CHECKLIST FOR :-

SECTION OF WORK:-

LEVEL

STAGE SR. NO.

1
Setting Out
2
MEP/CIVIL 3

6
7
8
9
10
11
12
AHU INSTALLATION

13
14
15
16
17
18
19
20
21
22
AH
23
24
25
26
27
28
29
30
31

PREPARED BY
IST FOR :-
INSTALL
SECTION OF WORK:-

ITEM

Check Layout
Check Level
Check for Service Clearance.
Check Equipment for any damage to interior and exterior

Ensure Equipment is installed on flat and level surface. If applicable, equipment to be mounted
withinroof slope limitations.

Verify correct voltage, Phase and Cycle


Terminal Screw and wiring connections secure in control, electric and air modular panels
Check Condensate drain if properly traped
All field piping has been completed
Check motor nameplate full load amps rating
Check current draw of each leg of each motor
Check doors for air leaks
Check flexible connection has been used between ducts/AHU
Check bearing and locking collars for properly tightened setcrews,boltsand nuts
Check all ductwork has been completed and available for full air flow
Check equipment if proper clearance has been maintend as per approved shop drawings.
Check if filters are clean and installed properly
Ensure filter gauge is set to zero.
Check the foundation is suitable to achieve the required condensate drain.
Verify controls installation has been completed and fixed properly
Ensure all fields wirings has inspected and approved
Check fan bearings and locking collars for properly tightened set screws, bolt,nuts
Check fan belt tension adjusted properly
Check fan alignment with unit discharge. Adjust with isolation is required
Check that the required motorized dampers are installed
Check the required identification is done.
Check fan wheel properly aligned, tight on shaft and freely moving.
Check fan sheaves if properly aligned and tight on shaft
Check that all BMS accessories are installed properly
Check that the integration with the BMS has been done.
Ensure all safety precaution have been complied before and after installation

PREPARED BY
INSTALLATION OF AHU
MECHANICAL LOCATION:-

ITR NO.:- SYSTEM NO.

CHECKED BY HVAX CHECKED BY CLIENT

YES NO NA YES
CHECKED BY
CHECKED BY CLIENT
REMARK DATE
NO NA
APPROVED BY