Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 35

This file presents the data from the tables and figures in CBO's October 2023 report An Analysis

of the Navy’s Fisca


www.cbo.gov/publication/59508

Contents

Tables
Table 1.
Emphasis
Table 2. and Cost of the Alternatives in the Navy’s 2024 Plan, as Assessed by CBO
Difference
Table 3. Between the Number of Ships in Today’s Fleet and the Number in 2045_x000D_ Under the Navy’s 2024
Comparison
Table 4. of Ship Purchases and Estimated Costs in the Navy’s Fiscal Year 2023 and Fiscal Year 2024 Shipbuild
The Navy’s
Table 5. Inventory Goals, 2016 to 2022
The
TableComposition
6. of the Fleet in 2045 Under the 2024 Plan Compared With the Navy’s_x000D_ Most Recent Shipbu
Cost
TableOverruns
7. and Unit Cost Growth for Selected Navy Shipbuilding Programs
Average
Table 8. Annual Total Shipbuilding Costs Under the Navy’s 2024 Plan
Comparison of the Navy’s and CBO’s Estimates of the Construction Costs of Major New Ships Under the Navy’s 20

Figures
Figure 1.
Annual2.
Figure Inventories of Battle Force Ships Under the Navy’s 2024 Plan
Requested
Figure 3. and Appropriated Shipbuilding Budgets, 2014 to 2023
Inventories
Figure 4. of Selected Categories of Ships Under the Navy’s 2024 Plan
Purchases
Figure 5. of Selected Categories of Ships Under the Navy’s 2024 Plan
The Navy’s
Figure 6. Estimates of Average Annual Costs of New-Ship Construction Under Its 2024 Plan, by Ship Type
Average
Figure 7. Annual Total Shipbuilding Costs Under the Navy’s 2024 Plan, as Estimated by CBO and the Navy
CBO’s Estimate of the Navy’s Total Budget Under Its 2024 Plan
Figure 8.
Measures
Figure 9. of Naval Capability Under the Navy’s 2024 Plan
Submarine
Figure 10. Classes in Production, by Time Period, and Submarine Construction, by Tonnage, Under the Navy’s 202
Cost Growth
Box 1. in Lead Ships, 1985 to 2024
U.S. Attack Submarine Force Under AUKUS
Box 2.
Large and Midsize Amphibious Warfare Ships Under the Navy’s 2024 Plan
024 Shipbuilding Plan.
This file presents the data from the tables and figures in CBO's October 2023 report An Analysis of the Navy’s Fiscal Year 2024 Shipbuilding Plan.
www.cbo.gov/publication/59508

Table 1.
Emphasis and Cost of the Alternatives in the Navy’s 2024 Plan, as Assessed by CBO

Alternative 1 Alternative 2 Alternative 3


The Navy would buy more large The Navy would place the most The Navy would buy more of all
surface combatants and fewer emphasis on undersea warfare by types of ships (and many more
attack submarines than under buying more submarines than under support ships), except for
Alternative 2 but would buy more the other alternatives. It would buy submarines, than under the other
next-generation variants of those fewer next-generation submarines alternatives. Like Alternative 1, this
ships. It would buy the fewest large and more submarines of existing alternative emphasizes moving to
Emphasis amphibious ships but would build classes. It would buy more large the next generation of major
small amphibious ships faster than amphibious ships than under combatants.
under Alternative 2. Alternative 1 and fewer small ships
than under Alternatives 1 or 3.

Features common to all Under all alternatives, the Navy would seek to maintain a balanced fleet with proportionate mixtures of large
three alternatives and small combatants. A large carrier force would be maintained under each alternative, and the same number
of ballistic missile submarines would be purchased.

Average annual cost of all


shipbuilding activities 33.8 33.6 36.1
(billions of 2023 dollars)

Back to Table of Contents


This file presents the data from the tables and figures in CBO's October 2023 report An Analysis of the Navy’s Fiscal Year 2024 Shipbuilding Plan.
www.cbo.gov/publication/59508

Table 2.
Difference Between the Number of Ships in Today’s Fleet and the Number in 2045
Under the Navy’s 2024 Plan
Number of ships

Difference from 2023 fleet

Fleet composition as
of October 1, 2023 Alternative 1 Alternative 2 Alternative 3
Combat ships
Aircraft carriers 11 -1 -1 0
Ballistic missile submarines 14 -2 -2 -2
Attack, guided missile, and large payload submarines 52 3 9 6
Large surface ships
Large surface combatants 87 -9 -13 -6
Large and midsize amphibious warfare ships 31 -8 -9 -5
Subtotal, large surface ships 118 -17 -22 -11
Small surface ships
Small surface combatants and mine countermeasures ships 31 13 15 18
Medium landing ships 0 25 19 33
Subtotal, small surface ships 31 38 34 51
Subtotal, combat ships 226 21 18 44
Combat logistics and support ships
Combat logistics 30 13 21 20
Support 34 -1 -2 11
Subtotal, combat logistics and support ships 64 12 19 31
Total, battle force ships 290 33 37 75

Back to Table of Contents


This file presents the data from the tables and figures in CBO's October 2023 report An Analysis of the Navy’s Fiscal Year 2024 Shipbuilding Plan.
www.cbo.gov/publication/59508

Table 3.
Comparison of Ship Purchases and Estimated Costs in the Navy’s Fiscal Year 2023 and Fiscal Year 2024 Shipbuilding Plans

2023 plan (2023–2052) 2024 plan (2024–2053)

Alternative 1 Alternative 2 Alternative 3 Alternative 1 Alternative 2 Alternative 3


Number of battle force ships purchased over 30 years
Combat ships
Aircraft carriers 5 5 7 6 6 7
Ballistic missile submarines 11 11 11 11 11 11
Large payload submarines 4 6 4 4 6 4
Attack submarines
Virginia class submarines with the Virginia payload module 23 33 27 11 11 11
Virginia class submarines 0 16 0 10 37 12
SSN(X) next-generation attack submarines 31 17 33 33 18 35
Subtotal 54 66 60 54 66 58
Large surface combatants
DDG-51 Flight III destroyers 16 18 17 18 20 18
DDG(X) next-generation surface combatants 38 29 47 38 30 46
Subtotal 54 47 64 56 50 64
Small surface combatants
FFG-62 frigates 17 11 17 16 10 16
FFG-62 Flight II frigates 35 44 40 37 46 42
Subtotal 52 55 57 53 56 58
Large and midsize amphibious warfare ships
LHA-6 amphibious assault ships 5 5 4 6 5 4
LPD-17 Flight II 1 1 1 0 0 0
LPD(X) next-generation amphibious ships 4 7 9 5 7 10
Subtotal 10 13 14 11 12 14
Medium landing ships 40 34 49 42 36 51
Subtotal, combat ships 230 237 266 237 243 267
Combat logistics and support ships 52 57 74 53 56 73
Total 282 294 340 290 299 340
Costs of new-ship construction (billions of 2023 dollars)
Total cost over 30 years
Navy’s estimate 710 718 786 776 792 842
CBO’s estimate 825 859 908 910 906 979
Average annual cost
Navy’s estimate 23.7 23.9 26.2 25.9 26.4 28.1
CBO’s estimate 27.5 28.6 30.3 30.3 30.2 32.6
Average cost per ship
Navy’s estimate 2.5 2.4 2.3 2.7 2.6 2.5
CBO’s estimate 2.9 3.0 2.7 3.1 3.1 2.9
Addendum:
Average annual costs of all activities typically funded from budget
accounts for ship construction
Navy’s estimate 26.8 27.1 29.5 29.1 29.6 31.4
CBO’s estimate 30.7 31.9 33.7 33.8 33.6 36.1

Back to Table of Contents


This file presents the data from the tables and figures in CBO's October 2023 report An Analysis of the Navy’s Fiscal Year 2024 Shipbuilding Plan.
www.cbo.gov/publication/59508

Table 4.
The Navy’s Inventory Goals, 2016 to 2022
Number of platforms

Future Naval Forces


2020 Future Naval 2020 integrated force Study Future Fleet
2016 force Forces Study, as 2022 structure assessment, Architecture, as Addendum: fleet
structure reported in the shipbuilding as reported in the 2023 reported in the 2023 composition as of
assessment December 2020 plan plan plan plan October 1, 2023
Combat ships
Aircraft carriers 12 8 to 11 9 to 11 12 8 to 11 11
Light carriers n.a. 0 to 6 n.a. 0 0 to 6 0
Submarines
Ballistic missile 12 12 12 12 12 14
Attack, guided missile, and large payload 66 72 to 78 66 to 72 66 58 to 70 52
Large surface combatants 104 73 to 88 63 to 65 96 72 to 80 87
Small surface combatants and mine countermeasures ships 52 60 to 67 40 to 45 56 47 to 60 31
Large and midsize amphibious warfare ships
LHAs and LHDs 9 to 10 8 to 9 10 6 to 10 9
38
LPDs and LSDs 16 to 19 22
52 to 57 41 30 to 43
Medium landing ships 0 24 to 35 0
Subtotal, combat ships 284 286 to 329 238 to 268 293 233 to 292 226
Combat logistics and support ships
Combat logistics 32 69 to 87 56 to 75 45 51 to 85 30
Support 39 27 to 30 27 to 29 52 27 to 51 34
Subtotal, combat logistics and support ships 71 96 to 117 83 to 104 97 78 to 136 64
Total, manned battle force ships 355 382 to 446 321 to 372 390 337 to 404 290
Unmanned vessels
Surface n.a. 119 to 166 59 to 89 27 81 to 153 0
Undersea n.a. 24 to 76 18 to 51 18 18 to 50 0
Total, unmanned vessels n.a. 143 to 242 77 to 140 45 99 to 203 0
Total, manned battle force ships and unmanned vessels 355 525 to 688 398 to 512 435 440 to 540 290
Addendum:
Time frame to achieve the force structure objective After 2030 2045 2045 After 2030 2045 n.a.

Back to Table of Contents


This file presents the data from the tables and figures in CBO's October 2023 report An Analysis of the Navy’s Fiscal Year 2024 Shipbuilding Plan.
www.cbo.gov/publication/59508

Table 5.
The Composition of the Fleet in 2045 Under the 2024 Plan Compared With the Navy’s
Most Recent Shipbuilding Goals

Navy’s 2024 shipbuilding plan

Chief of Naval
Navy’s 2022 Operations’
shipbuilding plan, Navigation Plan
June 2021 2022, July 2022 Alternative 1 Alternative 2 Alternative 3
Combat ships
Aircraft carriers 9 to 11 12 10 10 11
Submarines
Ballistic missile 12 12 12 12 12
Attack, guided missile, and large payload 66 to 72 66 55 61 58
Large surface combatants 63 to 65 96 78 74 81
Small surface combatants and mine countermeasures ships 40 to 45 56 44 46 49
Large and midsize amphibious warfare ships
LHAs and LHDs 8 to 9 10 8 7 9
LPDs and LSDs 16 to 19 21 15 15 17
Medium landing ships 24 to 35 18 25 19 33
Subtotal, combat ships 238 to 268 291 247 244 271
Combat logistics and support ships
Combat logistics 56 to 75 46 43 51 50
Support 27 to 29 36 28 32 45
Subtotal, combat logistics and support ships 83 to 104 82 71 83 95
Total, battle force ships 321 to 372 373 323 327 365
Addendum:
Time frame to achieve the force structure objective 2045 2045 n.a. n.a. n.a.

Back to Table of Contents


This file presents the data from the tables and figures in CBO's October 2023 report An Analysis of the Navy’s Fiscal Year 2024 Shipbuilding Plan.
www.cbo.gov/publication/59508

Table 6.
Cost Overruns and Unit Cost Growth for Selected Navy Shipbuilding Programs

Programs requiring prior-year shipbuilding funding in the 2024 Future Years Defense Plan to complete ships authorized and appropriated before 2024
Cost overrun (millions of 2023 dollars)
Gerald R. Ford class CVN-78 aircraft carrier 582
Nimitz class CVN-68 aircraft carrier nuclear refueling and overhaul 194
Virginia class SSN-774 attack submarine 857
Arleigh Burke class DDG-51 guided missile destroyer 696
Freedom class LCS-1 littoral combat ship 21
San Antonio class LPD-17 amphibious transport dock 55
America class LHA-6 amphibious assault ship 65
John Lewis class T-AO-205 oiler 155
Najavo T-ATS-6 towing, salvage, and rescue ship 10
T-AGOS SURTASS ship 323
LCAC ship-to-shore connector 100

Programs experiencing substantial growth in their unit prices in the 2024 Future Years Defense Plan over the past five years, after adjusting for inflation

Unit cost growth (percent)


Nimitz class CVN-68 aircraft carrier nuclear refueling and overhaul 15
Virginia class SSN-774 attack submarine 15
John Lewis class T-AO-205 oiler 38
Najavo T-ATS-6 towing, salvage, and rescue ship 22
LCU-1700 utility landing craft 33

Back to Table of Contents


This file presents the data from the tables and figures in CBO's October 2023 report An Analysis of the Navy’s Fiscal Year 2024 Shipbuilding Plan.
www.cbo.gov/publication/59508

Table 7.
Average Annual Total Shipbuilding Costs Under the Navy’s 2024 Plan

Near term (2024– Midterm (2034– Far term (2044– All three decades (2024–
2033) 2043) 2053) 2053)
Navy’s estimates (billions of 2023 dollars)
Alternative 1 30.1 26.2 31.0 29.1
Alternative 2 30.1 28.4 30.5 29.6
Alternative 3 31.5 31.2 31.3 31.4
CBO’s estimates (billions of 2023 dollars)
Alternative 1 33.1 30.9 37.3 33.8
Alternative 2 32.8 31.7 36.3 33.6
Alternative 3 34.6 36.3 37.6 36.1
Difference between the Navy’s and CBO’s estimates (percent)
Alternative 1 10 18 20 16
Alternative 2 9 12 19 13
Alternative 3 10 16 20 15

Back to Table of Contents


This file presents the data from the tables and figures in CBO's October 2023 report An Analysis of the Navy’s Fiscal Year 2024 Shipbuilding Plan.
www.cbo.gov/publication/59508

Table 8.
Comparison of the Navy’s and CBO’s Estimates of the Construction Costs of Major New Ships Under the Navy’s 2024 Plan
Billion of 2023 dollars

Total costs per class over the Average costs per ship over the
2024–2053 period 2024–2053 period
Number of ships Navy’s CBO’s Navy’s
Ship class purchased estimates estimates estimates CBO’s estimates
Alternative 1
CVN-78 Gerald R. Ford class aircraft carriers 6 100 99 17.0 16.6
SSBN-826 Columbia class ballistic missile submarines 11 79 100 7.7 9.2
Large payload submarines 4 30 37 7.7 9.3
SSN-774 Virginia class attack submarines with VPMs 11 43 47 3.9 4.3
SSN-774 Virginia class attack submarines 10 40 41 3.9 4.1
SSN(X) next-generation attack submarines 33 222 256 6.7 7.8
DDG-51 Flight III Arleigh Burke class destroyers 18 38 39 2.1 2.2
DDG(X) next-generation destroyers 38 93 130 2.5 3.4
FFG-62 Constellation class frigates 16 16 19 1.0 1.2
FFG-62 Flight II frigates 37 36 45 1.0 1.2
LHA-6 America class amphibious assault ships 6 27 30 4.3 4.7
LPD(X) next-generation amphibious ships 5 12 13 2.3 2.7
LSM medium landing ships 42 8 11 0.2 0.3
T-AO-205 John Lewis class oilers 11 8 9 0.8 0.8
T-AOL next-generation logistics ships 20 7 10 0.4 0.5
T-AKE(X) replenishment ships 12 9 12 0.8 1.0
Alternative 2
CVN-78 Gerald R. Ford class aircraft carriers 6 99 99 17.0 16.6
SSBN-826 Columbia class ballistic missile submarines 11 79 100 7.7 9.2
Large payload submarines 6 44 53 7.6 8.8
SSN-774 Virginia class attack submarines with VPMs 11 43 47 4.0 4.3
SSN-774 Virginia class attack submarines 37 150 151 4.0 4.1
SSN(X) next-generation attack submarines 18 126 143 7.0 8.0
DDG-51 Flight III Arleigh Burke class destroyers 20 44 45 2.2 2.2
DDG(X) next-generation destroyers 30 76 106 2.5 3.5
FFG-62 Constellation class frigates 10 10 14 1.0 1.2
FFG-62 Flight II frigates 46 44 54 1.0 1.2
LHA-6 America class amphibious assault ships 5 23 26 4.3 4.8
LPD(X) next-generation amphibious ships 7 15 18 2.2 2.6
LSM medium landing ships 36 7 9 0.2 0.3
T-AO-205 John Lewis class oilers 12 9 10 0.8 0.8
T-AOL next-generation logistics ships 26 10 12 0.4 0.5
T-AKE(X) replenishment ships 11 8 12 0.8 1.1
Alternative 3
CVN-78 Gerald R. Ford class aircraft carriers 7 113 106 16.0 15.7
SSBN-826 Columbia class ballistic missile submarines 11 79 100 7.7 9.2
Large payload submarines 4 31 34 7.7 9.0
SSN-774 Virginia class attack submarines with VPMs 11 43 47 4.0 4.3
SSN-774 Virginia class attack submarines 12 48 47 4.0 4.0
SSN(X) next-generation attack submarines 35 235 268 6.7 7.7
DDG-51 Flight III Arleigh Burke class destroyers 18 38 39 2.1 2.2
DDG(X) next-generation destroyers 46 109 149 2.4 3.2
FFG-62 Constellation class frigates 16 16 18 1.0 1.1
FFG-62 Flight II frigates 42 41 50 1.0 1.2
LHA-6 America class amphibious assault ships 4 18 20 4.1 4.4
LPD(X) next-generation amphibious ships 10 22 25 2.2 2.5
LSM medium landing ships 51 10 13 0.2 0.3
T-AO-205 John Lewis class oilers 12 9 9 0.8 0.8
T-AOL next-generation logistics ships 24 9 12 0.4 0.5
T-AKE(X) replenishment ships 12 9 12 0.8 1.0

Back to Table of Contents


This file presents the data from the tables and figures in CBO's October 2023 report An Analysis of the Navy’s Fiscal Year 2024 Shipbuilding Plan.
www.cbo.gov/publication/59508

Figure 1.
Annual Inventories of Battle Force Ships Under the Navy’s 2024 Plan
Number of ships

Year Alternative 1 Alternative 2 Alternative 3


2023 290 290 290
2024 293 293 293
2025 286 286 286
2026 285 285 285
2027 285 285 285
2028 291 291 291
2029 295 295 295
2030 290 290 290
2031 293 293 293
2032 304 303 305
2033 305 303 307
2034 308 307 313
2035 312 311 320
2036 319 318 329
2037 324 324 337
2038 327 325 340
2039 331 331 349
2040 331 329 352
2041 330 328 354
2042 330 329 356
2043 326 326 357
2044 326 328 360
2045 323 327 365
2046 322 327 364
2047 320 324 362
2048 318 323 360
2049 314 319 360
2050 315 322 361
2051 318 324 365
2052 319 327 365
2053 319 328 367

Back to Table of Contents


This file presents the data from the tables and figures in CBO's October 2023 report An Analysis of the Navy’s Fisc
www.cbo.gov/publication/59508

Figure 2.
Requested and Appropriated Shipbuilding
Budgets, 2014 to 2023
Billions of dollars

President's Appropriated
Year request funds
2014 14.3 15.5
2015 14.4 16.0
2016 16.6 18.7
2017 18.4 21.2
2018 20.4 23.8
2019 21.9 24.2
2020 23.8 24.0
2021 19.9 23.3
2022 22.5 26.6
2023 27.9 32.0
2024 32.8

Back to Table of Contents


Analysis of the Navy’s Fiscal Year 2024 Shipbuilding Plan.
This file presents the data from the tables and figures in CBO's October 2023 report An Analysis of the Navy’s Fiscal Year 2024 Shipbuilding Plan.
www.cbo.gov/publication/59508

Figure 3.
Inventories of Selected Categories of Ships Under the Navy’s 2024 Plan

Aircraft carriers Attack submarines Large surface combatants Small surface combatants Amphibious warfare ships Combat logistics and support ships
Gerald R. Ford Virginia class Improved Los DDG-51 Flight DDG-51 Flight LHA and LHD LSD-41 and LPD-17 Flight I LPD-17
Year Plan class Nimitz class SSN(X) with VPM Virginia class Seawolf class Angeles class DDG(X) III DDG-1000 I, II, IIA CG-47 FFG-62 Flight II FFG-62 Littoral combat class LSD-49 and Flight II replacements Medium landing Large logistics Small logistics Large support Small support
2023 Today's Fleet 1 10 0 0 21 3 24 0 0 1 73 13 0 0 23 9 10 12 0 0 30 0 12 22
2033 Alt 1 4 7 0 10 30 1 8 0 23 3 50 0 0 11 21 9 4 16 0 10 33 5 14 34
2033 Alt 2 4 7 0 10 30 1 8 0 23 3 50 0 0 11 21 9 4 16 0 8 33 6 14 33
2033 Alt 3 4 7 0 10 30 1 8 0 23 3 50 0 0 14 21 9 4 16 0 10 33 5 14 36
2043 Alt 1 6 4 1 20 32 0 0 9 35 3 35 0 7 20 16 8 0 16 0 25 32 11 12 22
2043 Alt 2 6 4 1 20 36 0 0 5 36 3 35 0 14 14 16 7 0 16 0 19 33 16 12 21
2043 Alt 3 6 4 1 20 34 0 0 11 35 3 35 0 12 20 16 8 0 17 0 32 33 15 13 32
2053 Alt 1 8 1 20 20 20 0 0 27 35 3 13 0 27 17 0 9 0 8 2 26 32 11 9 17
2053 Alt 2 8 1 11 20 38 0 0 20 37 3 13 0 36 11 0 8 0 8 4 22 32 15 9 16
2053 Alt 3 9 1 21 20 22 0 0 34 35 3 13 0 32 17 0 8 0 9 6 36 33 15 10 29

Back to Table of Contents


This file presents the data from the tables and figures in CBO's October 2023 report An Analysis of the Navy’s Fisca
www.cbo.gov/publication/59508

Figure 4.
Purchases of Selected Categories of Ships Under the Navy’s 2024 Plan

Aircraft carriers Ballistic missile, attack, and large payload submarines

Gerald R. Virginia class Large


Years Plan Ford class SSN(X) with VPM Virginia class payload
2024–2033 Alt 1 2 0 11 6 0
2024–2033 Alt 2 2 0 11 8 0
2024–2033 Alt 3 2 0 11 7 0
2034–2043 Alt 1 2 14 0 4 1
2034–2043 Alt 2 2 8 0 16 3
2034–2043 Alt 3 2 15 0 5 2
2044–2053 Alt 1 2 19 0 0 3
2044–2053 Alt 2 2 10 0 13 3
2044–2053 Alt 3 3 20 0 0 2
2024–2053 Alt 1 6 33 11 10 4
2024–2053 Alt 2 6 18 11 37 6
2024–2053 Alt 3 7 35 11 12 4

Back to Table of Contents


sis of the Navy’s Fiscal Year 2024 Shipbuilding Plan.

oad submarines Large surface combatants Small surface combatants Amphibious warfare ships

Ballistic DDG-51 FFG-62 Flight


missile DDG(X) Flight III II FFG-62 LHA
9 2 18 0 14 2
9 2 16 4 10 1
9 2 18 2 16 2
2 18 0 17 2 2
2 11 4 22 0 2
2 24 0 20 0 2
0 18 0 20 0 2
0 17 0 20 0 2
0 20 0 20 0 0
11 38 18 37 16 6
11 30 20 46 10 5
11 46 18 42 16 4
Amphibious warfare ships Combat logistics and support ships

LPD-17 Flight
II and LPD-17 Medium Large Small
replacements landing logistics logistics Large support Small support
0 16 11 8 2 6
0 14 11 10 2 5
0 16 11 9 3 12
1 9 1 3 0 0
2 6 3 6 0 0
5 17 3 6 0 5
4 17 11 9 0 2
5 16 9 10 0 0
5 18 10 9 0 5
5 42 23 20 2 8
7 36 23 26 2 5
10 51 24 24 3 22
This file presents the data from the tables and figures in CBO's October 2023 report An Analysis of the Navy’s Fiscal Year 2024 Shipbuilding Plan.
www.cbo.gov/publication/59508

Figure 5.
The Navy’s Estimates of Average Annual Costs of New-Ship Construction Under Its 2024 Plan, by Ship Type
Billions of 2023 dollars

Large and midsize


Combat logistics and Medium landing amphibious warfare Small surface Large surface Attack and large Ballistic missile
Total support ships ships ships combatants combatants payload submarines submarines Aircraft carriers
Alternative 1 25.9 1.0 0.3 1.3 1.7 4.4 11.2 2.6 3.3
Alternative 2 26.4 1.1 0.3 1.3 1.8 4.0 12.1 2.6 3.3
Alternative 3 28.1 1.3 0.3 1.3 1.9 4.9 11.9 2.6 3.8

Back to Table of Contents


This file presents the data from the tables and figures in CBO's October 2023 report An Analysis of the Navy’s Fisca
www.cbo.gov/publication/59508

Figure 6.
Average Annual Total Shipbuilding Costs Under the Navy’s 2024 Plan, as Estimated by CBO and the Navy
Billions of 2023 dollars

Combat logistics
Source Total Other items and support ships
Alternative 1 Navy 29.1 2.2 1.0
Alternative 1 CBO 33.8 2.2 1.3
Alternative 2 Navy 29.6 2.0 1.1
Alternative 2 CBO 33.6 2.2 1.4
Alternative 3 Navy 31.4 2.1 1.3
Alternative 3 CBO 36.1 2.3 1.7

Back to Table of Contents


port An Analysis of the Navy’s Fiscal Year 2024 Shipbuilding Plan.

Estimated by CBO and the Navy

Attack and large


Amphibious Surface payload Ballistic missile
warfare ships combatants submarines submarines Aircraft carriers
1.5 6.1 11.2 2.6 4.5
1.8 7.8 12.7 3.3 4.5
1.5 5.8 12.1 2.6 4.5
1.8 7.2 13.2 3.3 4.5
1.6 6.8 11.9 2.6 5.0
1.9 8.6 13.3 3.3 5.0
This file presents the data from the tables and figures in CBO's October 2023 report An Analysis of the Navy’s Fisca
www.cbo.gov/publication/59508

Figure 7.
CBO’s Estimate of the Navy’s Total Budget Under Its 2024 Plan
Billions of 2023 dollars

Year Alternative 1 Alternative 2 Alternative 3


2023 245 245 245
2024 249 249 249
2025 246 246 246
2026 248 248 248
2027 244 244 244
2028 247 247 247
2029 247 248 248
2030 242 246 248
2031 245 244 249
2032 255 252 254
2033 254 250 262
2034 262 267 279
2035 278 272 280
2036 279 279 283
2037 273 274 280
2038 280 283 294
2039 284 280 301
2040 288 280 301
2041 287 294 296
2042 294 299 307
2043 287 281 294
2044 287 289 295
2045 292 284 300
2046 299 297 311
2047 296 306 317
2048 313 308 317
2049 300 295 313
2050 307 302 322
2051 315 310 325
2052 324 325 324
2053 320 313 329

Back to Table of Contents


sis of the Navy’s Fiscal Year 2024 Shipbuilding Plan.
This file presents the data from the tables and figures in CBO's October 2023 report An Analysis of the Navy’s Fiscal Year 2024 Shipbuilding Plan.
www.cbo.gov/publication/59508

Figure 8.
Measures of Naval Capability Under the Navy’s 2024 Plan

Ships and submarines capable of launching antiship or


Total missile cells land-attack missiles Surface ship missile cells Submarine missile cells Torpedo room capacity on attack submarines Targets engaged by carrier force per day
Year Alternative 1 Alternative 2 Alternative 3 Alternative 1 Alternative 2 Alternative 3 Alternative 1 Alternative 2 Alternative 3 Alternative 1 Alternative 2 Alternative 3 Alternative 1 Alternative 2 Alternative 3 Alternative 1 Alternative 2 Alternative 3
2023 9,686 9,686 9,686 141 141 141 8,506 8,506 8,506 1,180 1,180 1,180 1,325 1,325 1,325 6,240 6,240 6,240
2024 9,348 9,348 9,348 139 139 139 8,168 8,168 8,168 1,180 1,180 1,180 1,325 1,325 1,325 6,240 6,240 6,240
2025 9,162 9,162 9,162 137 137 137 7,994 7,994 7,994 1,168 1,168 1,168 1,300 1,300 1,300 6,880 6,880 6,880
2026 8,700 8,700 8,700 134 134 134 7,852 7,852 7,852 848 848 848 1,275 1,275 1,275 6,320 6,320 6,320
2027 8,856 8,856 8,856 137 137 137 8,008 8,008 8,008 848 848 848 1,275 1,275 1,275 5,760 5,760 5,760
2028 8,612 8,612 8,612 136 136 136 8,084 8,084 8,084 528 528 528 1,250 1,250 1,250 6,400 6,400 6,400
2029 8,962 8,962 8,962 142 142 142 8,326 8,326 8,326 636 636 636 1,250 1,250 1,250 6,400 6,400 6,400
2030 8,572 8,572 8,572 138 138 138 7,920 7,920 7,920 652 652 652 1,175 1,175 1,175 6,400 6,400 6,400
2031 8,548 8,548 8,548 141 141 141 7,828 7,828 7,828 720 720 720 1,200 1,200 1,200 6,400 6,400 6,400
2032 8,820 8,852 8,820 148 149 149 7,980 8,012 8,012 840 840 840 1,275 1,275 1,275 6,480 6,480 6,480
2033 8,854 8,918 8,854 149 151 151 7,998 8,062 8,062 856 856 856 1,250 1,250 1,250 6,480 6,480 6,480
2034 9,164 9,292 9,196 155 159 159 8,240 8,368 8,368 924 924 924 1,275 1,275 1,275 6,480 6,480 6,480
2035 9,712 9,872 9,776 162 167 168 8,720 8,880 8,912 992 992 992 1,250 1,250 1,250 6,480 6,480 6,480
2036 10,160 10,256 10,256 171 176 179 9,008 9,104 9,264 1,152 1,152 1,152 1,350 1,350 1,350 6,480 6,480 6,480
2037 10,432 10,572 10,560 177 184 187 9,200 9,328 9,520 1,232 1,244 1,232 1,400 1,425 1,400 6,560 6,560 6,560
2038 10,716 10,772 10,748 180 187 190 9,520 9,552 9,776 1,196 1,220 1,196 1,325 1,375 1,325 6,560 6,560 6,560
2039 10,920 11,104 11,080 185 194 198 9,712 9,872 10,128 1,208 1,232 1,208 1,350 1,400 1,350 6,560 6,560 6,560
2040 10,940 11,060 11,208 187 196 203 9,744 9,840 10,288 1,196 1,220 1,208 1,325 1,375 1,350 6,000 6,000 6,000
2041 10,864 11,016 11,132 188 198 205 9,680 9,808 10,256 1,184 1,208 1,196 1,300 1,350 1,325 6,000 6,000 6,640
2042 10,908 11,040 11,188 192 204 211 9,712 9,808 10,320 1,196 1,232 1,220 1,350 1,425 1,400 6,080 6,080 6,080
2043 10,940 11,116 11,316 195 209 216 9,744 9,872 10,480 1,196 1,244 1,220 1,350 1,450 1,400 6,080 6,080 6,080
2044 10,888 11,240 11,264 198 215 220 9,680 9,872 10,448 1,208 1,368 1,232 1,425 1,500 1,475 6,080 6,080 6,080
2045 10,836 11,136 11,420 201 219 226 9,616 9,744 10,512 1,220 1,392 1,356 1,500 1,575 1,550 6,080 6,080 6,720
2046 10,976 11,340 11,560 206 226 232 9,744 9,936 10,672 1,232 1,404 1,368 1,575 1,625 1,625 5,520 5,520 6,160
2047 11,116 11,528 11,700 211 232 238 9,872 10,000 10,832 1,244 1,528 1,380 1,650 1,675 1,700 6,160 6,160 6,160
2048 11,224 11,680 11,808 215 238 243 9,968 10,128 10,960 1,256 1,552 1,392 1,725 1,750 1,775 5,600 5,600 5,600
2049 11,208 11,608 11,996 216 241 248 9,840 10,032 11,056 1,368 1,576 1,516 1,750 1,825 1,850 5,600 5,600 6,240
2050 11,240 11,784 12,028 217 244 250 9,872 10,096 11,120 1,368 1,688 1,516 1,800 1,850 1,900 5,600 5,600 6,240
2051 11,240 11,816 12,124 217 245 252 9,872 10,128 11,248 1,368 1,688 1,516 1,850 1,875 1,950 5,600 5,600 6,240
2052 11,408 11,884 12,276 221 249 256 9,904 10,160 11,376 1,504 1,724 1,540 1,950 1,975 2,050 6,240 6,240 6,240
2053 11,632 12,220 12,612 224 253 260 10,128 10,384 11,600 1,504 1,836 1,652 2,000 2,000 2,100 5,680 5,680 6,320

Back to Table of Contents


This file presents the data from the tables and figures in CBO's October 2023 report An Analysis of the Navy’s Fiscal Year 2024 Shipbuilding Plan.
www.cbo.gov/publication/59508

Figure 9.
Submarine Classes in Production, by Time Period, and Submarine Construction, by Tonnage, Under the Navy’s 2024 Plan

Alternative 1 Alternative 2 Alternative 3 Average Annual Submarine Construction, by Tonnage

Virginia class
Columbia class attack Columbia class Virginia class Columbia class Virginia class
ballistic missile Large payload submarines Virginia class ballistic missile Large payload attack submarines Virginia class ballistic missile Large payload attack submarines Virginia class attack 2014 to 2034 to 2044 to 2024 to
Year submarines submarines with VPM attack submarines SSN(X) submarines submarines with VPM attack submarines SSN(X) submarines submarines with VPM submarines SSN(X) 2023 2024 to 2033 2043 2053 2053
2023 TRUE 1 TRUE TRUE 1 TRUE TRUE 1 TRUE 15.8
2024 TRUE 1 TRUE TRUE 1 TRUE TRUE 1 TRUE Alternative 1 25.2 18.0 19.7 21.0
2025 TRUE 1 TRUE TRUE 1 TRUE TRUE 1 TRUE Alternative 2 26.4 23.1 20.1 23.2
2026 TRUE 1 TRUE TRUE 1 TRUE TRUE 1 TRUE Alternative 3 25.8 20.9 19.1 21.9
2027 TRUE 1 TRUE TRUE 1 TRUE TRUE 1 TRUE
2028 TRUE 1 TRUE TRUE 1 TRUE TRUE 1 TRUE
2029 TRUE 1 TRUE TRUE 1 TRUE TRUE 1 TRUE
2030 TRUE 1 TRUE TRUE 1 TRUE TRUE 1 TRUE
2031 TRUE 1 TRUE TRUE 1 TRUE TRUE 1 TRUE
2032 TRUE 1 TRUE TRUE 1 TRUE TRUE 1 TRUE
2033 TRUE 1 1 TRUE TRUE 1 1 TRUE TRUE 1 1 TRUE
2034 TRUE 1 1 TRUE TRUE 1 1 TRUE TRUE 1 1 TRUE
2035 TRUE 1 1 TRUE 1 1 1 1 TRUE TRUE 1 1 TRUE
2036 TRUE 1 1 TRUE 1 1 1 1 TRUE 1 1 1 1 TRUE
2037 TRUE 1 1 TRUE 1 1 1 1 TRUE 1 1 1 1 TRUE
2038 TRUE 1 TRUE 1 TRUE 1 TRUE 1 TRUE 1 TRUE
2039 TRUE 1 TRUE 1 TRUE 1 TRUE 1 TRUE 1 TRUE
2040 1 TRUE 1 TRUE 1 TRUE 1 TRUE 1 TRUE 1 TRUE
2041 1 TRUE 1 TRUE 1 TRUE 1 TRUE 1 TRUE 1 TRUE
2042 1 TRUE 1 TRUE 1 TRUE 1 TRUE 1 TRUE 1 TRUE
2043 1 TRUE 1 TRUE 1 TRUE 1 TRUE 1 TRUE 1 TRUE
2044 TRUE 1 TRUE TRUE 1 TRUE TRUE 1 TRUE
2045 TRUE TRUE TRUE 1 TRUE TRUE TRUE
2046 TRUE TRUE TRUE 1 TRUE TRUE TRUE
2047 TRUE TRUE TRUE 1 TRUE TRUE TRUE
2048 TRUE TRUE TRUE 1 TRUE TRUE TRUE
2049 TRUE TRUE TRUE 1 TRUE TRUE TRUE
2050 TRUE TRUE TRUE 1 TRUE TRUE TRUE
2051 TRUE TRUE TRUE 1 TRUE TRUE TRUE
2052 TRUE TRUE TRUE 1 TRUE TRUE TRUE
2053 TRUE TRUE TRUE 1 TRUE TRUE TRUE

Back to Table of Contents


This file presents the data from the tables and figures in CBO's October 2023 report An Analysis of the Navy’s Fiscal Year 2024 Shipbuilding Plan.
www.cbo.gov/publication/59508

Figure 10.
Cost Growth in Lead Ships, 1985 to 2024
Percent

Group Ship Cost growth


Aircraft carriers CVN-78 27
Submarines SSBN-826 5
Submarines SSN-774 11
Submarines SSN-775 25
Large surface combatants DDG-51 10
Large surface combatants DDG-1000 44
Large surface combatants MHC-51 41
Small surface combatants LCS-1 149
Small surface combatants LCS-2 155
Small surface combatants FFG-62 8
Amphibious warfare ships LPD-17 84
Amphibious warfare ships LHA-6 14
Combat logistics and support ships AOE-6 35
Combat logistics and support ships T-AKE-1 42
Combat logistics and support ships T-ESD -6
Combat logistics and support ships T-EPF 14
Combat logistics and support ships T-AO-205 16
Combat logistics and support ships T-ATS-6 15
Combat logistics and support ships T-AGOS 82

Average 40
Weighted average 25

Back to Table of Contents


This file presents the data from the tables and figures in CBO's October 2023 report An Analysis of the Navy’s Fiscal Year 2024 Shipbuilding Plan.
www.cbo.gov/publication/59508

Box 1.
U.S. Attack Submarine Force Under AUKUS
Number of ships

Alternative 1 in the Navy's 2024 shipbuilding


Year plan Scenario 1 Scenario 2 Scenario 3
2023 48 48 48 48
2024 50 50 50 50
2025 49 49 49 49
2026 48 48 48 48
2027 48 48 48 48
2028 47 47 47 47
2029 48 48 48 48
2030 46 46 46 46
2031 47 47 47 47
2032 50 49 49 49
2033 49 48 48 48
2034 50 49 49 48
2035 50 48 48 48
2036 54 52 52 52
2037 56 54 54 55
2038 53 50 50 52
2039 54 51 51 53
2040 53 50 50 53
2041 52 49 48 51
2042 53 50 49 53
2043 53 50 49 53
2044 54 51 49 53
2045 55 52 50 54
2046 56 53 51 55
2047 57 54 52 56
2048 58 55 53 57
2049 58 55 53 57
2050 58 55 53 57
2051 58 55 53 57
2052 60 57 55 59
2053 60 58 56 60
2054 59 57 55 59
2055 61 59 57 61
2056 61 60 58 62
2057 62 61 59 63
2058 62 61 59 63
2059 62 61 59 63
2060 63 62 60 64

Back to Table of Contents


This file presents the data from the tables and figures in CBO's October 2023 report An Analysis of the Navy’s Fiscal Year 2024 Shipbuilding Plan.
www.cbo.gov/publication/59508

Box 2.
Large and Midsize Amphibious Warfare Ships Under the Navy’s 2024 Plan
Number of ships

Build more LHAs and LPDs and extend


Year Alternative 1 Alternative 2 Alternative3 the service life of some ships
2023 31 31 31 31
2024 29 29 29 31
2025 27 27 27 31
2026 28 28 28 31
2027 28 28 28 31
2028 29 29 29 32
2029 30 30 30 33
2030 30 30 30 32
2031 30 30 30 32
2032 29 29 29 31
2033 29 29 29 32
2034 29 29 29 32
2035 26 26 26 32
2036 25 25 25 30
2037 24 24 25 31
2038 24 23 24 30
2039 24 23 24 31
2040 24 23 24 31
2041 23 22 24 32
2042 24 23 24 32
2043 24 23 25 33
2044 24 23 25 33
2045 23 22 26 33
2046 23 22 27 33
2047 21 21 25 32
2048 21 21 25 31
2049 20 20 24 31
2050 20 21 24 31
2051 21 21 25 32
2052 19 20 23 31
2053 19 20 23 31

Back to Table of Contents