.5 CLEANING ☐ ☐ ☐

Remove protective material from pre-finished aluminium 08 44 13-9


A ☐ ☐ ☐
surfaces. 3.07-A
Wash down surfaces with a solution of mild detergent in
08 44 13-9
B warm water, applied with soft, clean wiping cloths. Take
3.07-B ☐ ☐ ☐
care to remove dirt from corners. Wipe surfaces clean.

08 44 13 9
* Survey Report & MEP Clearance after framing
3.07 B
☐ ☐ ☐
Remarks

Contractor Project Management Consultant and Engineer


Contractor Construction Third Party (if applicable)

Page 4 of 5

Aconex Ref#6ABHA09-ABHA-08-MBL-AR-ITP-00010 Rev#00 Date: 13-Jan-24


P6 ABHA Entertainment Complex
Project Management Consultant and Engineer: Supervision Consultant & Engineer’s Assistant Contractor:
Client:

☐ The work is ready for inspection ☐ Document Reviewed ☐ Work Inspected ☐ Test Records Verified

Name Signature Date Name Signature Date

Contractor QC Inspector Supervision Consultant & Engineer’s Assistant


☐ The work is ready for inspection ☐ Document Reviewed ☐ Work Inspected ☐ Test Records Verified

Name Signature Date Name Signature Date

Page 5 of 5

Aconex Ref#6ABHA09-ABHA-08-MBL-AR-ITP-00010 Rev#00 Date: 13-Jan-24

You might also like