Total No. of Questions—8] [Total No. of Printed Pages—2

t
sta
Seat

5
[5668]-102

7:5
No.

01 91
9:4
1/2 0
90
S.E. Civil (I Semester) EXAMINATION, 2019

8/1 13
BUILDING TECHNOLOGY AND MATERIALS
8 2 P0
(2015 PATTERN)
.23 G

Time : Two Hours Maximum Marks : 50


CE

N.B. :— (i) Answer Q. Nos. 1 or 2, 3 or 4, 5 or 6, 7 or 8.

8
23
(ii) Figures to the right indicate full marks.

ic-
16

tat
(iii) Assume suitable data, if necessary.
8.2

5s
.24

7:5
1. (a) State various components of Building. Explain step-by-step
91
49

9:4
procedure of plinth filling with sketch. [6]
30
90
(b) State the requirements of partition walls. Explain needle beam
01
01

method of underpinning. [6]


1/2
GP

Or
8/1

2. (a) Write short notes on : [6]


CE
82

8
(i) Flemish Bond

23
.23

ic-
(ii) Cantilever footing.
16

tat
8.2

(b) Draw the sketch of formwork for beam and slab. Explain composite 5s
.24

masonry. [6]
7:5
91
49

9:4
30

3. (a) State the functional requirements of flooring. Explain lean to


90

roof with sketch. [6]


01
01
1/2

(b) Draw the sketch of door and show on it : [6]


.23 G
P
8/1

(i) Frame
16 E
82

(ii) Hold fast


C

(iii) Horn
(iv) Lock rail.
8.2

P.T.O.
.24
49

https://www.sppuonline.com/
8
23
ic-
Or

t
sta
4. (a) Explain the following with sketches : [6]
(i) Canoid

5
7:5
(ii) Gable

01 91
9:4
(iii) Ridge cover

1/2 0
(b) Write short notes on : [6]

90
8/1 13
(i) Arch construction
8 2 P0
(ii) Bay window.
.23 G

5. (a) Plan a dog-legged stair for residential building with the following
CE

detail : [7]

8
23
(i) F/F-Height–3.60 m

ic-
16

(ii) The stair hall measures 2.50 m × 5.00 m.

tat
8.2

(b) Write short notes on : [6]

5s
.24

(i) Dots in plastering

7:5
(ii) Pointing. 91
49

9:4
Or
30
90
6. (a) Explain the following terms with sketches : [7]
01

(i) Riser
01
1/2

(ii) Pitch of stair


GP

(iii) Nosing
8/1

(iv) Scotia
CE
82

8
(v) Newel Post.

23
.23

(b) Explain the defects in plastering. [6]

ic-
16

tat
8.2

7. (a) Enlist engineering properties of : [6]


5s
.24

(i) Timber
7:5
91
49

(ii) Glass
9:4

(iii) Aluminium.
30
90

(b) State safety precautions to be taken for construction of high


01
01

rise building in crowded area. [7]


1/2

Or
.23 G
P
8/1

8. (a) Write short notes on : [7]


16 E

(i) Aluminium cladding


82
C

(ii) Ecofriendly materials.


(b) Explain the storage of materials at site. [6]