CRONOGRAMA VALORADO DE TRABAJOS

OBRA: VIVIENDA USO MULTIPLE SR. SERRANO

ITEM CODIGO DESCRIPCION UNIDAD CANTIDAD P.UNITARIO TOTAL Semana 1 Semana 2 Semana 3 Semana 4 Semana 5 Semana 6 Semana 7 (2DIAS)

OBRAS PRELIMINARES 0.00 68.25


516791 Limpieza manual de terreno m2 35.00 0.80 28.00 14.00 14

500343 Replanteo y nivelación m2 35.00 1.15 40.25 20.13 20.13


17.50 17.50
50.00 50.00
ESTRUCTURA 0.00 1,609.50
516784 Kg 620.00 1.60 992.00 330.67 330.67 330.67
Acero de refuerzo fy=4200
206.67 206.67 206.67
kg/cm2
33.33 33.33 33.33
516794 m3 4.60 130.00 598.00 199.33 199.33 199.33
H. Simple en vigas y losa f'c=210
1.53 1.53 1.53
kg/cm2 con encof
33.33 33.33 33.33
516754 m3 1.50 13.00 19.50 9.75 9.75
H. Simple en columnas f'c=210
0.75 0.75
kg/cm2
50.00 50.00
MAMPOSTERIA 0.00 571.60
516751 m2 22.00 12.10 266.20 88.73 88.73 88.73
Mampostería de bloque hueco
7.33 7.33 7.33
e=12 cm
33.33 33.33 33.34
516759 Empaste exterior e interior m2 50.00 3.38 169.00 169.00
50.00
100.00
516757 m2 22.00 6.20 136.40 136.40
Enlucido paleteado fino; incluye
22.00
filos
100.00
CONTRAPISOS 0.00 875.00
516760 m2 35.00 25.00 875.00 437.50 437.50
Contrapiso H.S. f'c=180 kg/cm2
30.00 30.00
e=7cm incl malla
50.00 50.00
RECUBRIMIENTO PISOS Y PARED 0.00 2,280.50
516761 Masillado y alisado de pisos m2 45.00 7.60 342.00 342.00
60.00
100.00
516752 M2 10.00 21.00 210.00 210.00
CERAMICA PARA PISOS 30x30cm 21.00
100.00
516762 m2 45.00 20.00 900.00 450.00 450.00
CERAMICA PARA PARED de
22.50 22.50
20x30cm
50.00 50.00

This document was created by an application that isn’t licensed to use novaPDF.
Purchase a license to generate PDF files without this notice.
516763 PISOS DE MDF m2 25.00 26.70 667.50 222.50 222.50 222.50
8.33 8.33 8.33
33.33 33.33 33.33
516764 Porcelanato antideslizante m2 3.20 31.00 99.20 49.60 49.60
1.60 1.60
50.00 50.00
516765 BARREDERA DE MDF ML 30.00 2.06 61.80 30.90 30.90
1.03 1.03
50.00 50.00
ENLUCIDOS 0.00 590.63
516766 m2 45.00 9.28 417.60 208.80 208.80
Enlucido vertical(pasteado)incluye 45.00 45.00
filos 50.00 50.00
516767 Cerámica en meson de cocina m2 8.20 21.10 173.03 86.51 86.51
4.10 4.10
33.33 33.33
CARPINTERIA METAL MADERA 0.00 1,504.52
516769 Ventana de aluminio y vidrio m2 6.89 76.10 524.33 524.33
6.89
100.00
516770 m2 8.50 57.13 485.61 485.61
Protección hierro cuadrado 1/2" 8.50
(incl. Instal) 100.00
516771 u 1.00 189.09 189.09 189.09
Puertas paneladas de madera de
1.00
0.90x2.10m
100.00
516772 Puertas paneladas de madera de u 2.00 152.75 305.50 305.50
0.70x2.10m 2.00
100.00
7,500.00
MONTO PARCIAL 471.63 1,011.38 628.48 1,955.55 1,483.45 1,727.02 222.50
PORCENTAJE PARCIAL 15.90 7.42 11.93 3.84 5.06 22.14 33.71
MONTO ACUMULADO 471.63 1,483.00 2,111.48 4,067.03 5,550.48 7,277.50 7,500.00
PORCENTAJE ACUMULADO 15.90 23.32 35.25 39.09 44.14 66.29 100.00

SON : SIETE MIL QUINIENTOS DOLARES, 00/100 CENTAVOS

ING. PAOLA SERRANO AMBATO,JULIO 2023


ELABORADO
C.I.: 1803710308

NOTA: Precio en los materiales no incluyen transporte al sitio de obra