Project- Construction of Residential Apartments in Raichur
Position- Site Engineer Period- August 2020 – February 2021
Executed work on site according to drawings and specifications.
Preparation of work planning schedule, material acquisition, cost control and documentation. Checking Formwork and reinforcements. Inspection as per specifications and with clients prior to concrete pouring. Making cube casting reports, compression strength reports for concrete and steel test reports. Estimation and cost analysis. Co-ordination with sub-contractors and material suppliers for smooth progress.
Project – Road repairing works, Raichur Highway
Position- Site engineer Period – June 2021- Jan 2022
Tendering works, billing
Cost estimation and analysis Testing of concrete, sand and other materials and making reports. Co-ordination with PWD engineers and sub contractors Preparing work schedule reports daily, weekly and monthly. Survey work using Total station and Auto level. Quality control. Execution of Highway construction from C&G, earthwork, Emb-filling, sub-grade construction, Road markings,etc
Project – Sewage Treatment Plant
Position- Site engineer Period – July 2022- April 2023
Design and RCC work checking.
Preparation of Layout plan Preparation of Process flow diagrams and Piping and Instrumentation Diagrams. Approvals from State pollution Boards. Estimation and cost analysis,billing Organizing the Client visit to check dimensions of Civil Tank as per design. Quality control, environment checks like air control Procurement of materials, labour, etc Work planning schedule daily, weekly, monthly. Ensuring piping material as per standards. Water testing as per Govt approved Boards. Inspection and testing of Plant run by fresh water to avoid leakages.