Volume

No Pekerjaan volume satuan Harga tukang Total Harga


Pondasi Silo A
1 Bekisting 53,280 m2
2 Besi
Total Tulangan D19 ulir 801,21 kg
Total Tulangan D10 polos 86,66 kg
Total Tulangan D19 polos 119,24 kg
3 Coran 16,332 m3

Pondasi Silo B
1 Bekisting 50,04 m2
2 Besi
Total Tulangan D19 ulir 275,98 kg
Total Tulangan D10 polos 178,39 kg
Total Tulangan D19 polos 207,55 kg
3 Coran 10,389 m3
SLOOF silo B
1 Bekisting 5,700 m2
2 Besi D19 Ulir 86,33 kg
Besi sengkang D10 41,43 kg
3 Coran 0,570 m3