Hirac (Piping)
Hirac (Piping)
HIRA Registration No. : RDMP BALIKPAPAN PROJECT Prepared by: Reviewed by: Reviewed by: Approved by : Risk Category
Revision No. : 004
Revision Purpose : Change to activity wise High 15 - 25
Moderate to High 10 – 12
Node (Unit) : Piping (PIP) Moderate 5–9
Date : 30-May-20 Low to Moderate 4
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 Welding and cutting activities A Work process reviews/task- 1 Fire hazard OS 1 - Fire hazard caused by sparks contact - Injury 1 Safety (SA) PIP-SA-1.1.1.1 Y Manpower Minister Regulation No. 1 3 3 9 M N Elimination Eliminate combustible material from hot work area 1 1 1 L Elimination N/A SM/CM
based risk assessment to combustible material / 1980 Isolation Provide partition from non-combustible material at least 1.5 meters high to Isolation N/A
- Fire hazard caused by sparks contact separate flammable agent with oxidizing agent.
to flammable gas ( acetylene ) that Risk Reduction - N/A Risk Reduction - N/A
might be leak. Substitution Substitution
- Fire hazard caused by sparks contact Risk Reduction - - Provide habitat Risk Reduction - N/A
to oxidizing gas ( oxigen ) that migt be Engineering - Use Fire blanket Engineering
leak. - Flash back arrestor installation
- Fire protection system ( such as : Fire extinguishers )
- Provide Gas detector
- Keep oxygen cylinders at least 20 feet from Acetylene gas cylinders
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00013 Cutting, Welding and Grinding Procedure Risk Reduction - N/A
Administrative - Competency certification ( welder, fitter ) Administrative
- Method statement, JSA, PTW, Daily TBM
- Pre-use inspection for cutting tools & equipment
- Conduct gas monitoring
- MSDS pressurized Gas Cylinder
- Gas Lable
- Trained Fire watcher
- Trained Authorized Gas Tester
- Install warning / safety sign at hork work area
PPE Use specific PPE: face shield, welding mask, leather/ combination gloves ( PPE N/A
Apron )
A Hazard identification 2 Gas bottle pressurized OS 1 Explosion hazard caused by wrong - Injury to fatality 1 Safety (SA) PIP-SA-1.2.1.2 Y Manpower Minister Regulation No. 1 3 3 9 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
continually reviewed hazard handling pressurize gas cylinder ( / 1980 Isolation N/A Isolation N/A
dropping, hitting, rolling ) might hit the Risk Reduction - N/A Risk Reduction - N/A
workers Substitution Substitution
Risk Reduction - - Use hand truck and chain Risk Reduction - N/A
Engineering - Keep upright position with secure rack and chain. Engineering
- Use proper cradles, nets or platforms if using a crane.
- Avoid lifting cylinders by their caps or guards or with magnets or slings, which
can damage the valves.
PPE Use specific PPE: face shield, welding mask, leather/ combination gloves PPE N/A
A OS 2 Explosion hazard caused by wrong Property damage 1 Financial (F) PIP-F-1.2.2.1 Y Manpower Minister Regulation No. 1 3 3 9 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
handling pressurize gas cylinder ( / 1980 Isolation N/A Isolation N/A
dropping, hitting, rolling ) might hit the Risk Reduction - N/A Risk Reduction - N/A
property around Substitution Substitution
Risk Reduction - - Use hand truck and chain Risk Reduction - N/A
Engineering - Keep upright position with secure rack and chain. Engineering
- Use proper cradles, nets or platforms if using a crane.
- Avoid lifting cylinders by their caps or guards or with magnets or slings, which
can damage the valves.
N Hazard identification 3 Chemical hazard H 1 Metal fume - Short-term exposure can 1 Health ( H ) PIP-H-1.3.1.1 Y Manpower Minister Regulation No. 1 3 3 9 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
continually reviewed result in nausea, dizziness, / 1980 Isolation N/A Isolation N/A
or eye, nose and throat Risk Reduction - N/A Risk Reduction - N/A
irritation. Substitution Substitution
- Prolonged exposure to Risk Reduction - - Provide blower / exhaust Risk Reduction - N/A
welding fumes can lead to Engineering Engineering
cancer of the lung, larynx Risk Reduction - Process N/A Risk Reduction - Process N/A
and urinary tract, as well as change change
nervous system and kidney Risk Reduction - - 26071-100-GPP-GHX-00013 Cutting, Welding and Grinding Procedure Risk Reduction - N/A
damage Administrative - 26071-100-G01-GHX-00005-001 Health Management Plan Administrative
- Method statement, JSA,PTW, Daily TBM
- Install warning sign
PPE Use specific PPE: face shield, respirator mask PPE N/A
N Hazard identification H 2 Carbon Monoxide ( CO ) gas come out 1 Health ( H ) PIP-H-1.3.2.1 Y Manpower Minister Regulation No. 1 3 3 9 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
continually reviewed form welding machine muffler / 1980 Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Provide blower / exhaust ( for indoor activity ) Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00013 Cutting, Welding and Grinding Procedure Risk Reduction - Carbon Monoxide poisonous
Administrative - 26071-100-G01-GHX-00005-001 Health Management Plan Administrative awareness
- Method statement, JSA,PTW, Daily TBM
- Install warning sign CO gas poisonous
N Work process reviews/task- 8 Ergonomic hazard H 1 Awkward posture and repetitive Chronic health effect ( 1 Health (H) PIP-H-1.8.1.1 Y Manpower Minister Regulation No. 1 3 2 6 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
based risk assessment Musculoskeletal disorders) / 1982 Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Customization of workstations with anthropometry worker/modifying Risk Reduction - N/A
Engineering workstations (if possible) Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-G01-GHX-00002-002 Project HSE Plan Risk Reduction - Ergonomic awareness
Administrative - 26071-100-G01-GHX-00005-001 Health Management Plan Administrative
- Method statement, PTW, JSA, Daily TBM
- Variation posture at work
- Health bulletin topic (ergonomic)
N Hazard identification 10 Self working hazard OS 1 Scratched, pinched during cutting Injury 1 Safety (SA) PIP-SA-1.10.1.1 Y Manpower Minister Regulation No. 1 2 2 4 L-M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
continually reviewed / 1980 Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - N/A Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - Method statement, JSA, PTW, Daily TBM Risk Reduction - N/A
Administrative - Buddy system. Administrative
- Monitoring and supervision.
81_Piping (PIP)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Risk Reduction - - Provide shelter (temporary rest area). Risk Reduction - N/A
Engineering - Provide sufficient drinking water. Engineering
PPE Use specific PPE: fire retardant coverall, gas mask. PPE N/A
N Area risk 2 Ignition sources hazard PS 1 Ignition sources introduced to the Fire & explosion 1 Production Loss (PL) PIP-PL-2.2.1.1 N 5 2 10 M-H N Elimination Remove flammable and combustible material at surrounding workplace. 1 1 1 L Elimination N/A SM/CM
assessment/surveys flammable atmosphere can caused Isolation N/A Isolation N/A
extremme fire & explosion Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Provide habitat Risk Reduction - N/A
Engineering - Use Fire blanket Engineering
- Flash back arrestor installation
- Fire protection system ( such as : Fire extinguishers, Fire truck )
- Provide Gas detector
- Keep oxygen cylinders at least 20 feet from Acetylene gas cylinders
3 Welding & cutting at off shore Refer to above for welding & cutting
area
N Area risk 1 Drowned hazard OS 1 People drown in the water/sea Injury to fatality 1 Safety (SA) PIP-SA-3.1.1.1 N 4 2 8 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
assessment/surveys Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Provide emergency rescue boat. Risk Reduction - N/A
Engineering - establish coomunication via radio to crew at shore area. Engineering
continually reviewed body part - Eyes injury / 1980 Isolation N/A Isolation N/A
- Grinding flake contact to eyes Risk Reduction - Subsitution the grinding disc if the RPM Risk Reduction - N/A
Substitution exceed the strength of the fastenings. Substitution
Risk Reduction - - Install machine guarding Risk Reduction - N/A
Engineering - Emergency eye wash and shower available Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00013 Cutting, Welding and Grinding Procedure Risk Reduction - N/A
Administrative - ETSP Engineering Guideline Emergency Eyewash and Shower Administrative
- Method statement, JSA, PTW, Daily TBM
- Pre use inpection of grinding disc, portable machine etc
PPE Use specific PPE: face shield, dust mask PPE N/A
N Hazard identification 2 Vibration hazard H 1 Hand and arm vibration from activities illness 1 Health ( H ) PIP-H-4.2.1.1 Y 1. Manpower Minister Regulation No. 2 3 6 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
continually reviewed 1 / 1980 Isolation N/A Isolation N/A
2. Environment Minister Decision No Risk Reduction - N/A Risk Reduction - N/A
49/1996 Substitution Substitution
Risk Reduction - - Provide additional layer ( such as adsorbent ) at tool's handle Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-G01-GHX-00005-001 Health Management Plan Risk Reduction - N/A
Administrative - Method statement, JSA, PTW, Daily TBM Administrative
- Work rotation
- Regular break
PPE Use specific PPE: face shield, dust mask and adsorbent vibration gloves. PPE N/A
N Hazard identification 3 Ergonomic hazard H 1 Awkward position during grinding and illness ( Musculoskeletal 1 Health (H) PIP-H-4.3.1.1 Y Manpower Minister Regulation No. 1 2 3 6 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
continually reviewed repetitive. disorder ) / 1982 Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - N/A Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-G01-GHX-00005-001 Health Management Plan Risk Reduction - N/A
Administrative - Method statement, JSA, PTW, Daily TBM Administrative
- Work rotation
- Regular break
PPE - Breathing apparatus such as SCBA set for rescue PPE N/A
- Work unit breathing apparatus such as airline for working at inert confined
space
- Half mask with specific respirator (if required)
A Area risk 2 Confined space Hazard OS 1 Lack of access to get immediate - Serious injury 1 Safety (SA) PIP-SA-5.2.1.1 Y - Manpower Minister Regulation No. 4 3 12 M-H N Elimination Lone working not allowed inside the confined space 3 1 3 L Elimination N/A SM/CM
assessment/surveys (Lone working hazard) response during emergency condition, - fatality 1 / 1980
will loose the rescue golden time. - Manpower Minister Regulation No
113/DJPPK/IX/2006 Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - N/A Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-G01-GHX-00002-002 Project HSE Plan Risk Reduction - Provide site specific procedure for
Administrative - Method statement, JSA, PTW, Daily TBM. Administrative confined space
- Standby man
- Buddy system
83_Piping (PIP)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Risk Reduction - - 26071-100-GPP-GHX-00010-001 Lock Out Tag Out (LOTO) Procedure Risk Reduction - Provide site specific procedure for
Administrative - MP2-ETSP-HSE-GP-0004-00-2019 LOTO Administrative confined space
- Method statement, JSA, PTW, Daily TBM.
- Caution sign: confined space, Do not enter, Authorize person only
- Competence authorize gas detector.
- Trained stand by man / Entru watcher
- Trained confined space entrant
- Barricade or close the man hole when not occupied
- Dedicated ERT and equipment for the confined space rescue
PPE - Breathing apparatus such as SCBA set for rescue PPE N/A
- Work unit breathing apparatus such as airline for working at inert confined
space
- Half mask with specific respirator (if required)
Work process reviews/task- OS Property damage 2 Financial (F) PIP-F-5.3.1.2 Y 1. Manpower Minister Regulation No. 5 1 5 M N Elimination Depressurizing and remove gases in the confined space, Flushing 2 1 2 L Elimination N/A SM/CM
based risk assessment 1 / 1980
Isolation Implementation of LOTO Isolation N/A
2. Manpower Minister Regulation No
Risk Reduction - Substitute atmosphere inside confined space with fresh air Risk Reduction - N/A
113/DJPPK/IX/2006
Substitution Substitution
Risk Reduction - - Provide multigas detector Risk Reduction - N/A
Engineering - Provide blower for fresh air circulation inside confined space Engineering
- Buddy system
- Flammable material and ignition sources are not allowed to bring inside the
confined space
- electrical equipment shall be protected with ELCB
- Use intrinsically safe tools at inside confined space or electrical devices below
50 V AC
- Fire protection sytem ( such as : Fire extinguisher etc )
PPE - Breathing apparatus such as SCBA set for rescue PPE N/A
- Work unit breathing apparatus such as airline for working at inert confined
space
- Half mask with specific respirator (if required)
A Learning from event analysis 4 illumination hazard H 1 Inadequate lighting lead to eye illness 1 Health (H) PIP-H-5.4.1.1 Y 1. Manpower Minister Regulation No. 2 3 6 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
disorders, headaches and may 1 / 1980
contribute to depression 2. Manpower Minister Regulation No
113/DJPPK/IX/2006 Isolation N/A Isolation N/A
Risk Reduction - - Provide adequate explosion proof lighting inside confined space Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - Method statement, PTW, JSA, Daily TBM. Risk Reduction - Provide site specific procedure for
Administrative - To carry out regular check and measurement for illumination at workplace Administrative confined space
N Area risk 5 Extreme temperature OS 1 Heat stress Dehydration 1 Health (H) PIP-H-5.5.1.1 Y - Manpower Minister Regulation No. 4 2 8 M N Elimination N/A 3 1 3 L Elimination N/A SM/CM
assessment/surveys 1 / 1980
- Manpower Minister Regulation No
113/DJPPK/IX/2006 Isolation N/A Isolation N/A
Area risk 2 Hot temperature in confined space due Fire 1 Safety (SA) PIP-SA-5.5.2.1 Y - Manpower Minister Regulation No. 4 2 8 M N Elimination Remove all combustible material from confine space 3 1 3 L Elimination N/A SM/CM
assessment/surveys to hot work activities can caused e fire 1 / 1980
- Manpower Minister Regulation No
113/DJPPK/IX/2006 Isolation N/A Isolation N/A
Risk Reduction - - Provide ventilation (natural and forced ventilation) Risk Reduction - N/A
Engineering - Provide multigas detector Engineering
- Provide blower for fresh air circulation inside confined space
- electrical equipment shall be protected with ELCB
- Use intrinsically safe tools at inside confined space or electrical devices below
50 V AC
- Fire protection sytem ( such as : Fire extinguisher etc )
84_Piping (PIP)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
A Hazard identification 6 Electrical Hazard OS 1 - insulation cable damage - Electric shock 1 Safety (SA) PIP-SA-5.6.1.1 Y - Manpower Minister Regulation No. 4 2 8 M N Elimination N/A 3 1 3 L Elimination N/A SM/CM
continually reviewed - Fatality 1 / 1980
- Manpower Minister Regulation No
113/DJPPK/IX/2006 Isolation N/A Isolation N/A
N Area risk 1 Chemical hazards OS 1 Exposed to flammable or toxic gas. E.g. - Injury 1 Safety (SA) PIP-SA-6.1.1.1 Y 1. Manpower Minister Decision 3 3 9 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
assessment/surveys due to leakage - Fatality 187/1999 Isolation N/A Isolation N/A
2. Manpower Minister Regulation No. Risk Reduction - N/A Risk Reduction - N/A
1 / 1980 Substitution Substitution
Risk Reduction - - Provide Gas detector to notice flammable atmosphere. Risk Reduction - N/A
Engineering - Fire protection system ( Fire extinguisher, Fire truck etc ) Engineering
PPE Use specific PPE: fire retardant coverall, gas mask. PPE N/A
N Area risk 2 Ignition sources hazard PS 1 Ignition sources introduced to the Fire & explosion 1 Production Loss (PL) PIP-PL-6.2.1.1 N 3 3 9 M N Elimination Good housekeeping practice to remove flammable and combustible material at 1 1 1 L Elimination N/A SM/CM
assessment/surveys flammable atmosphere can caused fire surrounding workplace.
& explosion Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Provide Gas detector to notice flammable atmosphere. Risk Reduction - N/A
Engineering - Fire protection system ( Fire extinguisher, Fire truck etc ) Engineering
based risk assessment compressed air 09 / 2016 Isolation - use blast rooms/cabinet for smaller blasting operation Isolation N/A
- Manpower Minister Regulation No.
1 / 1980 Risk Reduction - N/A Risk Reduction - N/A
- Manpower Minister Regulation No. Substitution Substitution
5 / 1985 Risk Reduction - - Using whip lock Risk Reduction - N/A
- Manpower Minister Regulation 9 / Engineering - leak test Engineering
2010
- Manpower Minister Regulation No. Risk Reduction - Process - Perform routine cleanup To blasting compressor and accessories Risk Reduction - Process N/A
1 / 1980 change change
- Manpower Minister Regulation No. Risk Reduction - - 26071-100-G01-GHX-00002-002 Project HSE Plan Risk Reduction - N/A
Kep. 113/DJPPK/IX/2006 Administrative - Method statement, JSA, PTW, Daily TBM Administrative
- Manpower Minister Regulation No. - Restrict access to blasting area
3 / 1998 - Keep coworker away from blaster
- premobilization inspection for air compressor and sand blasting accessories
- Ensure integrity of hose and connection from compressor to blsating gun
- if possible to schedule blasting when the least number of workers are at the
site
N Hazard identification 2 Chemical hazards (sand H 1 Workers exposed to siclica dust Illness ( silicosis, lung 1 Health (H) PIP-H-8.2.1.1 Y Manpower Minister Regulation No. 1 3 3 9 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
continually reviewed blasting materials) cancer ) / 1980 Isolation - Use barriers and curtain walls to isolate the blasting operation from other Isolation N/A
worker
- use blast rooms/cabinet for smaller blasting operation
- Restrict access to blasting area
- Keep coworker away from blaster
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - Use exhaust ventilation systems in containment room/cabinet to capture dust Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-G01-GHX-00002-002 Project HSE Plan Risk Reduction - N/A
Administrative - 26071-100-G01-GHX-00005-001 Health Management Plan Administrative
- Method statement, JSA, PTW, Daily TBM
- if possible to schedule blasting when the least number of workers are at the
site
- Avoid blasting in windy condition
- Personal hygiene practices
- SDS for blasting material
- Health bulletin (abrasive blasting)
- experience blaster
Specific PPE - Sand blasting eye and face protection Specific PPE N/A
- ear plug/ear muff
- leather gloves to protect full forearm and apron
- Respiratory protection
N Hazard identification 3 Dust (sand blasting dust) E 1 Poor visibility due to dust and Complaint from society 1 Reputation (RE) PIP-RE-8.3.1.1 Y 1. Government Regulation No 41 3 2 6 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
continually reviewed contaminate to enviromental around Thn 1999 Isolation To assign dedicated place for sand blasting activity which far from community Isolation N/A
site Risk Reduction - Use abrasive materials that can be delivered with water (slurry) to reduce dust Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Provide exhaust to reduce dust Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-G01-GHX-00002-002 Project HSE Plan Risk Reduction - Silicosis awareness
Administrative - RKL-RPL Pertamina RU-V Administrative
- Method statement, JSA, PTW, Daily TBM
- Monitoring ambient air parameter at project boundary
86_Piping (PIP)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
PPE Use specific PPE: face shield, welding mask, leather/ combination gloves, PPE N/A
rubber boot, body harness, PGD
OS 2 Open hole or uneven ground condition Personal injury 1 Safety (SA) PIP-SA-9.1.2.1 Y Manpower Minister Regulation No. 1 2 2 4 L-M N Elimination N/A 1 2 2 L Elimination N/A
from excavation activity / 1980 Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - Fence / Guard installation Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - Method statement, JSA, Daily TBM, PTW Risk Reduction - N/A
Administrative - Install warnign sign / barricade surrounding area Administrative
PPE Use specific PPE: hand gloves, rubber boot. PPE N/A
Area risk 2 Biological Hazard H 1 Snake bite might found in the hole Fatality 1 Safety (SA) PIP-SA-9.2.1.1 N 4 3 12 M-H N Elimination N/A 3 2 6 M Elimination N/A
assessment/surveys
Isolation N/A Isolation N/A
PPE Use specific PPE: hand gloves, rubber boot and long sleeve PPE N/A
N Hazard identification 3 Manual Handling H 1 - Lift up material more than 25 kg, illness ( Musculoskeletal 1 Health (H) PIP-H-9.3.1.1 Y 1. Manpower Minister Regulation 5 / 2 3 6 M N Elimination N/A 2 1 2 L Elimination N/A SM/CM
continually reviewed repeated Disorders ) 2018
2. Health Minister Regulation 70 /
2016 Isolation N/A Isolation N/A
3. Health Minister Regulation 48 /
2016
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
PPE Use specific PPE: leather/ combination gloves, rubber boot. PPE N/A
N Work process reviews/task- OS 2 Slips, trips and falls during working Injury 1 Safety (SA) PIP-SA-9.3.2.1 Y - Health Minister Regulation No. 48 2 2 4 L-M N Elimination - Good housekeeping 1 1 1 L Elimination N/A SM/CM
based risk assessment /2016 - Maintain surface condition flat and non slippery
- Health Minister Regulation No 10 / Isolation N/A Isolation N/A
2018 Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - N/A Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-G01-GHX-00002-002 Project HSE Plan Risk Reduction - N/A
Administrative - 26071-100-G01-GHX-00005-001 Health Management Plan Administrative
- MP2-ETP-HSE-GP-0005-00-2019 Project HSSE Plan
- Method statement, PTW, JSA, Daily TBM
- Health bulletin (Manual Lifting technique)
- work rotation (mini break)
PPE Use specific PPE: leather/ combination gloves, rubber boot. PPE N/A
11 Stringing at brownfield area Refer to above for stringing
N Area risk 1 Chemical hazards OS 1 Exposed to flammable or toxic gas. E.g. - Injury 1 Safety (SA) PIP-SA-11.1.1.1 Y 1. Manpower Minister Decision 3 3 9 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
assessment/surveys due to leakage - Fatality 187/1999 Isolation N/A Isolation N/A
2. Manpower Minister Regulation No. Risk Reduction - N/A Risk Reduction - N/A
1 / 1980 Substitution Substitution
Risk Reduction - - Provide Gas detector to notice flammable atmosphere. Risk Reduction - N/A
Engineering - Fire protection system ( Fire extinguisher, Fire truck etc ) Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00033-000 Hot Work Procedure Risk Reduction - N/A
Administrative - 26071-100-GPP-GCC-00004-002 SIMOPS Plan for ISBL-OSBL Administrative
- Method statement, PTW, JHA, Daily TBM
- Emergency response training
- Nearest assembly point and windsock location
PPE Use specific PPE: fire retardant coverall, gas mask. PPE N/A
N Area risk 2 Ignition sources hazard PS 1 Ignition sources introduced to the Fire & explosion 1 Production Loss (PL) PIP-PL-11.2.1.1 N 3 3 9 M N Elimination Good housekeeping practice to remove flammable and combustible material at 1 1 1 L Elimination N/A SM/CM
assessment/surveys flammable atmosphere and resulted in surrounding workplace.
fire & explosion Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Provide Gas detector to notice flammable atmosphere. Risk Reduction - N/A
Engineering - Fire protection system ( Fire extinguisher, Fire truck etc ) Engineering
87_Piping (PIP)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
PPE Use specific PPE: face shield, welding mask, leather/ combination gloves, PPE N/A
rubber boot, body harness, PGD
14 Phassed Array Ultrasonic N Hazard identification 1 Electrical hazard OS 1 Electrocution - Burns injury 1 Safety (SA) PIP-SA-14.1.1.1 Y Manpower Minister Regulation No. 2 3 6 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
Testing ( PAUT ) continually reviewed - Electric shock 12 / 2015 Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - N/A Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process - Good cable management at work area Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-G01-GHX-00002 Project HSE Plan Risk Reduction - N/A
Administrative - Method statement, PTW, JSA, Daily TBM Administrative
- Premobilization inspection for the electrical appliances
- To Provide fire extingusiher
- Work carry out by PAUT specialist
based risk assessment and potential to exposed with particle ) 1999 Isolation N/A Isolation N/A
dust Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - Provide eye wash/shower station Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-G01-GHX-00002-002 Project HSE Plan Risk Reduction - N/A
Administrative - Method statement, PTW, JSA, Daily TBM Administrative
- Health bulletin (dust effect to health)
PPE Use specific PPE: face shield, welding mask, leather/ combination gloves, PPE N/A
rubber boot, body harness, PGD
A E 2 Leak of water Environmental pollution 1 Environment (EN) PIP-EN-15.1.2.1 Y Manpower Minister Regulation No. 1 3 3 9 M N Elimination N/A 1 2 2 L Elimination N/A SM/CM
/ 1980 Isolation N/A Isolation N/A
Risk Reduction - - Only use certified equipment Risk Reduction - N/A
Substitution - Utilize competent operator Substitution
Risk Reduction - N/A Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - Personnel Awareness, PTW, Toolbox Meeting, MS, JSA. Risk Reduction - N/A
Administrative - Pre-use inspection for hydrotest tools, such as manifold, hose, fitting Administrative
connection, PSV, Pressure gauge, blind flange.
- Barricade and sign to be installed at surrounding area affected by hydrotest
activity.
PPE Use specific PPE: face shield, welding mask, leather/ combination gloves, PPE N/A
rubber boot, body harness, PGD
N Area risk 2 Radiation non pengion H 1 Exposed to radioactive source Mutagen, Carcinogenic 1 Health (H) PIP-H-15.2.1.1 Y 1. Act No. 10/ 1997 regarding 3 3 9 M N Elimination N/A 2 1 2 L Elimination N/A SM/CM
assessment/surveys hazard Nuclear Power Isolation Clear area for the activity in certain distance (refer to procedure), completed Isolation N/A
2. Government Regulation No. 63/ with clear sign board, TOA, rotary lamp
2000 regarding Safety and Health in Risk Reduction - N/A Risk Reduction - N/A
the Use of Ionizing Radiation Substitution Substitution
3. Government Regulation No. 64/ Risk Reduction - N/A Risk Reduction - N/A
2000 regarding Permission for Engineering Engineering
Nuclear Power Utilization Risk Reduction - Process N/A Risk Reduction - Process N/A
4. Decree of Head of BAPETEN No. change change
01/Ka-BAPETEN/V-99 regarding Risk Reduction - - 26071-100-G01-GHX-00002 Project HSE Plan Risk Reduction - N/A
Occupational Safety provisions for Administrative - Only use certified equipment Administrative
radiation - Utilize competent AR, OR, PPR
5. Regulation of The Head of Nuclear - Barricade and sign to be installed at surrounding area affected by NDE
Power Management (BAPETAN) No. - Personnel Awareness, PTW, Toolbox Meeting, MS, JSA
15/ 2015 regarding Safety of
Radiation in The Production of
Diagnostic and Interventional
PPE Use specific PPE: lead cover apron, film badge as per Procedure PPE N/A
Radiological Aircraft Products
E 2 Radioactive waste - Impact to community 1 Environment (EN) PIP-EN-15.2.2.1 Y 1. Act No. 10/ 1997 regarding 3 3 9 M N Elimination N/A 2 1 2 L Elimination N/A SM/CM
- Impact to flora and fauna Nuclear Power Isolation N/A Isolation N/A
2. Government Regulation No. 63/ Risk Reduction - N/A Risk Reduction - N/A
2000 regarding Safety and Health in Substitution Substitution
the Use of Ionizing Radiation Risk Reduction - Provide bunker as government regulation if contractor will keep radioactive Risk Reduction - N/A
3. Government Regulation No. 64/ Engineering source at contractor premises Engineering
2000 regarding Permission for
Risk Reduction - Process Radioactive sources handling and storage responsibilities shall be under Risk Reduction - Process N/A
Nuclear Power Utilization
change subcontractor for radiagraphy activities (outside contractor premises) change
4. Decree of Head of BAPETEN No.
01/Ka-BAPETEN/V-99 regarding
Occupational Safety provisions for Risk Reduction - PTW, Toolbox Meeting, MS, JSA
radiation Administrative
5. Regulation of The Head of Nuclear PPE N/A PPE N/A
Power Management (BAPETAN) No.
15/ 2015 regarding Safety of
Radiation in The Production of
Diagnostic and Interventional
Radiological Aircraft Products.
N Area risk 1 Chemical hazards OS 1 Exposed to flammable or toxic gas. E.g. - Injury 1 Safety (SA) PIP-SA-16.1.1.1 Y 1. Manpower Minister Decision 3 3 9 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
assessment/surveys due to leakage - Fatality 187/1999 Isolation N/A Isolation N/A
2. Manpower Minister Regulation No. Risk Reduction - N/A Risk Reduction - N/A
1 / 1980 Substitution Substitution
Risk Reduction - N/A Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00033-000 Hot Work Procedure Risk Reduction - N/A
Administrative - 26071-100-GPP-GCC-00004-002 SIMOPS Plan for ISBL-OSBL Administrative
- Method statement, PTW, JHA, Daily TBM
- Emergency response training
- Nearest assembly point and windsock location
PPE Use specific PPE: fire retardant coverall, gas mask. PPE N/A
89_Piping (PIP)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
N Area risk 2 Ignition sources hazard PS 1 Ignition sources introduced to the Fire & explosion 1 Production Loss (PL) PIP-PL-16.2.1.1 N 3 3 9 M N Elimination Good housekeeping practice to remove flammable and combustible material at 1 1 1 L Elimination N/A SM/CM
assessment/surveys flammable atmosphere and resulted in surrounding workplace.
fire & explosion Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - N/A Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00033-000 Hot Work Procedure Risk Reduction - N/A
Administrative - 26071-100-GPP-GCC-00004-002 SIMOPS Plan for ISBL-OSBL Administrative
- Method statement, PTW, JHA, Daily TBM
- Emergency response training
- Nearest assembly point and windsock location
17 Pipe testing at off shore area Refer to above for pipe testing
N Area risk 1 Drowned hazard OS 1 People drown in the water/sea Injury to fatality 1 Safety (SA) PIP-SA-17.11.1 N 4 3 12 M-H N Elimination N/A 1 1 1 L Elimination N/A SM/CM
assessment/surveys Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Provide emergency rescue boat. Risk Reduction - N/A
Engineering - establish coomunication via radio to crew at shore area. Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00004-001 HSE Training Procedure Risk Reduction - To provide site specific procedure
Administrative - Method statement, PTW, JSA, Daily TBM Administrative for working near or over water
- To follow basic sea survival (BSS) or similar training including the specific emergency
rescue plan.
PPE Use specific PPE: air muff/ ear plug PPE N/A
20 Hydrotest N Work process reviews/task- 1 Slipped hazard OS 1 pressure (failure system due to head Slip and trip 1 Safety (SA) PIP-SA-20.1.1.1 Y 1. Manpower Minister Regulation 5 / 3 3 9 M N Elimination N/A 1 3 3 L Elimination N/A SM/CM
based risk assessment loses during pressurize), usage of 2018 Isolation N/A Isolation N/A
natural resources, gravity 2. Health Minister Regulation 70 / Risk Reduction - - The appropriateness / condition of the equipment to be used (pump, hose, Risk Reduction - N/A
2016 Substitution coupling, compressor) Substitution
3. Health Minister Regulation 48 / - The workers who are not involved are prohibited at the hydrotest
2016 - The safe radius is installed barrier / barricade
4. Local Regulation of Balikpapan
No. 13 / 2015
Risk Reduction - - The pipe connection/ flanges is tight with torque wrench Risk Reduction - N/A
Engineering - Provide signage and barricade Engineering
PPE Use specific PPE: air muff/ ear plug, rubber boot, hand glove PPE N/A
2 Slipped hazard OS 1 pressure (stored energy), human Body injury, pinch point, slip 1 Safety (SA) PIP-SA-20.2.1.1 Y 1. Manpower Minister Regulation 5 / 3 3 9 M N Elimination N/A 1 2 2 L Elimination N/A SM/CM
mechanic (manual handling), gravity, and trip 2018 Isolation N/A Isolation N/A
waste water disposal 2. Health Minister Regulation 70 / Risk Reduction - - The appropriateness / condition of the equipment to be used (pump, hose, Risk Reduction - N/A
2016 Substitution coupling, compressor) Substitution
3. Health Minister Regulation 48 / - The workers who are not involved are prohibited at the hydrotest
2016 - The safe radius is installed barrier / barricade
4. Local Regulation of Balikpapan
No. 13 / 2015
Risk Reduction - The pipe connection/ flanges is tight with torque wrench Risk Reduction - N/A
Engineering Engineering
90_Piping (PIP)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
PPE Use specific PPE: air muff/ ear plug, rubber boot, hand glove, lead protection PPE N/A
21 Installation steam tracing N Hazard identification 1 Working at height hazards ( OS 1 - Slips and Trips Injury to Fatality ( Multiple 1 Safety (SA) PIP-SA-21.1.1.1 Y 1. Manpower Minister Regulation No. 4 3 12 M-H N Elimination N/A 2 1 2 L Elimination N/A SM/ CM
continually reviewed by using scaffolding ) - Dropped Object fatality ) 09 / 2016 Isolation N/A Isolation N/A
- Scaffolding collapse 2. Manpower Minister Regulation No. Risk Reduction - N/A Risk Reduction - N/A
- Fall from height 1 / 1980 Substitution Substitution
- Collided by overhead objects Risk Reduction - - Fall protection sysytem installation ( Safety net, Life line ) Risk Reduction - N/A
- Pinched Engineering -Provide pulley to lift and lowering material and tools Engineering
-Proper storage (secure) of tools and material at elevated arae.
PPE Mandatory PPE and Sepecific PPE ( Fullbody harness ) PPE N/A
N Hazard identification OS 2 Scaffolding collapse - Property damage 1 Financial (F) PIP-F-21.1.2.1 Y 1. Manpower Minister Regulation No. 3 3 9 M N Elimination N/A 2 1 2 L Elimination N/A SM/ CM
continually reviewed - Tools & equipment 09 / 2016 Isolation N/A Isolation N/A
damage 2. Manpower Minister Regulation No. Risk Reduction - N/A Risk Reduction - N/A
1 / 1980 Substitution Substitution
Risk Reduction - - Fall protection sysytem installation ( Safety net, Life line ) Risk Reduction - N/A
Engineering - Provide pulley to lift and lowering material and tools Engineering
- Proper storage (secure) of tools and material at elevated arae.
PPE Mandatory PPE and Sepecific PPE ( Fullbody harness ) PPE N/A
22 Installation steam tracing at brownfield area Refer to above for Installation steam tracing
N Area risk 1 Chemical hazards OS 1 Exposed to flammable or toxic gas. E.g. - Injury 1 Safety (SA) PIP-SA-22.1.1.1 Y 1. Manpower Minister Decision 3 3 9 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
assessment/surveys due to leakage - Fatality 187/1999 Isolation N/A Isolation N/A
2. Manpower Minister Regulation No. Risk Reduction - N/A Risk Reduction - N/A
1 / 1980 Substitution Substitution
Risk Reduction - - Provide Gas detector to notice flammable atmosphere. Risk Reduction - N/A
Engineering - Fire protection system ( Fire extinguisher, Fire truck etc ) Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00033-000 Hot Work Procedure Risk Reduction - N/A
Administrative - 26071-100-GPP-GCC-00004-002 SIMOPS Plan for ISBL-OSBL Administrative
- Method statement, PTW, JHA, Daily TBM
- Emergency response training
- Nearest assembly point and windsock location
PPE Use specific PPE: fire retardant coverall, gas mask. PPE N/A
N Area risk 2 Ignition sources hazard PS 1 Ignition sources introduced to the Fire & explosion 1 Production Loss (PL) PIP-PL-22.2.1.1 N 3 3 9 M N Elimination Good housekeeping practice to remove flammable and combustible material at 1 1 1 L Elimination N/A SM/CM
assessment/surveys flammable atmosphere and resulted in surrounding workplace.
fire & explosion Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Provide Gas detector to notice flammable atmosphere. Risk Reduction - N/A
Engineering - Fire protection system ( Fire extinguisher, Fire truck etc ) Engineering
23 Installation steam tracing at off shore area Refer to above for Installation steam tracing
N Area risk 1 Drowned hazard OS 1 People drown in the water/sea Injury to fatality 1 Safety (SA) PIP-SA-.23.1.1.1 N 4 3 12 M-H N Elimination N/A 1 1 1 L Elimination N/A SM/CM
assessment/surveys Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Provide emergency rescue boat. Risk Reduction - N/A
Engineering - establish coomunication via radio to crew at shore area. Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00004-001 HSE Training Procedure Risk Reduction - To provide site specific procedure
Administrative - Method statement, PTW, JSA, Daily TBM Administrative for working near or over water
- To follow basic sea survival (BSS) or similar training including the specific emergency
rescue plan.
91_Piping (PIP)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
PPE Use specific PPE: face shield, respirator mask PPE N/A
N H 2 Carbon Monoxide ( CO ) gas come out 1 Health ( H ) PIP-H-24.3.2.1 Y Manpower Minister Regulation No. 1 3 3 9 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
form welding machine muffler / 1980 Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Provide blower / exhaust ( for indoor activity ) Risk Reduction - N/A
Engineering - Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00013 Cutting, Welding and Grinding Procedure Risk Reduction - N/A
Administrative - Method statement, JSA,PTW, Daily TBM Administrative
- Install warning sign CO gas poisonous
N Area risk 4 Radiation hazard H 1 Ultra violet & infra red - Skin irritation 1 Health ( H ) PIP-H-24.4.1.1 Y Manpower Minister Regulation No. 1 1 3 3 L N Elimination N/A 1 1 1 L Elimination N/A SM/CM
assessment/surveys - Eyes irritatiton ( / 1980 Isolation Install Shields/insulation between heat and employees Isolation N/A
conjunctivity ) Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Ventilation system Risk Reduction - N/A
Engineering - Provide cool rest area Engineering
- Provide sufficient drinking water.
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - Method statement, JSA,PTW, Daily TBM. Risk Reduction - N/A
Administrative - Heat stress awareness Administrative
93_Piping (PIP)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Risk Reduction - - 26071-100-GPP-GHX-00008-001 Heat Stress Prevention Management Risk Reduction - N/A
Administrative Procedure Administrative
- MP2-ETP-HSE-GP-0005-00-2019 - Project HSSE Plan
- Method statement, PTW, JSA, Daily TBM
PPE Use specific PPE: face shield, welding mask, leather/ combination gloves ( PPE N/A
Apron )
A Hazard identification 2 Gas bottle pressurized OS 1 Explosion hazard caused by wrong - Injury to fatality 1 Safety (SA) PIP-SA-25.2.1.1 Y Manpower Minister Regulation No. 1 5 3 15 H Y Elimination N/A 3 1 3 L Elimination N/A SM/CM
continually reviewed hazard handling pressurize gas cylinder ( - Property damage / 1980 Isolation N/A Isolation N/A
dropping, hitting, rolling ) Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Use hand truck and chain Risk Reduction - N/A
Engineering - Keep upright position with secure rack and chain. Engineering
- Use proper cradles, nets or platforms if using a crane.
- Avoid lifting cylinders by their caps or guards or with magnets or slings, which
can damage the valves.
PPE Use specific PPE: face shield, respirator mask PPE N/A
N H 2 Carbon Monoxide ( CO ) gas come out 1 Health ( H ) PIP-H-25.3.2.1 Y Manpower Minister Regulation No. 1 3 3 9 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
form welding machine muffler / 1980 Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Provide blower / exhaust ( for indoor activity ) Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00013 Cutting, Welding and Grinding Procedure Risk Reduction - N/A
Administrative - Method statement, JSA,PTW, Daily TBM Administrative
- Install warning sign CO gas poisonous
PPE Use specific PPE: fire retardant coverall, gas mask. PPE N/A
N Area risk 2 Ignition sources hazard PS 1 Ignition sources introduced to the Fire & explosion 1 Production Loss (PL) PIP-PL-26.2.1.1 N 5 3 15 H Y Elimination Good housekeeping practice to remove flammable and combustible material at 3 1 3 L Elimination N/A SM/CM
assessment/surveys flammable atmosphere and resulted in surrounding workplace.
fire & explosion Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - N/A Risk Reduction - N/A
Engineering Engineering
95_Piping (PIP)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
27 Pipe tie in at off shore area Refer to above for Pipe tie in
N Area risk 1 Drowned hazard OS 1 People drown in the water/sea Injury to fatality 1 Safety (SA) PIP-SA-27.1.1.1 N 3 3 9 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
assessment/surveys Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Provide emergency rescue boat. Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00004-001 HSE Training Procedure Risk Reduction - To provide site specific procedure
Administrative - Method statement, PTW, JSA, Daily TBM Administrative for working near or over water
- To follow basic sea survival (BSS) or similar training including the specific emergency
- Establish coomunication via radio to crew at shore area rescue plan.
PPE Mandatory PPE (helmet, Safety shoes, safety glasses, long sleeve, hand glove, PPE N/A
life jacket.
Use specific PPE: work vest
28 Painting & Coating (working at N Hazard identification 1 Working at height hazard (by OS 1 - Slips and Trips - Serious injury 1 Safety (SA) PIP-SA-28.1.1.1 Y - Manpower Minister Regulation No. 4 3 12 M-H N Elimination N/A 3 1 3 L Elimination N/A SM/CM
height) continually reviewed using scaffolding) - Dropped Object - Fatality 09 / 2016
- Fall from height - Manpower Minister Regulation No. Isolation N/A Isolation N/A
- Collided by overhead objects 1 / 1980 Risk Reduction - N/A Risk Reduction - N/A
- Pinched Substitution Substitution
- Scaffolding collapse Risk Reduction - - Fall protection sysytem installation ( Safety net, Life line ) Risk Reduction - N/A
Engineering - Provide pulley to lift and lowering material and tools Engineering
- Proper storage (secure) of tools and material at elevated arae
- Solid and even surface as scaffolding base
- Provide Tool bag to workers
N Hazard identification 3 Chemical hazard (paint & H 1 Exposure from paint & thinner Illness 1 Health (H) PIP-H-28.3.1.1 Y 1. Manpower Minister Decision 3 3 9 M N Elimination N/A 2 1 2 L Elimination N/A SM/CM
continually reviewed thinner) - eye, skin & respiratory irritation 187/1999 Isolation N/A Isolation N/A
2. Manpower Minister Regulation No. Risk Reduction - N/A Risk Reduction - N/A
1 / 1980 Substitution Substitution
Risk Reduction - Provide eye wash/shower station Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-G01-GHX-00005-001 Health Management Plan Risk Reduction - N/A
Administrative - Method statement, PTW, JSA, Daily TBM Administrative
- Health bulletin topic (chemical hazard)
- Safety data sheet (SDS)
- Chemical label
- Warning sign
N Area risk 2 Ignition sources hazard OS 1 Ignition sources introduced to the Fire & explosion 1 Production Loss (PL) PIP-PL-29.2.1.1 N 3 3 9 M N Elimination Good housekeeping practice to remove flammable and combustible material at 2 1 2 L Elimination N/A SM/CM
assessment/surveys flammable atmosphere and resulted in surrounding workplace.
fire & explosion Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
97_Piping (PIP)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Risk Reduction - - Gas check using gas detector by authorize gas tester Risk Reduction - N/A
Engineering - Emergency response team available Engineering
- Proper bonding and grounding
- Fire water available
30 Painting & coating at off shore area Refer to above for painting & coating
N Area risk 1 Drowned hazard OS 1 People drown in the water/sea Injury to fatality 1 Safety (SA) PIP-SA-30.1.1.1 N 4 3 12 M-H N Elimination N/A 1 1 1 L Elimination N/A SM/CM
assessment/surveys Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Provide emergency rescue boat. Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00004-001 HSE Training Procedure Risk Reduction - To provide site specific procedure
Administrative - Method statement, PTW, JSA, Daily TBM Administrative for working near or over water
- To follow basic sea survival (BSS) or similar training including the specific emergency
- establish coomunication via radio to crew at shore area rescue plan.
PPE Use specific PPE: mechanical protection hand gloves PPE N/A
32 Insulation at brownfield area Refer to above for Insulation
N Area risk 1 Chemical hazards OS 1 Exposed to flammable or toxic gas. E.g. - Injury 1 Safety (SA) PIP-SA-32.1.1.1 Y 1. Manpower Minister Decision 3 3 9 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
assessment/surveys due to leakage - Fatality 187/1999 Isolation N/A Isolation N/A
2. Manpower Minister Regulation No. Risk Reduction - N/A Risk Reduction - N/A
1 / 1980 Substitution Substitution
Risk Reduction - - Control of ignition sources coming from drilling activities. Risk Reduction - N/A
Engineering - Gas check using gas detector by authorize gas tester. Engineering
- Fire water available.
- Close communication with Pertamina RU-V area authority.
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00033-000 Hot Work Procedure Risk Reduction - N/A
Administrative - 26071-100-GPP-GCC-00004-002 SIMOPS Plan for ISBL-OSBL Administrative
- Method statement, PTW, JHA, Daily TBM
- Emergency response training
- Nearest assembly point and windsock location
PPE Use specific PPE: fire retardant coverall, gas mask. PPE N/A
N Area risk 2 Ignition sources hazard PS 1 Ignition sources introduced to the Fire & explosion 1 Production Loss (PL) PIP-PL-32.2.1.1 N 3 3 9 M N Elimination Good housekeeping practice to remove flammable and combustible material at 1 1 1 L Elimination N/A SM/CM
assessment/surveys flammable atmosphere and resulted in surrounding workplace.
fire & explosion Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Control of ignition sources from drilling activity. Risk Reduction - N/A
Engineering - Gas detector to notice flammable atmosphere. Engineering
- All vehicle shall have spark arrester.
- Emergency response team available.
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00033-000 Hot Work Procedure Risk Reduction - N/A
Administrative - 26071-100-GPP-GCC-00004-002 SIMOPS Plan for ISBL-OSBL Administrative
- Method statement, PTW, JHA, Daily TBM
- Emergency response training
- Nearest assembly point and windsock location
98_Piping (PIP)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Risk Reduction - - Have good oordination with local government & client in related with Risk Reduction - N/A
Administrative transportation at public road/area Administrative
- Community development programs
- Establish good relation with local media
PPE Use specific PPE: fire retardant coverall, gas mask. PPE N/A
N Area risk 2 Ignition sources hazard PS 1 Ignition sources introduced to the Fire & explosion 1 Production Loss (PL) PIP-PL-35.2.1.1 N 3 3 9 M N Elimination Good housekeeping practice to remove flammable and combustible material at 1 1 1 L Elimination N/A SM/CM
assessment/surveys flammable atmosphere and resulted in surrounding workplace.
fire & explosion Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Provide Gas detector to notice flammable atmosphere. Risk Reduction - N/A
Engineering - Fire protection system ( Fire extinguisher, Fire truck etc ) Engineering
36 Pipe demolition at off shore area Refer to above for Pipe demolition
N Area risk 1 Drowned hazard OS 1 People drown in the water/sea Injury to fatality 1 Safety (SA) PIP-SA-36.1.1.1 N 4 2 8 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
assessment/surveys Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Provide emergency rescue boat. Risk Reduction - N/A
Engineering - establish coomunication via radio to crew at shore area. Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
99_Piping (PIP)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Risk Reduction - - 26071-100-GPP-GHX-00004-001 HSE Training Procedure Risk Reduction - To provide site specific procedure
Administrative - Method statement, PTW, JSA, Daily TBM Administrative for working near or over water
- To follow basic sea survival (BSS) or similar training including the specific emergency
rescue plan.
100_Piping (PIP)