PROJECT: EXPANSION OF ROYAL HOSPITAL

TESTING AND COMMISSIONING REPORT


DISTRIBUTION BOARD / LIGHTING CONTROL PANEL
FOUND NOT
SNO DESCRIPTION ACTIVITY NA
SATISFIED SATISFIED

Drawing - SLD, DB Scheduling shall be Kept inside the DB


1
Pocket. DOCUMENT/GENERAL
VERIFICATION
2 Testing Equipment Calibration Certificate

3 No visible damage to impair safety.


Ensure the Testing and Commissioning shall be done with
4
Approved MS & MAS.
5 Proper Tagging & Labelling
All live parts screened with an insulating plate or earthed
6
metal.

7 Phase identification provided on the distribution board.


VISUAL INSPECTION
8 All exposed metal parts effectively earthed.
All metal conduits, trunking, switch boxes and exposed
9
metal parts effectively earthed.
All non-armored cables susceptible to damage protected
10 with steel conduit/ trunking. Bushing and rubber
grommet, where necessary, provided.
Conductor sized to suit the rating of the FUSE / MCB
11
protecting the circuit.
All joints of metal conduits or trunking to be mechanically
12 sound, electrically continuous and protected against
corrosion.

13 All exposed conductive parts effectively earthed.

14 Panel Door Earthing Shall be done.

15 DB Incoming Cable Tagging shall be done.

16 Insulation resistance of not less than 0.5 M ohm


measured between phases/neutral/ earth.
17 Checking of Voltage on O/G Power Circuit T&C
18 Checking of Phase Sequence.
19 Checking of (MCCB's) ON/OFF and Manual Trip Test

20 Checking of ELCB/RCCB/RCD