Azeem Ahmad CV (2023)

You might also like

Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

Name Azeem Ahmad

Address Al Jubail Saudi Arabia


Mobile No. 00966-553456052
Email qcazeem11@gmail.com
Saudi Iqama Valid

Professional Sum- Mechanical Engineer professional with nearly 6 years’ experience, with specialization in
mary firefighting systems and related standards.

Education Bachelor of Technology in Mechanical Engineering


Professional Experience
Oct-2022 To Present Saudi electricity Company, Qurrayah Power Plant (GB Contracting co.)
Fatima Al Sowiml
Jubail ,Saudi Arabia
Position: Qa/Qc Engineer (Mechanical)
For RTR Pipe Line:

Responsible for all preliminary inspection of monitoring, recording, final inspection


& Holdpoints, surveillance of piping that have been established in Project Specification &
ITP.
■ Review and updating all documents related to Mechanical activities.
■ Maintaining and updating the day to day inspection records according to the system.
■ Coordinate with client inspector for day to day activities and stage wise inspection.
■ Ensure that all inspection done as per activity wise in the approved ITP.
■ Coordinate and assisting client & site construction team for effective integration of QC
daily activityfrom daily stage reports to final acceptance report.
■ Ensure satisfactory identification of materials, proper protection of piping and fittings.
■ Verify proper size, RTR PN, rating of flanges, proper flange face and fittings.
■ Check flow direction arrows on valves; verify that the properly identified valves
are installedinaccordance with the flow diagram.
■ Release the inspected material for construction to various project.
■ Review of Isometric drawings and MTO.
■ Ensure that proper application of painting as per the approved procedure.
■ Painting inspections from surface to final visual inspection of the equipment’s and pipelines.
■ Ensure that pipe supports, hangers and guides have been installed in
according with thepipingdrawings and the pipe support details.
■ Preparation and review of Mark-up Isometric drawing as fabricated and installed.
■ Conducting visual inspection of fit-up and dimensions of pipe spools during fabrication.
■ To assure complete and correct execution of piping and welding activities as per
approvedProjectQuality Procedure and Schedule Q.
■ Preparation and review of Pressure Test Packages.
■ During heating of Joint , check the temperature of the belt.
■ Verify initiation of field piping and equipment pressure test punch list. Ensure
correction orcompletion of punch list items.
■ Verification of proper valid calibration gauges, PRV & Testing Manifold
as per ProjectSpecification.
■ Monitoring the preparation of Pressure Testing and Execution of Pressure Test
as per theProjectSpecification and Standard.
■ Check and assure that all adhesive joints are exposed for examination during pressure test.
■ Check vents are open when filling and draining lines.
■ 100% visual inspection of adhesive joints using appropriate method during pressure test.
■ Verify that the required test pressure was maintained for the specified length of time
with noacceptable leakage.
■ Confirm repairs, re-testing and re-inspection in accordance with standard and specifications.
■ Ensure blinds are removed and correct gaskets are installed.
■ Verify that valves and other items that were removed for the test are replaced.
Verification of closed punch items and conduct walk through for each completed
piping

1
AZEEM AHMAD
Metito Overseas Limited
Al Shuqaiq, Saudi Arabia
Position: Qa/Qc Engineer (Mechanical)
■ Familiarize in PFD, P&ID, Plan Layout Drawing, Isometric, detail shop spool fabrication and
General Arrangement Drawing.
■ ITP, Method of Statement, WPS, Project Specification and International Standards, documents
Dec-2021 To Oct-22 review before conducting inspections.
■ To conduct Inspection of static equipment like; Heat exchanger,Vessels ,Column,Drum,Flare,Multi-
Pint Linear ground flare,Cold box,GRP Tanks,GLS tank, GRP Panel,Tank Silo.
■ Familiar with, Tanks, Distillation columns, Vertical and Horizontal Vessels & Drums,
Exchangers, etc.
■ To conduct Hydro Test and Pneumatic test as per Project technical specifications of Piping and
Static equipment ( Heat exchangers ).
■ Review procedure for Hydro test/ Pneumatic test of piping.
■ Coordination with Clients inspectors for getting the feedback for open log book entries and
preparations of corrective actions to close those violations.
■ Check flow direction arrows on valves; verify that the properly identified valves are installed in
accordance with the flow diagram.
■ Inspection of gaskets, supports, valves prior to line reinstatement acceptance as per the latest
drawing for construction, codes and specification standard
■ All walk downs including, MCC ,LINE CHECK and punch making and clearing.
Witnessing of Flange joint assembly and bolt torque
■ Raising and closing of daily and weekly RFIS of concerned activities In their respective areas,
■ Checking of material specification as per IFC MTO & Isometrics.
■ Going through the scope of work Inspection of mechanical Activities, quality & standards of the
design are maintained as per the Project procedure Manual, with international standards.
■ Material Identification which includes checking of heat no, dimensional, physical inspection and
vendor certificates and preparing the reports for the same.
■ Raising RFI and close the RFI as per drawing and client satisfaction.
■ Identify the damage material preparing OSID report.
■ Routine supervision and recommendation of ongoing work activities coordinating with the
construction team
■ Regular Monitoring and Reviewing of Calibrated Measuring and Test Instruments.
Punch verification at site and coordinating with construction for timely closure of punch items.
■ Marking, Fit up, welding, Installation, Leveling, Final Internal Inspection and Box up for pressure
vessels & Tanks.
■ Inspecting the Orientation, Elevation and Plumpness Cantering & levelling for
0° ,90°, 180°, 270°.
■ Performing of Alignment inspection by various methods reverse dial alignment, rim and face
alignment.
■ Prior to hydrostatic test review the test package, check the line and make punches if found
anything against the specification. After killing the punches check the line to confirm and prepare for
hydrostatic test.
■ Foundation release prior to installation and inspecting of Levels, centers/anchor pockets / anchor
bolts & Foundation surface condition.
■ Laying equipment on foundation and inspect orientation / position of equipment.
■ Alignment before grouting: Foundation and hold down bolts / levelness of driver / Main flange of
driven / shaft alignment and DBSE.
■ Alignment confirm just before piping attachments: Soft foot/ foundation and hold down bolts/
piping to equipment nozzle parallelism, offset gap / shaft alignment / DBSE / Sag check for alignment
fixtures.
■ RTR,HDPE piping Lamination ,Adhesive joint & Electrofusion welding ;Supervision & Hydro
Test
■ Alignment during and after piping: Install flange bolts and gaskets / pipe strain / Shaft alignment /
DBSE / shaft movement / Coupling installation and mechanical seal.
July-2021 To Dec-2021 Expertise Contracting Company
Al Shuqaiq, Saudi Arabia
Position: Qa/Qc Engineer (Mechanical)
■ Familiarize in PFD, P&ID, Plan Layout Drawing, Isometric, detail shop spool fabrication
andGeneralArrangementDrawing. ■
ITP, Method of Statement, WPS, Project Specification and International Standards, documents review
before conducting inspections.
■ Familiar with, Tanks, Distillation columns, Vertical and Horizontal Vessels & Drums,
Exchangers, etc.

2
■ To conduct Hydro Test and Pneumatic test as per Project technical specifications of Piping and
Static equipment ( Heat exchangers ).
■ Review procedure for Hydro test/ Pneumatic test of piping.
■ Coordination with Clients inspectors for getting the feedback for open log book entries and
preparations of corrective actions to close those violations.
■ Check flow direction arrows on valves; verify that the properly identified valves are installed in
accordance with the flow diagram.
■ Inspection of gaskets, supports, valves prior to line reinstatement acceptance as per the latest
drawing for construction, codes and specification standard
■ All walk downs including, MCC ,LINE CHECK and punch making and clearing.
Witnessing of Flange joint assembly and bolt torque
■ Raising and closing of daily and weekly RFIS of concerned activities In their respective areas,
■ Checking of material specification as per IFC MTO & Isometrics.
■ Going through the scope of work Inspection of mechanical Activities, quality & standards of the
design are maintained as per the Project procedure Manual, with international standards.
■ Material Identification which includes checking of heat no, dimensional, physical inspection and
vendor certificates and preparing the reports for the same.
■ Raising RFI and close the RFI as per drawing and client satisfaction.
■ Identify the damage material preparing OSID report.
■ Routine supervision and recommendation of ongoing work activities coordinating with the
construction team
■ Regular Monitoring and Reviewing of Calibrated Measuring and Test Instruments.
Punch verification at site and coordinating with construction for timely closure of punch items.
■ Marking, Fit up, welding, Installation, Leveling, Final Internal Inspection and Box up for pressure
vessels & Tanks.
■ Inspecting the Orientation, Elevation and Plumpness Cantering & levelling for
0° ,90°, 180°, 270°.
■ Performing of Alignment inspection by various methods reverse dial alignment, rim and face
alignment.
■ Prior to hydrostatic test review the test package, check the line and make punches if found
anything against the specification. After killing the punches check the line to confirm and prepare for
hydrostatic test.
■ Foundation release prior to installation and inspecting of Levels, centers/anchor pockets / anchor
bolts & Foundation surface condition.
■ Laying equipment on foundation and inspect orientation / position of equipment.

April 2019-To Mar-2020 Saudi electricity Company, WAS Power Plant (REDA FIRE HAZARD CONTROL)
Turaif ,Saudi Arabia
Position: Qa/Qc Engineer (Electro-Mechanical)

Responsible for all preliminary inspection of monitoring, recording, final inspection


& Holdpoints, surveillance of piping that have been established in Project
Specification & ITP.
■ Review and updating all documents related to Mechanical activities.
■ Maintaining and updating the day to day inspection records according to the system.
■ Coordinate with client inspector for day to day activities and stage wise inspection.
■ Ensure that all inspection done as per activity wise in the approved ITP.
■ Coordinate and assisting client & site construction team for effective integration of QC
daily activityfrom daily stage reports to final acceptance report.
■ Ensure satisfactory identification of materials, proper protection of piping and fittings.
■ Verify proper size, schedule of pipe, rating of flanges, proper flange face and fittings.
■ Check flow direction arrows on valves; verify that the properly identified valves
are installedinaccordance with the flow diagram.
■ Release the inspected material for construction to various project.
■ Review of Isometric drawings and MTO.
■ Ensure that proper application of painting as per the approved procedure.
■ Painting inspections from surface to final visual inspection of the equipment’s and pipelines.
■ Ensure that pipe supports, hangers and guides have been installed in
according with thepipingdrawings and the pipe support details.
■ Preparation and review of Mark-up Isometric drawing as fabricated and installed.
■ Conducting visual inspection of fit-up and dimensions of pipe spools during fabrication.
■ To assure complete and correct execution of piping and welding activities as per
approvedProjectQuality Procedure and Schedule Q.

3
■ Ensure NDT clearance, as per project requirements before pressure testing.
■ Preparation and review of Pressure Test Packages.
■ Verify initiation of field piping and equipment pressure test punch list. Ensure
correction orcompletion of punch list items.
■ Verification of proper valid calibration gauges, PRV & Testing Manifold
as per ProjectSpecification.
■ Monitoring the preparation of Pressure Testing and Execution of Pressure Test
as per theProjectSpecification and Standard.
■ Check and assure that all joints are exposed for examination during pressure test.
■ Check vents are open when filling and draining lines.
■ 100% visual inspection of joints using appropriate method during pressure test.
■ Verify that the required test pressure was maintained for the specified length of time
with noacceptable leakage.
■ Confirm repairs, re-testing and re-inspection in accordance with standard and specifications.
■ Ensure blinds are removed and correct gaskets are installed.
■ Verify that valves and other items that were removed for the test are replaced.
Verification of closed punch items and conduct walk through for each completed piping
Feb-2017 To April-2019 Umm Wu al Phosphate Project-Sandvik-Waste Conveying System (FLOOR) , SOP-5 Project
& (Gulf Asia Contracting Co. LLC) & Umm Wu al Phosphate Project-Utilities & Infrastructure
July-2020 To June-2021 Works Production Well 20 & 24 (REDA FIRE HAZARD CONTROL)
Turaif ,Saudi Arabia
Position: Qa/Qc Engineer (Electro-Mechanical)

Responsible for all preliminary inspection of monitoring, recording, final inspection


& Holdpoints, surveillance of piping that have been established in Project
Specification & ITP.
■ Review and updating all documents related to Mechanical activities.
■ Maintaining and updating the day to day inspection records according to the system.
■ Coordinate with client inspector for day to day activities and stage wise inspection.
■ Ensure that all inspection done as per activity wise in the approved ITP.
■ Coordinate and assisting client & site construction team for effective integration of QC
daily activityfrom daily stage reports to final acceptance report.
■ Ensure satisfactory identification of materials, proper protection of piping and fittings.
■ Verify proper size, schedule of pipe, rating of flanges, proper flange face and fittings.
■ Confirming the received materials specification to the actual project
requirement with thereference of Isometric drawing.
■ Release the inspected material for construction to various project.
■ Review of Isometric drawings and MTO.
■ Ensure that proper application of painting as per the approved procedure.
■ Checking the DFT of the applied paint on every coat.
■ Painting inspections from surface to final visual inspection of the equipment’s and pipelines.
■ Ensure that pipe supports, hangers and guides have been installed in
according with thepipingdrawings and the pipe support details.
■ Preparation and review of Mark-up Isometric drawing as fabricated and installed.
■ Conducting visual inspection of fit-up and dimensions of pipe spools during fabrication.
■ To assure complete and correct execution of piping and welding activities as per
approvedProjectQuality Procedure and Schedule Q.
■ Ensure NDT clearance, as per project requirements before pressure testing.
■ Preparation and review of Pressure Test Packages.
■ Verify initiation of field piping and equipment pressure test punch list. Ensure
correction orcompletion of punch list items.
■ Verification of proper valid calibration gauges, PRV & Testing Manifold
as per ProjectSpecification.
■ Monitoring the preparation of Pressure Testing and Execution of Pressure Test
as per theProjectSpecification and Standard.
■ Check and assure that all joints are exposed for examination during pressure test.
■ Check vents are open when filling and draining lines.
■ 100% visual inspection of joints using appropriate method during pressure test.
■ Verify that the required test pressure was maintained for the specified length of time
with noacceptable leakage.
4
■ Confirm repairs, re-testing and re-inspection in accordance with standard and specifications.
■ Ensure blinds are removed and correct gaskets are installed.
■ Verify that valves and other items that were removed for the test are replaced.
Verification of closed punch items and conduct walk through for each completed piping
Aramco (UG Surface Facilities-System-B project)
Aug-2016 To Jan-2017 (REDA FIRE HAZARD)
Turaif ,Saudi Arabia

Position: Qa/Qc Engineer

Verification of closed punch items and conduct walk through for each completed piping.

Academic Qualification
2016 A.P.J Abdul Kalam Azad Technical University,U.P. India
Bachelor of Technology in Mechanical Engineering
2012 Central Board Of Secondary Education
INTERMEDIATE SCIENCE
Professional Expertise
Familiar with International Standards Like (NFPA,ASME B31.3 & ASME Section IX)
Soft skills
AutoCAD 2012, Microsoft Office 2003-2007.
Languages
English: Fluent
Hindi: Fluent
Personal Details
Father’s Name: Azeem Ahmad
Date of Birth: 09/03/1996
Nationality: Indian
Sex: Male
Marital Status: Un-Married
KSA Visa Status: Valid
KSA Resident No: 2457945976 (Expiry on 07th May 2024)
Permanent Address
City Gajraula ,Amroha U.P. India
Phone No: +918285818735
Passport Details
Passport No. R2149787
Date of Expiry: 27/08/2027
Place of Issue: Bareilly, India
Declaration
I hereby declare that the above-mentioned statement are true and correct to the best of my knowledge
and belief.
Thanking you,
AZEEM AHMAD

You might also like