Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

Construction of community soakpit with chamber

SNo. Material Unit Qty Rate Amount Royalty Seigniorage


BRICKS
100A Nos 116 6099.50 ₹ 707.54 ₹ 5.22 ₹ 64.32
100B Nos 1127 5640.80 ₹ 6,357.18 ₹ 50.72 ₹ 577.93
1
CGST 3% ₹ 211.94
SGST 3% ₹ 211.94
CARRIAGE Nos 1243 902.2 ₹ 1,121.43
COARSE SAND Cum 1.02 193.38 ₹ 197.25 ₹ 76.50 ₹ 17.93
CGST 2.5% ₹ 4.93
2
SGST 2.5% ₹ 4.93
CARRIAGE Cum 1.02 661.90 ₹ 675.14
STONE CHIPS Cum 0.62 654.9 ₹ 406.04 ₹ 93.00 ₹ 36.91
CGST 2.5% ₹ 10.15
3
SGST 2.5% ₹ 10.15
CARRIAGE Cum 0.62 3051.81 ₹ 1,892.12
LOCAL SAND Cum 0.84 156.04 ₹ 131.07 ₹ 63.00 ₹ 11.92
CGST 2.5% ₹ 3.28
4
SGST 2.5% ₹ 3.28
CARRIAGE Cum 0.84 233.34 ₹ 196.01
CEMENT MT 0.71 4492 ₹ 3,169.56
CGST 14% ₹ 443.74
5
SGST 14% ₹ 443.74
CARRIAGE MT 0.71 285.23 ₹ 201.26
STEEL MT 0.035 58900 ₹ 2,061.50
CGST 9% ₹ 185.54
6
SGST 9% ₹ 185.54
CARRIAGE MT 0.035 285.23 ₹ 9.98
BRICK BATS Cum 1.95 987 ₹ 1,925.00
7 CGST 2.5% ₹ 48.13
SGST 2.5% ₹ 48.13
8 SHUTTERING Sqm 2.32 184 ₹ 427.51
9 UPVC PIPE m 5.00 589.5 ₹ 2,947.00
10 T-PIPE = ₹ 350.00
11 UPVC BEND = ₹ 300.00
Total A ₹ 24,891.00
GST ₹ 1,815.00
Seigniorage ₹ 709.00
Deductions
L-Cess ₹ 300.00
Royalty ₹ 288.00
Total A (Excluiding Deductions) ₹ 21,779.00
12 MASON Nos 3 369 ₹ 1,107.00
13 LABOUR Nos 13 306 ₹ 3,978.00
Total B ₹ 5,085.00
Total Amount ₹ 29,976.00

You might also like