INTERNAL MEMORANDUM

DATE: 12-Jan-24 FROM: ASSAY LAB. TO: SV CAO


SUBJECT: ASSAY RESULT
CC: FILE
Waybill Sample g/T Au Waybill Sample g/T Au
Date Date
Number Number 1 2 3 Number Number 1 2 3
11-Jan-24 064151 811 381.80 11-Jan-24 064067 1101 3.43
812 278.67 1102 86.07
813 304.83 1103 1.23
737 5.43 1104 0.43
738 5.50 1105 3.40
739 9.77 1106 1.23
740 17.00 1107 3.23
741 11.37 1108 1.27

11-Jan-24 064092 3373 NIL


3684 96.97
Prepared by: Noted by:
AMM DANGILAN