Volume

No Pekerjaan volume satuan Harga tukang Total Harga


Pondasi Silo A
1 Bekisting 53,280 m2
2 Besi
Total Tulangan D19 ulir 801,21 kg
Total Tulangan D10 polos 86,66 kg
Total Tulangan D19 polos 119,24 kg
3 Coran 16,332 m3

Pondasi Silo B
1 Bekisting 50,04 m2
2 Besi
Total Tulangan D19 ulir 275,98 kg
Total Tulangan D10 polos 178,39 kg
Total Tulangan D19 polos 207,55 kg
3 Coran 10,389 m3
SLOOF silo B
1 Bekisting 5,700 m2
2 Besi D19 Ulir 86,33 kg
Besi sengkang D10 41,43 kg
3 Coran 0,570 m3
1.93

1.20
A

1.20

2.25
B
PONDASI CAKAR AYAM
SILO B

2.25
C

SLOOF (0.2mX0.4m)

2.25
D

2.25
E
13.83

14.58

3.10

F 1.43 PONDASI CAKAR AYAM


SILO A
3.10

2.10 3.70 2.10


DENAH PONDASI
1 2 3 4
PEDPONDASI

PEDESTAL 2.10
0.50
ANGKUR D19 0.44

A
D19 (ULIR)

2.40
SENGKANG D10

3.00
3.10

0.60
D19 (ULIR)

3.80
0.50

3.80

DENAH PONDASI SILO A DETAIL SILO A