HIRA Registration No. : RDMP BALIKPAPAN PROJECT Prepared by: Reviewed by: Reviewed by: Approved by : Risk Category
Revision No. : 004
Revision Purpose : Change to activity wise High 15 - 25
Moderate to High 10 – 12
Node (Unit) : Control & Instrument (INS) Moderate 5–9
Date : 30-May-20 Low to Moderate 4
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
PPE Use specific PPE: mechanical protection hand gloves PPE N/A
2 Ergonomic hazard due to OS 1 Improper position to carry out illness ( Musculokeletal 1 Health (H) INS-H-1.2.1.1 Y 1. Manpower Minister Regulation 5 / 3 2 6 M N Elimination N/A 2 1 2 L Elimination N/A SM / CM
awkward position inspection due to limited space disorders ) 2018 Isolation N/A Isolation N/A
and lead to: 2. Health Minister Regulation 70 / Risk Reduction - N/A Risk Reduction - N/A
- Discomfort at work 2016 Substitution Substitution
- Musculoskeletal disorders 3. Health Minister Regulation 48 / Risk Reduction - - Provide temporary scaffolding (if required) Risk Reduction - N/A
2016 Engineering - provide enough space to carry out the work Engineering
N Area risk 1 Chemical hazards OS 1 Exposed to flammable or toxic - Injury 1 Safety (SA) INS-SA-2.1.1.1 Y 1. Manpower Minister Decision 4 2 8 M N Elimination N/A 3 1 3 L Elimination N/A SM/CM
assessment/surveys gas. E.g. due to leakage - Fatality 187/1999 Isolation N/A Isolation N/A
2. Manpower Minister Regulation No. Risk Reduction - N/A Risk Reduction - N/A
1 / 1980 Substitution Substitution
Risk Reduction - - Provide Gas detector to notice flammable atmosphere. Risk Reduction - N/A
Engineering - Fire protection system ( Fire extinguisher, Fire truck etc ) Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00033-000 Hot Work Procedure Risk Reduction - N/A
Administrative - 26071-100-GPP-GCC-00004-002 SIMOPS Plan for ISBL-OSBL Administrative
- MP2-ETP-HSE-GS-0002-00-2019 Hazardous Material Handling
- Method statement, PTW, JHA, Daily TBM
- Emergency response training
- Nearest assembly point and windsock location
PPE Use specific PPE: fire retardant coverall, gas mask. PPE N/A
N Area risk 2 Fire & explosion PS 1 Ignition sources introduced to Fire & explosion 1 Production Loss (PL) INS-PL-2.2.1.1 N 3 3 9 M N Elimination Good housekeeping practice to remove flammable and combustible material at 2 1 2 L Elimination N/A SM/CM
assessment/surveys the flammable atmosphere can surrounding workplace.
caused fire & explosion Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - N/A Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00033-000 Hot Work Procedure Risk Reduction - N/A
Administrative - 26071-100-GPP-GCC-00004-002 SIMOPS Plan for ISBL-OSBL Administrative
- Method statement, PTW, JHA, Daily TBM
- Emergency response training
- Nearest assembly point and windsock location
3 Pulling cable at off shore area Refer to above for pulling cable
N Area risk 1 Drowned hazard OS 1 People drown in the water/sea Injury to fatality 1 Safety (SA) INS-SA-3.1.1.1 N 4 2 8 M N Elimination N/A 3 1 3 L Elimination N/A SM/CM
assessment/surveys Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Provide emergency rescue boat. Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00002-001 Project Emergency Handling Procedure Risk Reduction - To provide site specific procedure
Administrative (PEHP) Administrative for working near or over water
- Method statement, PTW, JSA, Daily TBM including the specific emergency
- To follow basic sea survival (BSS) or similar training rescue plan.
- establish coomunication via radio to crew at shore area
PPE Specific PPE: life floatation devices PPE N/A
A Area risk 2 Extreme weather OS 1 Heavy rain, storm, tsunami will Fatality 1 Safety (SA) INS-SA-3.2.1.1 Y 1.Health Minister Regulation No. 48 4 2 8 M N Elimination N/A 3 1 3 L Elimination N/A SM/CM
assessment/surveys directly expose to the activity at /2016 Isolation N/A Isolation N/A
over or near water/sea 2. Health Minister Regulation No 10 / Risk Reduction - N/A Risk Reduction - N/A
2018 Substitution Substitution
Risk Reduction - - Provide windsock Risk Reduction - N/A
Engineering - Anemometer provided Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - Method statement, PTW, JSA, Daily TBM. Risk Reduction - To provide site specific procedure
Administrative - Weather forecast to be considered. Administrative for working near or over water.
Risk Reduction - - Provide temporary scaffolding (if required) Risk Reduction - N/A
Engineering - provide enough space to carry out the work Engineering
Risk Reduction - Substitute manual lifting with lifting aid such as forklift, hoist, etc. Risk Reduction - N/A
Substitution Substitution
Risk Reduction - Manual lifting by more than one person (team work lifting) Risk Reduction - N/A
Engineering Engineering
Property damage 2 Safety (SA) INS-SA-4.2.1.2 Y Government Regulation No 11 Thn 2 2 4 L-M N Elimination Improve soil condition to remove water stagnan. 1 1 1 L Elimination N/A Construction Manager
1979
Risk Reduction - Maintain ground condition always in flat/even condition. Risk Reduction - N/A
Engineering Engineering
Work process reviews/task- 3 Pinch point OS 1 Pinch by tools and drilling Injury 1 Safety (SA) INS-SA-4.3.1.1 1. Manpowe Minister Regulation 2 3 6 M N Elimination N/A 1 1 1 L Elimination N/A Construction Manager
based risk assessment equipment during 05/2018
loading/unloading or 2. Manpower and transmigrations
assembly/dissasembly minister Regulation 01/1980 Isolation N/A Isolation N/A
3. Manpower Minister 08/2010
Area risk 4 Slip, trip & fall hazards OS 1 '- Poor housekeeping Personal injury 1 Safety (SA) INS-SA-4.4.1.1 Y 1. Government Regulations No 11 2 2 4 L-M N Elimination Practice good housekeeping at surrounding loading/unloading area 1 1 1 L Elimination N/A
assessment/surveys - scattered materials Thn 1979
- slippery surface
Isolation N/A Isolation N/A
Hazard identification 5 Electrical hazard OS 1 Electric current from equipment Electric shock and personal 1 Safety (SA) INS-SA-5.1.1.1 Y 1. Manpower Minister Regulation No 2 3 6 M N Elimination N/A 1 1 1 L Elimination N/A Construction Manager
continually reviewed injury 33 tahun 2015
Isolation Implement LOTO Isolation N/A
Risk Reduction - - Fall protection sysytem installation ( Safety net, Life line ) Risk Reduction - N/A
Engineering -Provide pulley to lift and lowering material and tools Engineering
-Proper storage (secure) of tools and material at elevated arae.
Hazard identification OS 2 Scaffolding collapse - Property damage 1 Financial (F) INS-F-4.6.2.1 Y 1. Manpower Minister Regulation No. 4 3 12 M-H N Elimination N/A 2 1 2 L Elimination N/A SM/ CM
continually reviewed - Tools & equipment 09 / 2016
damage 2. Manpower Minister Regulation No.
1 / 1980 Isolation N/A Isolation N/A
Risk Reduction - - Fall protection sysytem installation ( Safety net, Life line ) Risk Reduction - N/A
Engineering - Provide pulley to lift and lowering material and tools Engineering
- Proper storage (secure) of tools and material at elevated arae.
Learning from event analysis 7 Lifting & Rigging hazards OS 1 - Lifting failure hit the workers Injury, Fatality 1 Safety (SA) INS-SA-4.7.1.1 Y 1. Manpower Minister Regulation No. 4 3 12 M-H N Elimination N/A 3 1 3 L Elimination N/A SM/ CM
around. 5 / 1985
- Lifting failure due to crane 2. Manpower Minister Regulation 9 /
overload 2010 Isolation N/A Isolation N/A
- Pinched
Risk Reduction - Provide good surface / soil condition for crane stability ( put additional plate if Risk Reduction - N/A
Engineering necessary ) Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00017-001 Barricade and Signboard Procedure Risk Reduction -
Administrative - 26071-100-GPP-GHX-00011-000 Crane & Lifting Operation Procedure Administrative
- MP2-ETP-HSE-GP-0005-00-2019 Project HSSE Plan
- Valid Crane certificate ( incl load test result )
- Certified competence Operator & Rigger ( incl SIO, SILO )
- Method statement, JSA, PTW, Daily TBM.
- Lifting plan for critical lift
- Lifting gears inspection ( valid color code )
- Install warning sign and barricade at surrounding area.
- Pre mobilization inspection.
- Preuse checklist by crane operator.
- Trained Flagman / banksman
- Valid JO pass inspection
Learning from event analysis OS 2 - Crane collapse. - Property damage 1 Financial (F) INS-F-4.7.2.1 Y 1. Manpower Minister Regulation No. 4 3 12 M-H N Elimination N/A 2 1 2 L Elimination N/A SM/ CM
- Crane tipping over - Equipment damage 5 / 1985
2. Manpower Minister Regulation 9 /
2010 Isolation N/A Isolation N/A
Risk Reduction - Provide good surface / soil condition for crane stability ( put additional plate if Risk Reduction - N/A
Engineering necessary ) Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00017-001 Barricade and Signboard Procedure Risk Reduction -
Administrative - 26071-100-GPP-GHX-00011-000 Crane & Lifting Operation Procedure Administrative
- Valid Crane certificate ( incl load test result )
- Certified competence Operator & Rigger ( incl SIO, SILO )
- Method statement, JSA, PTW, Daily TBM.
- Lifting plan for critical lift
- Lifting gears inspection ( valid color code )
- Install warning sign and barricade at surrounding area.
- Pre mobilization inspection.
- Preuse checklist by crane operator.
- Trained Flagman / banksman
- Valid JO pass inspection
N Work process reviews/task- 8 Biological hazard H 1 Mosquito bite Infected to a diseases 1 Health (H) INS-H-4.8.1.1 N 2 3 6 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
based risk assessment caused by mosquitoes- Isolation N/A Isolation N/A
N Area risk 1 Chemical hazards OS 1 Exposed to flammable or toxic - Injury 1 Safety (SA) INS-SA-5.1.1.1 Y 1. Manpower Minister Decision 4 2 8 M N Elimination N/A 3 1 3 L Elimination N/A SM/CM
assessment/surveys gas. E.g. due to leakage - Fatality 187/1999 Isolation N/A Isolation N/A
2. Manpower Minister Regulation No. Risk Reduction - N/A Risk Reduction - N/A
1 / 1980 Substitution Substitution
Risk Reduction - N/A Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00033-000 Hot Work Procedure Risk Reduction - N/A
Administrative - 26071-100-GPP-GCC-00004-002 SIMOPS Plan for ISBL-OSBL Administrative
- MP2-ETP-HSE-GS-0002-00-2019 Hazardous Material Handling
- Method statement, PTW, JHA, Daily TBM
- Emergency response training
- Nearest assembly point and windsock location
PPE Use specific PPE: fire retardant coverall, gas mask. PPE N/A
N Area risk 2 Ignition sources hazard PS 1 Ignition sources introduced to Fire & explosion 1 Production Loss (PL) INS-PL-5.2.1.1 N 3 3 9 M N Elimination Good housekeeping practice to remove flammable and combustible material at 2 1 2 L Elimination N/A SM/CM
assessment/surveys the flammable atmosphere can surrounding workplace.
caused fire & explosion Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - N/A Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00033-000 Hot Work Procedure Risk Reduction - N/A
Administrative - 26071-100-GPP-GCC-00004-002 SIMOPS Plan for ISBL-OSBL Administrative
- Method statement, PTW, JHA, Daily TBM
- Emergency response training
- Nearest assembly point and windsock location
6 Installation instrument devices at off shore area Refer to above for Installation instrument devices
N Area risk 1 Drowned hazard OS 1 People drown in the water/sea Injury to fatality 1 Safety (SA) INS-SA-6.1.1.1 N 4 2 8 M N Elimination N/A 3 1 3 L Elimination N/A SM/CM
73_Control Instrument (INS)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
PPE Use specific PPE: mechanical protection hand gloves PPE N/A
Area risk 2 Slip, trip, falls hazard OS 1 Slip, trip and falls due to Injury 1 Safety (SA) INS-SA-7.2.1.1 Y - Health Minister Regulation No. 48 2 2 4 L-M N Elimination Good housekeeping 1 1 1 L Elimination N/A SM/CM
assessment/surveys uneven level of platform /2016 Isolation N/A Isolation N/A
- Health Minister Regulation No 10 / Risk Reduction - N/A Risk Reduction - N/A
2018 Substitution Substitution
Risk Reduction - N/A Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-G01-GHX-00002-002 Project HSE Plan Risk Reduction - N/A
Administrative - MP2-ETP-HSE-GP-0005-00-2019 Project HSSE Plan Administrative
- Method statement, PTW, JSA, Daily TBM, PTW
- Safety bulletin (slip, trip, falls hazard)
- Install warning sign
- Maintain surface condition flat/level and non slippery
PPE Use specific PPE: face shield, welding mask, leather/ combination gloves ( PPE N/A
Apron )
A Hazard identification 6 Gas bottle pressurized OS 1 Explosion hazard caused by - Injury to fatality 1 Safety (SA) INS-SA-7.6.1.1 Y Manpower Minister Regulation No. 1 4 2 8 M N Elimination N/A 3 1 3 L Elimination N/A SM/CM
continually reviewed hazard wrong handling pressurize gas - Property damage / 1980 Isolation N/A Isolation N/A
cylinder ( dropping, hitting, Risk Reduction - N/A Risk Reduction - N/A
rolling ) Substitution Substitution
Risk Reduction - - Use hand truck and chain Risk Reduction - N/A
Engineering - Use proper cradles, nets or platforms if using a crane. Engineering
PPE Use specific PPE: face shield, welding mask, leather/ combination gloves PPE N/A
PPE N/A PPE N/A
N Hazard identification 7 Chemical hazard H 1 Metal fume - Short-term exposure can 1 Health ( H ) INS-H-7.7.1.1 Y Manpower Minister Regulation No. 1 3 3 9 M N Elimination N/A 2 1 2 L Elimination N/A SM/CM
continually reviewed result in nausea, dizziness, / 1980 Isolation N/A Isolation N/A
or eye, nose and throat Risk Reduction - N/A Risk Reduction - N/A
irritation. Substitution Substitution
- Prolonged exposure to Risk Reduction - - Provide blower / exhaust Risk Reduction - N/A
welding fumes can lead to Engineering Engineering
cancer of the lung, larynx Risk Reduction - Process N/A Risk Reduction - Process N/A
and urinary tract, as well as change change
nervous system and kidney Risk Reduction - - 26071-100-GPP-GHX-00013 Cutting, Welding and Grinding Procedure Risk Reduction - N/A
damage Administrative - Method statement, JSA,PTW, Daily TBM Administrative
- Install warning sign
PPE Use specific PPE: face shield, respirator mask PPE N/A
N H 2 Carbon Monoxide ( CO ) gas 1 Health ( H ) IN-H-7.7.2.1 Y Manpower Minister Regulation No. 1 3 3 9 M N Elimination N/A 2 1 2 L Elimination N/A SM/CM
come out form welding machine / 1980 Isolation N/A Isolation N/A
muffler Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Provide blower / exhaust ( for indoor activity ) Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00013 Cutting, Welding and Grinding Procedure Risk Reduction - N/A
Administrative - Method statement, JSA,PTW, Daily TBM Administrative
- Install warning sign CO gas poisonous
8 Callibration of instrument device N Work process reviews/task- 1 Biological hazard H 1 Mosquito bite Infected to a diseases 1 Health (H) INS-H-8.1.1.1 N 2 3 6 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
based risk assessment caused by mosquitoes- Isolation N/A Isolation N/A
borne diseases such as Risk Reduction - N/A Risk Reduction - N/A
dengue fever and malaria Substitution Substitution
Risk Reduction - - Fogging program Risk Reduction - N/A
Engineering - Using insect repellents Engineering
N Area risk 1 Chemical hazards OS 1 Exposed to flammable or toxic - Injury 1 Safety (SA) INS-SA-9.1.1.1 Y 1. Manpower Minister Decision 4 2 8 M N Elimination N/A 3 1 3 L Elimination N/A SM/CM
assessment/surveys gas. E.g. due to leakage - Fatality 187/1999 Isolation N/A Isolation N/A
2. Manpower Minister Regulation No. Risk Reduction - N/A Risk Reduction - N/A
1 / 1980 Substitution Substitution
Risk Reduction - - Provide Gas detector to notice flammable atmosphere. Risk Reduction - N/A
Engineering - Fire protection system ( Fire extinguisher, Fire truck etc ) Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00033-000 Hot Work Procedure Risk Reduction - N/A
Administrative - 26071-100-GPP-GCC-00004-002 SIMOPS Plan for ISBL-OSBL Administrative
- MP2-ETP-HSE-GS-0002-00-2019 Hazardous Material Handling
- Control of ignition sources coming from drilling activities
- Gas check using gas detector by authorize gas tester
- Fire watcher available
- Method statement, PTW, JHA, Daily TBM
- Emergency response training
- Nearest assembly point and windsock location
- Close communication with Pertamina RU-V area authority
PPE Use specific PPE: fire retardant coverall, gas mask. PPE N/A
N Area risk 2 Ignition sources hazard PS 1 Ignition sources introduced to Fire & explosion 1 Production Loss (PL) INS-PL-9.2.1.1 N 3 3 9 M N Elimination - Remove flammable and combustible material at surrounding workplace. 2 1 2 L Elimination N/A SM/CM
76_Control Instrument (INS)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
A Learning from event analysis OS PS 2 Fire incident at brownfield area Bad reputation 1 Reputation (RE) INS-RE-9.2.2.1 Y Manpower Minister Regulation No. 1 3 3 9 M N Elimination N/A 3 1 3 L Elimination N/A SM/CM
recorded by unauthorize people / 1980 Isolation N/A Isolation N/A
and share in the social media Risk Reduction - N/A Risk Reduction - N/A
without permission Substitution Substitution
Risk Reduction - N/A Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - Have good oordination with local government & client in related with Risk Reduction - N/A
Administrative transportation at public road/area Administrative
- Community development programs
- Establish good relation with local media
10 Troubleshooting of instrument A Area risk 1 Confined space Hazard ( OS 1 - Oxygen defiency ( Lack of - Asphyxiation 1 Safety (SA) INS-SA-10.1.1.1 Y - Manpower Minister Regulation No. 4 3 12 M-H N Elimination Depressurizing and remove gases in the confined space, Flushing 3 1 3 L Elimination N/A SM/CM
devices assessment/surveys Chemical hazard ) oxygen, Below 19.5% ) - Unconscious to Fatality 1 / 1980
- Exposed to Toxic gas ( such - Manpower Minister Regulation No
as : H2S ) 113/DJPPK/IX/2006 Isolation Implementation of LOTO Isolation N/A
Risk Reduction - Substitute atmosphere inside confined space with fresh air Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Provide multigas detector Risk Reduction - N/A
Engineering - Provide blower for fresh air circulation inside confined space Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00010-001 Lock Out Tag Out (LOTO) Procedure Risk Reduction - Provide site specific procedure for
Administrative - MP2-ETSP-HSE-GP-0004-00-2019 LOTO Administrative confined space
- Method statement, JSA, PTW, Daily TBM.
- Caution sign: confined space, Do not enter, Authorize person only
- Competence authorize gas detector.
- Trained standby man / Entry watcher
- Trained confined space entrant
- Barricade or close the man hole when not occupied
- Confined space rescue plan for inert confined space
- Dedicated ERT and equipment for the confined space rescue
- Buddy system
- Continue gas monitoring
PPE - Breathing apparatus such as SCBA set for rescue PPE N/A
- Work unit breathing apparatus such as airline for working at inert confined
space
- Half mask with specific respirator (if required)
A Area risk Confined space Hazard OS 2 Lack of access to get - Serious injury 1 Safety (SA) INS-SA-10.1.2.1 Y - Manpower Minister Regulation No. 4 3 12 M-H N Elimination Lone working not allowed inside the confined space 3 1 3 L Elimination N/A SM/CM
assessment/surveys (Lone working hazard) immediate response during - fatality 1 / 1980
emergency condition, will loose - Manpower Minister Regulation No
the rescue golden time. 113/DJPPK/IX/2006 Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - N/A Risk Reduction - N/A
Engineering Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-G01-GHX-00002-002 Project HSE Plan Risk Reduction - Provide site specific procedure for
Administrative - Method statement, JSA, PTW, Daily TBM. Administrative confined space
- Standby man
- Buddy system
PPE - Breathing apparatus such as SCBA set for rescue PPE N/A
- Work unit breathing apparatus such as airline for working at inert confined
space
- Half mask with specific respirator (if required)
Work process reviews/task- OS Property damage 2 Financial (F) INS-F-10.2.1.2 Y 1. Manpower Minister Regulation No. 3 2 6 M N Elimination Depressurizing and remove gases in the confined space, Flushing 2 1 2 L Elimination N/A SM/CM
based risk assessment 1 / 1980
Isolation Implementation of LOTO Isolation N/A
2 Manpower Minister Regulation No
PPE - Breathing apparatus such as SCBA set for rescue PPE N/A
- Work unit breathing apparatus such as airline for working at inert confined
space
- Half mask with specific respirator (if required)
A Learning from event analysis 3 illumination hazard H 1 Inadequate lighting lead to eye illness 1 Health (H) INS-H-10.3.1.1 Y 1. Manpower Minister Regulation No. 2 3 6 M N Elimination N/A 1 1 1 L Elimination N/A SM/CM
disorders, headaches and may 1 / 1980
contribute to depression 2. Manpower Minister Regulation No
113/DJPPK/IX/2006 Isolation N/A Isolation N/A
Risk Reduction - - Provide adequate explosion prooflighting in confined space Risk Reduction - N/A
Engineering Engineering
N Area risk 4 Extreme temperature OS 1 Heat stress Dehydration 1 Health (H) INS-H-10.4.1.1 Y - Manpower Minister Regulation No. 4 2 8 M N Elimination N/A 3 1 3 L Elimination N/A SM/CM
assessment/surveys 1 / 1980
- Manpower Minister Regulation No
113/DJPPK/IX/2006 Isolation N/A Isolation N/A
A Hazard identification 5 Electrical Hazard OS 1 - insulation cable damage - Electric shock 1 Safety (SA) INS-SA-10.5.1.1 Y - Manpower Minister Regulation No. 4 2 8 M N Elimination N/A 3 1 3 L Elimination N/A SM/CM
continually reviewed - Fatality 1 / 1980
- Manpower Minister Regulation No
113/DJPPK/IX/2006 Isolation N/A Isolation N/A
Risk Reduction - Only low voltage equipment/tools shall be used within confined space Risk Reduction - N/A
Substitution Substitution
N Hazard identification 6 Slips and trips hazard OS 1 Collided by object Injury 1 Safety (SA) INS-SA-10.6.1.1 Y - Manpower Minister Regulation No. 3 3 9 M N Elimination N/A 3 1 3 L Elimination N/A SM/CM
continually reviewed 1 / 1980
- Manpower Minister Regulation No
113/DJPPK/IX/2006
Isolation Implement LOTO to deenergize moving object inside confined space Isolation N/A
Risk Reduction - Provide adequate illumination/lighting inside the confined space Risk Reduction - N/A
Engineering Engineering
N Hazard identification 7 Ergonomic hazard H 1 Awkward posture illness ( Musculokeletal Health (H) INS-H-10.7.1.1 Y - Manpower Minister Regulation No. 3 3 9 M N Elimination N/A 3 1 3 L Elimination N/A SM/CM
continually reviewed disorders ) 1 / 1980
- Manpower Minister Regulation No
Isolation N/A Isolation N/A
113/DJPPK/IX/2006
Risk Reduction - - Provide temporary scaffolding (if required) Risk Reduction - N/A
Engineering - provide enough space to carry out the work Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-G01-GHX-00002-002 Project HSE Plan Risk Reduction - Provide site specific procedure for
Administrative - 26071-100-G01-GHX-00005-001 Health Management Plan Administrative confined space
- Method statement, PTW, JSA, Daily TBM
- Regular short break and exercise after having awkward position
11 Troubleshooting of instrument devices at brownfield area Refer to above for troubleshooting of instrument devices
N Area risk 1 Chemical hazards OS 1 Exposed to flammable or toxic - Injury 1 Safety (SA) INS-SA-11.1.1.1 Y 1. Manpower Minister Decision 4 2 8 M N Elimination N/A 3 1 3 L Elimination N/A SM/CM
assessment/surveys gas. E.g. due to leakage - Fatality 187/1999 Isolation N/A Isolation N/A
2. Manpower Minister Regulation No. Risk Reduction - N/A Risk Reduction - N/A
1 / 1980 Substitution Substitution
Risk Reduction - - Provide Gas detector to notice flammable atmosphere. Risk Reduction - N/A
Engineering - Fire protection system ( Fire extinguisher, Fire truck etc ) Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00033-000 Hot Work Procedure Risk Reduction - N/A
Administrative - 26071-100-GPP-GCC-00004-002 SIMOPS Plan for ISBL-OSBL Administrative
- Method statement, PTW, JHA, Daily TBM
- Emergency response training
- Nearest assembly point and windsock location
PPE Use specific PPE: fire retardant coverall, gas mask. PPE N/A
N Area risk 2 Ignition sources hazard PS 1 Ignition sources introduced to Fire & explosion 1 Production Loss (PL) INS-PL-11.2.1.1 N 3 3 9 M N Elimination Good housekeeping practice to remove flammable and combustible material at 2 1 2 L Elimination N/A SM/CM
assessment/surveys the flammable atmosphere and surrounding workplace.
can caused fire & explosion Isolation N/A Isolation N/A
Risk Reduction - N/A Risk Reduction - N/A
Substitution Substitution
Risk Reduction - - Provide Gas detector to notice flammable atmosphere. Risk Reduction - N/A
Engineering - Fire protection system ( Fire extinguisher, Fire truck etc ) Engineering
Risk Reduction - Process N/A Risk Reduction - Process N/A
change change
Risk Reduction - - 26071-100-GPP-GHX-00033-000 Hot Work Procedure Risk Reduction - N/A
Administrative - 26071-100-GPP-GCC-00004-002 SIMOPS Plan for ISBL-OSBL Administrative
- Method statement, PTW, JHA, Daily TBM
- Emergency response training
- Nearest assembly point and windsock location