As Lantai 1 As

a
k as

BL vasi b
jan
tipe
Jara

Pa n

ele
1(A-B) 2.57 S1 2.27
1(B-D) 3 S1 2.8
1(D-F) 3 S1 2.8
1(F-G) 4.38 S2 4.18

2(A-B) 2.57 S2 2.245


2(B-D) 3 S1 2.775
2(D-F) 3 S1 2.8
2(F-G) 4.38 S2 4.18

2'(A-B) 2.57

3(A-C) 3.07 S1 2.745


3(C-F) 5.5 5.275
3(E-F) 2 S1 1.9
3(F-G) 4.38 S2 4.18

3'(A-C)

4(A-C) 3.07 S1 2.77


4(C-E) 3.5 S1 3.3
4(E-F) 2 1.84

5(A-C) 3.07 S2 2.745


5(C-E) 3.5 S1 3.275

5'(A'-C) 1.5 S1 1.38

A(1-2) 3.58 S1 3.28


A(2-3) 2.5 S1 2.3
A(3-5) 3.63 S2 3.43
A(5-5') 0.75 S1 0.65

A'(3-5) 3.63 S1 3.43


A'(5-5') 0.75 S1 0.65

B(1-2) 3.58 S1 3.28


B(2-3) 2.5 2.2

C(2-3) 2.5 S1 2.275


C(3-5) 3.63 S3 3.38
C(3-4) 2
C(4-5) 1.63 S3
C(5-5') 0.75 S1 0.625

D(1-2) 3.58 S1 3.28


D(2-4)
D(3-4)

E(3-4) 2 S1 1.7
E(4-5) 1.63 S1 1.33

F(1-2) 3.58 S1 3.28


F(2-3) 2.5 S1 2.2
F(3-4) 2 1.7

G(1-2) 3.58 S1 3.28


G(2-3) 2.5 S1 2.2
G(3-3') 1 0.9

0 0 0 0

K-500 (f'c=41.5MPa) 1 2 3 4
N P L
P1 22 1 1
P2 20 1.5 0.75
K-225 (f'c=18,675 MPa) POER
0
0
P L
K1 0.25 0.25
K2 0.25 0.25
K-225 (f'c=18,675 MPa)
KOLOM

KP1 0 0.2 0.12


KP 0.12 0.12
0 0

1 2 3 4
MUTU BETON RABAT K-175 (f'c=14,5MPa)

L(m) T(m)
S1 0.15 0.25
S2 0.15 0.2

0
0
0

L1 (m) T1 (m) L2 (m) T2 (m)


B1 0.20 0.30
B2 0.20 0.30
BR 0.12 0.20
BA 0.10 0.50
BB 0.35 0.15

0 0 0

1 2 3 4 5
RONG Lebar tinggi Luas Lt. 1
P-1 1.90 2.70 5.13 7.00
P-2 0.98 2.70 2.65 16.00
P-3 0.78 2.70 2.11 5.00
J-1 0.98 1.80 1.76 9.00
BV 0.83 0.53 0.44 2.00
BV-1 1.52 0.61 0.93 10.00
Panjang
SC-1 2.25 2.00
SC-2 2.65 4.00
SC-3 2.74 8.00
SC-4 3.38 8.00
DP 14.70 3.80 47.92
0

sloof to +0.00 +0.00 m to lt. 2


Tinggi pasangan bata 0.5 4
1I
2 II
3 III
4 IV
5V
6 VI
7 VII
8 VIII
9 IX
10 X
11 XI
12 XII
13 XIII
14 XIV
15 XV
16 XVI
17 XVII
18 XVIII
19 XIX
20 XX
5 6 7 8 9 10 11 12 13
tai

m
v.

v.

v.

v.
k

.0 4 o k

.9 5 o k

.7 5 o k
la

Ele

Ele

le

le
i BL Balo

90
L e l ok
v. 2 ba l

v. 3 ba l

v. 5 ba l
5m kE

5m kE
m
lok

. 6.
a i B Ba l
4m k

5m k
2.0 e balo

3.9 e balo

5.7 e balo

7.9 e balo
a

Ele njang

Ele njang

Ele njang
latanjang
BL vasi b

Lat njang
Pa

Pa

Pa
Pa

Tip

Tip

Tip

Tip
ele

Pa
B4 2.27 B4 2.27 B4 2.27
B4 2.8
B4 2.8
B5 4.18

B3A 2.245
Elev. 2.90m 2.7 B4 2.775 2.7
Elev. 2.90m 2.7 B4 2.8 2.7
B4 4.18

Elev. 2.90m 2.745 B4 2.745 2.745


B4 5.275

B5 4.18 4.18

Elev. 2.90m 2.89 B1 2.87 2.89


B6 2.16 B5 3.3 3.34
B5 1.9

Elev. 2.90m 2.745 B3 2.745 2.845


B4A 3.175

B2 1.38

B4 3.28
B4 2.2
B4 3.33
B2 0.45

B1 3.33
B2 0.65

B4 3.255

Elev. 2.90m 2.315 B4 2.3 2.3


B5 3.405

Elev. 2.90m 1.445 1.445


B2 0.625

B3 3.355
B4 4.1

Elev. 2.90m 1.84


B4A 1.43

B4 3.28
B4 2.2 2.3
B4 1.9

B4 3.28
B4 2.2

0 0 0 0 0 0 0 0 0

5
T
0.3
0.3

T LT1 LT2 LT3


22
20

4
1

46
5 6 7 8 9 10 9 10 11
6 7 benangan Plesteran
Lt. 2 Lt. 3 benangan sisi T panjang L Luas
7.3 2 102.20 0.15 15.33
6.38 2 204.16 0.15 30.62
6.18 2 61.80 0.15 9.27
5.56 2 100.08 0.15 15.01
2.72 2 10.88 0.15 1.63
4.26 2 85.20 0.15 12.78

- 564.32 84.65
14 15 16 17 18 19 20 21 22

sd
5

5
m

90
v.

.65 atai

g
ok
.9 5 o k

9.1

8.9

din

i
m ai BL Balok
le

m ai BR1 Balok

m ai BR1 Balok

0m Tingg
65

10 .
L e l ok

g B Ba l
v. 7 ba l
5m kE

v. 8 k l
m

Din
el.

el.
. 8.
a i B Ba l

el.
Ele e balo
7.9 e balo

Ele njang

Rin njang
Lat njang
Lat njang

Lat njang

el. DING
2

g
Lat njang

jan

0 .0
Tip
Pa

Pa
Tip

Pa n
Pa

D IN
Pa

Pa
Pa
B4 2.27 2.37 2.27
B4 2.8 2.8 2.8
B4 2.8 2.8 2.8
B4 4.18 4.18 4.18

B3A 2.245
2.775
2.8

B1 2.27 2.45 2.57

B4 2.745 2.745
B4 5.275 5.275
1.9 1.9
B4 4.18 4.18

B1 2.77

2.77
B5 3.3 BR1 3.275 3.3
B5 1.8 BR1 1.775

B4 2.745 BR1 1.41 2.745


B4A 3.175 BR1 3.275 3.275

B2 1.38 1.5 1.38

B4 3.28 3.38 3.28


B4 2.3 2.3 2.3
B4 3.43 BR 3.43 3.43
B2 0.65 BR 0.59 0.65

3.43
B2 0.65 0.65 0 0.65

B4 3.28 3.38 3.28


B4 2.3 3.3

2.275
B5 3.38 3.38

B2 0.625 0.625 0 0.625

3.28

B4 1.8

1.7
B4A 1.43 BR1 1.43 1.33

3.28
2.2
B4 1.8 BR1 2 1.7

B4 3.28 3.28
B4 2.2 2.2
0.9

0 0 0 0 0 0 0 0 0

9 10 9 11 11 11 11 11
23 24 25 26 27 28 29 30 31 32
sd

1
m

1
g

ing

ing

LT.
v. 0 i

v. 4 i

v. 8 i
din
i

LT.
.0 0

.0 0

.0 0
ele Tingg

ele Tingg

ele Tingg
0m Tingg

ind

ind

i or
Din

i or
jan

jan
gD

gD

ter
dia DING

dia DING

dia DING
el. DING

ter
g

Pan

Pan
jan

jan

jan

esk
in
0 .0

tas

tas

tas
Pa n

Pa n

Pa n
D IN

D IN

D IN
D IN

Cat

Cat
0.45 2.27 #N/A 2.27 #N/A 2.27 #N/A 2.45 4 2.57
0.45 2.8 #N/A 2.8 #N/A 2.8 #N/A 2.88 3.4 3
0.45 2.8 #N/A 2.8 #N/A 2.8 #N/A 2.88 4.4 3
0.45 4.18 #N/A 4.18 #N/A 4.18 #N/A 4.26 3.83 4.38

1.1225 #N/A 2.45 0.6


0.45 2.775 #N/A 2.775 4 2.88 6.8
0.45 2.8 #N/A 2.8 4 2.88 6.8

2.45 #N/A

0.45 2.745 #N/A 2.745 #N/A 2.95 3.4


5.275 0.62
0.45 1.9 4 1.9 3.88 1.88 3.4 2
4.18 0.62

0.45 2.77 3.7 2.77 3.88 2.77


0.45 3.3 #N/A 3.3 #N/A 3.3 #N/A 3.38 3.4
1.9 #N/A 1.74 #N/A 2

0.45 2.745 #N/A 2.745 #N/A 2.745 #N/A 3.07


0.45 3.275 #N/A 3.275 3.275 3.5

0.45 1.38 3.7 1.38 3.7 1.38 #N/A 1.5

0.45 3.28 #N/A 3.28 #N/A 3.28 #N/A 3.46 4 3.58


0.45 2.3 #N/A 2.3 #N/A 2.3 #N/A 2.38 3.4 2.5
0.45 3.43 #N/A 3.43 #N/A 3.43 #N/A 3.63
0.45 0.65 3.7 0.65 3.7 0.65 #N/A 0.75

0.45 3.43 3.7 3.43 3.88


0.45 0.65 3.7 0.65 3.7 0.75

0.45 3.28 #N/A 3.28 #N/A 3.28 1.48 3.46 7.4


2.2 1.48

0.45
0.45 3.38 #N/A 3.38 #N/A
1.88 3.4
1.63
0.45 0.625 3.7 0.625 3.7 0.75

0.45 3.28 #N/A 3.28 4 3.46 6.8

0.45 1.7 4 1.88 3.4 2


0.45 1.33 #N/A

0.45 3.28 #N/A 3.28 4 3.46 6.8


0.45 2.2 #N/A 2.2 4 2.38 6.8
1.7 1.9 #N/A

0.45 3.28 #N/A 3.28 #N/A 3.28 1.48 3.46 3.4 3.58
0.45 2.2 #N/A 2.2 #N/A 2.2 1.48 2.38 3.4 2.5
0.45 0.9 4 0.9 4 0.9 1 1

0 0 0 0 0 0 0
33 34 35 36 37 38 39 40 41 42
1

T. 3
2

3
LT.

LT.

LT.
LT.

LT.

dL
g

g
i or

i or

i or
i or

i or
jan

jan

jan

jan

f on
ter

ter

ter
ter

ter
Pan

Pan

Pan

Pan

Pla
esk

esk

esk
in

in
Cat

Cat

Cat
Cat

Cat

Cat
4 2.45 4 2.57 4 2.45 4 2.57 4
4 2.88 3.4 3 4 3 2
4 2.88 3.4 3 4 3 2
4 4.26 3.4 4.38 4 4.38 2

2.45 2.6 1.225 2


2.88 6.8
2.88 6.8

2.45 3

2.95 3.4 3.07 0.8


5.5 0.8
4 2 0.8
4.26 3.4 4.38 4 4.38 0.8

3.38 3.4 3.5 4 3.5 2


4 1.88 3.4 2 4 2 2

4 3.07 4
1.2 3.38 0.6 3.5 1.2

4 1.5 4 1.5 2
0
4 3.46 4 3.58 4 3.46 4 3.58 4
4 2.38 3.4 2.5 4 1.25 4 2.5 4
4 3.63 4 3.63 2
8 0.75 8 0.75 2

4 0.75 2

3.46 7.4 3.46 4 3.16 3


1.25 4 1.25 3
1.88 3.4
4 1.63 4 1.63 2
4 0.75 4 0.75 2

3.46 3.4

1.2 2 1.2

3.46 6.8
2.38 6.8
2 4 2 2

4 3.46 3.4 3.58 4 3.58 4


4 2.38 3.4 2.5 4 2.5 4
8 1 8 1 4
43 44

B H
KOLOM 1 0.3 0.3

KOLOM 2 0.3 0.35


KOLOM 2 0.3 0.35

KP 0.12 0.12

tinggi antar lantai 4


h sloof to lantai 0.25

tinggi dinding atas 1.15


tinggi dinding atas RB 0.7

PS 0.6 0.6

P3 1.55 1.65
S2 0.15

0
0
PEKERJAAN TANAH
GalianTanah

Volume
Keterangan P X L X T X Jumlah =
(P*L*T*Jumlah)
Poer
P1 1.20 X 1.20 X 0.70 X 22.00 = 22.176 m³
P2 1.70 X 0.95 X 0.70 X 20.00 = 22.610 m³
Sloof S1 157.59 X 0.35 X 0.25 X 1.00 = 13.789 m132

TOTAL GalianTanah 58.575 m³

Urugan pasir bawah Poer t = 10 cm

Volume
Keterangan P X L X T X Jumlah =
(P*L*T*Jumlah)
Poer
P1 1.20 X 1.20 X 0.10 X 22.00 = 3.168 m³
P2 1.70 X 0.95 X 0.10 X 20.00 = 3.230 m³
0 - X - X - X - = - m³
0 - X - X - X - = - m³

TOTAL Urugan pasir bawah Poer t = 10 cm 6.398 m³

Urugan Tanah Kembali

Keterangan Volume
Galian Tanah 58.58 m3

Faktor Pengurang
Beton poer (13.35) m3
Beton sloof (5.89) m3
Urugan pasir bawah poer (6.40) m3
Urugan pasir bawah sloof m3
Lantai kerja poer (3.37) m3
Lantai kerja sloof (1.97) m3

TOTAL 27.60 m3

Urugan Sirtu Bawah Lantai dan Pemadatan Pakai Stamper

Volume
Keterangan A X T X T X Jumlah =
(P*L*T*Jumlah)

Granit Tile Uk. 60X60 Cm Polished (F1) 217.20 x 0.10 x X 1.00 = 21.720 m³
ranit Tile Uk. 60X60 Cm UnPolished (F2) 215.05 x 0.10 x X 1.00 = 21.505 m³
0 Cm UnPolished (Lantai kamar mandi) F3 13.82 x 0.05 x X 1.00 = 0.691 m³
Pemasangan Floor Hardeneer 5kg/m2 74.97 x 0.15 X 1.00 = 11.245 m³
pengurang
Urugan Tanah Kembali (27.602)

TOTAL Urugan Sirtu Bawah Lantai dan Pemadatan Pakai Stamper 27.558 m³

Urugan pasir bawah lantai bangunan t = 10 cm

Volume
Keterangan P X L X T X Jumlah =
(P*L*T*Jumlah)

Granit Tile Uk. 60X60 Cm Polished (F1) 217.20 x 0.10 x X 1.00 = 21.720 m³
ranit Tile Uk. 60X60 Cm UnPolished (F2) 215.05 x 0.10 x X 1.00 = 21.505 m³
0 Cm UnPolished (Lantai kamar mandi) F3 13.82 x 0.05 x X 1.00 = 0.691 m³
Pemasangan Floor Hardeneer 5kg/m2 74.97 x 0.10 x X 1.00 = 7.497 m³
TOTAL Urugan pasir bawah lantai bangunan t = 10 cm 51.412 m³
Lantai kerja beton wiremesh K-175 (f'c=14,5MPa)
K-175 (f'c=14,5MPa)
Volume
Keterangan Luas X L X T X Jumlah =
(P*L*T*Jumlah)

30.70 X X 0.050 X 1.00 = 1.535 m³


35.70 X X 0.050 X 1.00 = 1.785 m³
P
pintu 0.92 X 0.15 X 0.050 X 3.00 = 0.021 m³
pintu 0.82 X 0.15 X 0.050 X 1.00 = 0.006 m³
pintu 1.32 X 0.15 X 0.050 X 1.00 = 0.010 m³
pintu 1.68 X 0.15 X 0.050 X 1.00 = 0.013 m³

TOTAL Lantai kerja beton wiremesh K-175 (f'c=14,5MPa) 3.369 m³

Plat beton wiremesh tebal 10 cm


K-175 (f'c=14,5MPa)
Volume
Keterangan Luas X L X T X Jumlah =
(P*L*T*Jumlah)

30.70 X X 0.100 X 1.00 = 3.07 m³


35.70 X X 0.100 X 1.00 = 3.57 m³
P
pintu 0.92 X 0.15 X 0.100 X 3.00 = 0.041 m³
pintu 0.82 X 0.15 X 0.100 X 1.00 = 0.012 m³
pintu 1.32 X 0.15 X 0.100 X 1.00 = 0.020 m³
pintu 1.68 X 0.15 X 0.100 X 1.00 = 0.025 m³

TOTAL Plat beton wiremesh tebal 10 cm 6.739 m³


SLOOF
K-225 (f'c=18,675 M

As P X L X T X Jumlah =

Sloof S1
S1 3.38 X 0.15 X 0.250 X 24.000 =
S1 4.75 X 0.15 X 0.250 X 3.000 =
melintang S1 2.65 X 0.15 X 0.250 X 10.000 =
melintang S1 2.65 X 0.15 X 0.250 X 4.000 =
S1 2.74 X 0.15 X 0.250 X 8.000 =
S2 1.85 X 0.15 X 0.200 X 1.000 =
S2 1.35 X 0.15 X 0.200 X 1.000 =

TOTAL 19.37 Sloof S1 - 15 x 25 cm, Mutu K-225 (f'c=18,675 MPa)


s1 S1 - 15 x 25 cm, Mutu K-225 (f'c=18,675 MPa)
s2 S2 - 15 x 20 cm, Mutu K-225 (f'c=18,675 MPa)

Lantai Kerja Sloof T=5Cm


K-175 (f'c=14,5MP

As TIPE P X L X T =

Sloof
S1 3.38 X 0.25 X 0.050 X 24.000 =
S1 4.75 X 0.25 X 0.050 X 3.000 =
S1 2.65 X 0.25 X 0.050 X 10.000 =
S1 2.65 X 0.25 X 0.050 X 4.000 =
S1 2.74 X 0.25 X 0.050 X 8.000 =
S2 1.85 X 0.25 X 0.050 X 1.000 =
S2 1.35 X 0.25 X 0.050 X 1.000 =

TOTAL 19.37 Lantai Kerja Sloof T=5Cm


K-225 (f'c=18,675 MPa)
Volume
( P*L*T)

3.042
0.534
0.994
0.397
0.822
0.056
0.041

5.886 m3
5.790 m3
0.096 m3

K-175 (f'c=14,5MPa)
Volume
( P*L*T)

1.014
0.178
0.331
0.133
0.274
0.023
0.017

1.970 m3
LANTAI 1
KOLOM
Tebal Plat = 0.12 m
K-225 (f'c=18,675 MPa)
Volume L. Pengurang Plat Luas Acian Beton
As Kolom L X P X T X Jumlah =
(P*L*T*Jumlah) ( L*P* Jumlah) (2*P + 2*L ) * (T-T. Plat) * JML
Kolom K1
Atas Lantai
K1 0.25 X 0.25 X 3.50 X 22.00 = 4.81 m³ 1.38 m² 74.36 m²
X X X = - m³ - m² - m²
Bawah Lantai
K1 0.25 X 0.25 X 0.70 X 22.00 = 0.96 m³
K1 0.25 X 0.25 X X = - m³

TOTAL Kolom K1 - 25x25 cm, Mutu K-225 (f'c=18,675 MPa) 5.78 m³ 1.38 m² 74.36 m²
Kolom K2
Atas Lantai
K2 0.25 X 0.25 X 4.00 X 20.00 = 5.00 m³ 1.25 m² 77.60 m²
K2 0.25 X 0.25 X 0.70 X 4.00 = 0.18 m³ 0.25 m² 2.32 m²
Bawah Lantai
K2 0.25 X 0.25 X 0.70 X 20.00 = 0.88 m³
K2 0.25 X 0.25 X X = - m³

TOTAL Kolom K2 - 25x25 cm, Mutu K-225 (f'c=18,675 MPa) 6.05 m³ 1.50 m² 79.92 m²

REKAP FAKTOR PENGURANG KOLOM UNTUK PLAT LANTAI


Faktor Pengurang = Luas

Kolom K1 = 1.38 m2
Kolom K2 = 1.50 m2

Total 2.88 m2

REKAP ACIAN KOLOM


Rekap = Volume

Kolom K1 = 74.36 m2
Kolom K2 = 79.92 m2
TOTAL 154.28 m2

Faktor Pengurang Acian Kolom

Keterangan L x T x Jml = Luas


Dinding 0.15 x 4.00 x = - m2
Balok
- x - 0.12 x 48.00 = - m2
- x - 0.12 x 4.00 = - m2
- x - 0.12 x 42.00 = - m2
- x - 0.12 x 42.00 = - m2
- x - 0.12 x 42.00 = - m2

=
TOTAL - m2

Volume Acian kolom =(Volume Total acian kolom- Faktor Pengurang)*15 %


'= ( 154.28 - - ) * 15 %
'= 23.14 m2
Benangan Beton

Keterangan Jml. Sudut x P x Jumlah = Volume Satuan


Kolom K1 4.00 x 1.10 x 22.00 = 96.80 m1
K2 2.00 x 2.72 x 20.00 = 108.80 m1
K2 2.00 x 0.70 x 4.00 = 5.60 m1

TOTAL BENANGAN 211.20 m1


LANTAI 2 -
BALOK ELEVASI +3.50m

Tebal Plat = 0.10 m Elevasi +3.50m


Volume L. Pengurang Plat Luas Acian Balok Tengah Luas Acian Balok Tepi
As L X T N P =
( P*L*T) ( L*P) (L+2*(T-T.Plat))*P (L+(T-T.Plat)+T)*P
Balok B1
Balok Tengah
AS 0 b1 0.20 X 0.30 24.00 3.38 = 4.87 16.22 48.67
b1 0.20 X 0.30 24.00 2.65 = 3.82 12.72 38.16
b1 0.20 X 0.30 8.00 2.74 = 1.32 4.38 13.15
b1 0.20 X 0.30 2.00 7.66 = 0.92 3.06 9.19

Balok Tepi
- - X - X - = - - -
- - X - X - = - - -

TOTAL Balok B1 - 20x30 cm, Mutu K-225 (f'c=18, 16.43 10.92 m3 36.39 m2 109.18 m2 - m2
Balok B2
Balok Tengah
AS 0 B2 0.20 X 0.30 3.00 4.75 = 0.86 2.85 8.55
B2 0.20 X 0.30 = - - -
melintang
b2 0.20 X 0.30 - = - - -
b2 0.20 X 0.30 = - - -

Balok Tepi
- - X - X - = - - -
- - X - X - = - - -

TOTAL Balok B2 - 20x30 cm, Mutu K-225 (f'c=18, 4.75 0.86 m3 2.85 m2 8.55 m2 - m2

REKAP FAKTOR PENGURANG BALOK UNTUK PLAT


Faktor Pengurang = Luas

Balok B1 = 36.39 m2
Balok B2 = 2.85 m2

Total 39.24 m2
REKAP ACIAN BALOK REKAP BENANGAN BALOK
Rekap = Volume Total Rekap = Volume Total

Balok B1 = 109.18 m2 Balok B1 = 363.92 m'


Balok B2 = 8.55 m2 Balok B2 = 28.50 m'

TOTAL 117.73 m2 TOTAL 392.42 m;


15% 17.66 m2 15% 58.86 m'
Faktor Pengurang Acian balok

Keterangan P x L = Volume
x 0.15 = - m2

TOTAL - m2

Volume Acian balok =(Volume Total acian balok - Faktor Pengurang)


= 117.73 - - )
= 117.73 m2
LANTAI 1
KOLOM PRAKTIS

Volume Panjang Luas Acian


As P X L X T X Jumlah =
( P*L*T*Jumlah) (T*Jumlah) (L*T*2*Jumlah)
KP 0.12 X 0.12 X 4.10 X 1.00 = 0.059 4.100 0.984
X X - X = - - -

TOTAL Kolom KP - 12 x 12 cm K-175 (f'c=14,5MPa) 0.059 m3 4.100 m1 0.984 m2

Volume Panjang Luas Acian


As P X L X T X Jumlah =
( P*L*T*Jumlah) (T*Jumlah) (L*T*2*Jumlah)
KP1 0.20 X 0.12 X 4.10 X 4.00 = 0.394 16.400 3.936
X X - X = - - -

TOTAL Kolom KP1 - 20 x 12 cm K-175 (f'c=14,5MPa) 0.394 m3 16.400 m1 3.936 m2

Balok BR-12x20 cm mutu K-175


Elev. 2.90m
L T Volume Luas Acian
As X X P X Jumlah =
(Lebar) (Tinggi) ( P*L*T) (P*T*2)
1 br 0.12 X 0.20 X 2.280 X 1.000 = 0.055 0.912
1 br 0.12 X 0.20 X 2.150 X 1.000 = 0.052 0.860
1 br 0.12 X 0.20 X 4.650 X 1.000 = 0.112 1.860
1 br 0.12 X 0.20 X 3.850 X 1.000 = 0.092 1.540
1 br 0.12 X 0.20 X 7.050 X 1.000 = 0.169 2.820
1 br 0.12 X 0.20 X 3.850 X 1.000 = 0.092 1.540
1 br 0.12 X 0.20 X 4.650 X 1.000 = 0.112 1.860
1 br 0.12 X 0.20 X 4.380 X 1.000 = 0.105 1.752
2 br 0.12 X 0.20 X 2.280 X 1.000 = 0.055 0.912
4 br 0.12 X 0.20 X 1.420 X 1.000 = 0.034 0.568
4 br 0.12 X 0.20 X 1.850 X 2.000 = 0.089 1.480
5 br 0.12 X 0.20 X 1.850 X 4.000 = 0.178 2.960
5 br 0.12 X 0.20 X 7.050 X 1.000 = 0.169 2.820
6 br 0.12 X 0.20 X 4.580 X 1.000 = 0.110 1.832
6 br 0.12 X 0.20 X 2.650 X 1.000 = 0.064 1.060
6 br 0.12 X 0.20 X 1.850 X 1.000 = 0.044 0.740
A br 0.12 X 0.20 X 3.680 X 1.000 = 0.088 1.472
A br 0.12 X 0.20 X 3.850 X 1.000 = 0.092 1.540
A br 0.12 X 0.20 X 2.350 X 1.000 = 0.056 0.940
A br 0.12 X 0.20 X 1.480 X 1.000 = 0.036 0.592
D br 0.12 X 0.20 X 1.420 X 1.000 = 0.034 0.568
E br 0.12 X 0.20 X 1.380 X 1.000 = 0.033 0.552
F br 0.12 X 0.20 X 1.350 X 1.000 = 0.032 0.540
F br 0.12 X 0.20 X 1.420 X 1.000 = 0.034 0.568
G br 0.12 X 0.20 X 1.420 X 1.000 = 0.034 0.568
I br 0.12 X 0.20 X 1.420 X 1.000 = 0.034 0.568
J br 0.12 X 0.20 X 1.500 X 1.000 = 0.036 0.600
K br 0.12 X 0.20 X 1.680 X 1.000 = 0.040 0.672
M br 0.12 X 0.20 X 1.480 X 1.000 = 0.036 0.592
M br 0.12 X 0.20 X 5.850 X 1.000 = 0.140 2.340

TOTAL Balok BR-12x20 cm mutu K-175 Elev. 2.9 86.670 34.000 m1 2.258 m3 37.628 m2
REKAP ACIAN PLAT

Keterangan = Luasan x 15% = Vol Satuan


Beton Plat Atap - teba = 214.80 x 100% = 214.80 m2
Plafond = x 15% = - m2

214.80 m2
LANTAI 1
PEKERJAAN PASANGAN DINDING TRASRAAM S/D ELEV. 0.00m & PLESTERAN
Pasangan dinding bata Trasraam 1PC : 2 PS (Baru)
Total Pasangan bata
As P x T. Total

elev. S/d. 0.00m


0(N-A') 37.15 x 0.72
0(N-A') 40.15 x 0.50
1(A-M) 31.80 x 0.74
4(A-M) 31.80 x 0.74
5(C-D) 1.85 x 0.74
C(4-5) 1.35 x 0.74
A'(0-7) 13.58 x 0.72
A'(0-7) 15.15 x 0.50
A(1-4) 3.04 x 0.72
C(4-5) 1.00 x 0.72
E(4-5) 1.00 x 0.72
H(4-5) 1.00 x 0.72
J(4-5) 1.00 x 0.72
M(3-4) 1.00 x 0.72
M(4-5) 1.00 x 0.72
N(0-7) 13.58 x 0.72
N(0-7) 15.15 x 0.50

Pasangan dinding bata Trasraam 1PC : 2 PS (Baru)

PEKERJAAN PASANGAN DINDING & PLESTERAN


Pasangan dinding bata 1PC : 4 PS (Baru)
Total Pasangan bata
As P x T. Total

LANTAI 1
1(A-M) 31.80 x 3.95
4(A-M) 31.80 x 3.40
5(C-D) 1.85 x 3.40
C(4-5) 1.35 x 3.40
M(4-5) 1.35 x 3.40
A(0-7) 7.58 x 1.05
A'(0-7) 13.58 x 3.40
A'(0-7) 15.15 x 3.40
A(1-4) 3.04 x 3.95
C(4-5) 1.00 x 3.40
E(4-5) 1.00 x 3.40
H(4-5) 1.00 x 3.40
J(4-5) 1.00 x 3.40
M(3-4) 1.00 x 3.95
M(4-5) 1.00 x 3.95
0(N-A') 37.15 x 0.38
A'(0-7) 13.58 x 0.38
N(0-7) 13.58 x 0.38
GEWEL 2.45 x 1.15
GEWEL 2.45 x 1.15
GEWEL 2.45 x 1.15
GEWEL 2.45 x 1.15
GEWEL 2.52 x 2.28
GEWEL 2.52 x 2.28
Bawah meja beton 0.60 x 0.90
Bawah meja beton 0.60 x 0.90
Bawah meja beton 0.60 x 0.90

TOTAL BRUTO

Faktor Pengurang Dinding


Luasan Openingan

Keterangan L x T. Total

Pintu P-1 1.90 x 2.70


#N/A x #N/A
#N/A x #N/A
Jendela J-1 0.98 x 1.80
#N/A x #N/A
BV-1 1.52 x 0.61

TOTAL OPENINGAN

Luasan KP & BP

Keterangan P. Total P (Biasa) P (Trasram)

- -
- -
TOTAL OPENINGAN

Luasan Pasangan Bata Biasa


Luasan pasangan bata = Luasan Total Pas. Bata - (Luasan openingan + Luasan KP & BP)

Total Pasangan bata 431.61


Pengurang
Luasan Openingan - 52.80
Luasan KP & BP -

TOTAL NETTO PAS. BATA 378.81

Luasan Pasangan Bata Trasram


Luasan pasangan bata = Luasan Total Pas. Bata - (Luasan openingan + Luasan KP & BP)

Total Pasangan bata 143.02


Pengurang
Luasan Openingan -
Luasan KP & BP -

TOTAL NETTO PAS. BATA 143.02


TOTAL PENGGABUNGAN BIASA DAN TRASRAM 521.83

PEKERJAAN PASANGAN DINDING & PLESTERAN (keseluruhan)


Pasangan dinding bata 1PC : 4 PS diatas elevasi +0.30m
Total Pasangan bata
As P x T. Total

-
1(A-M) 31.80 x 3.95
2(L-M) 2.30 x 3.40
3(A-B) 4.38 x 3.40
4(A-M) 31.80 x 3.95
5(C-E) 3.73 x 3.40
5(E-G) 7.05 x 3.40
5(G-I) 3.73 x 3.40
6(A-B) 4.38 x 3.40
6(G-M) 13.14 x 3.40
7(A-M) 33.90 x 3.40
A(1-4) 7.68 x 3.40
A(4-7) 3.88 x 3.40
B(1-4) 7.68 x 3.40
B(4-6) 2.35 x 3.40
C(4-5) 1.25 x 3.40
D(1-4) 7.68 x 3.40
D(4-5) 1.25 x 3.40
E(4-5) 1.25 x 3.40
F(1-4) 7.68 x 3.40
F(4-5) 1.25 x 3.40
G(1-4) 7.68 x 3.40
G(4-5) 1.25 x 3.40
G(5-6) 0.85 x 3.40
H(4-5) 1.25 x 3.40
I(1-4) 7.68 x 3.40
I(4-5) 1.25 x 3.40
J(4-5) 2.35 x 3.40
K(1-4) 7.68 x 3.40
M(1-4) 7.68 x 3.40
M(4-7) 3.88 x 3.40
GEWEL 2.45 x 1.15
GEWEL 2.45 x 1.15
GEWEL 2.45 x 1.15
GEWEL 2.45 x 1.15
GEWEL 2.52 x 2.28
GEWEL 2.52 x 2.28
Bawah meja beton 0.60 x 0.90
Bawah meja beton 0.60 x 0.90
Bawah meja beton 0.60 x 0.90

TOTAL BRUTO

Faktor Pengurang Dinding


Luasan Openingan

Keterangan L x T. Total

Pintu P-1 1.90 x 2.70


P-2 0.98 x 2.70
P-3 0.78 x 2.70
Jendela J-1 0.98 x 1.80
BV 0.83 x 0.53
BV-1 1.52 x 0.61

TOTAL OPENINGAN

Luasan KP & BP

Keterangan P. Total P (Biasa) P (Trasram)

- -
- -
TOTAL OPENINGAN

Luasan Pasangan Bata Biasa


Luasan pasangan bata = Luasan Total Pas. Bata - (Luasan openingan + Luasan KP & BP)

Total Pasangan bata 780.26


Pengurang
Luasan Openingan - 106.55
Luasan KP & BP -

TOTAL NETTO PAS. BATA 673.71

Luasan Pasangan Bata Trasram


Luasan pasangan bata = Luasan Total Pas. Bata - (Luasan openingan + Luasan KP & BP)
Total Pasangan bata 25.89
Pengurang
Luasan Openingan -
Luasan KP & BP -

TOTAL NETTO PAS. BATA 25.89


TOTAL PENGGABUNGAN BIASA DAN TRASRAM 699.60

Panjang Plesteran Openingan

Keterangan L + T. Total

Pintu
P-1 1.90 + 2.70
P-2 0.98 + 2.70
P-3 0.78 + 2.70

Jendela & Boven


J-1 0.98 + 1.80
BV 0.83 + 0.53
BV-1 1.52 + 0.61

TOTAL PLESTERAN BENANGAN

Benangan Openingan

Panjang benangan = 564.32 m1

Plesteran dinding biasa

Keterangan P x T
2 x Pas. Bata
Ples. Opening 282.16 x 0.15
Ples.KP & BP
Pengurang
Yang tdk diplester

TOTAL PLESTERAN

Plesteran dinding trasram

Keterangan P x T
2 x Pas. Bata
Ples. Opening - x 0.15
Sloof SL 1 - x 0.20
Ples.KP & BP
Pengurang
Yang tdk diplester

TOTAL PLESTERAN

Acian Dinding = Plesteran dinding biasa + Plesteran di


= 1,300.38
0
0m & PLESTERAN

Dinding Yang Tidak Dip


T. Dinding T. Dinding Luas Dinding Luas Dinding Tinggi Dinding
= Satuan
Biasa trasram Biasa trasram Biasa

- 0.72 = - 26.75 m2 -
- 0.50 = - 20.08 m2 -
- 0.74 = - 23.53 m2 -
- 0.74 = - 23.53 m2 -
- 0.74 = - 1.37 m2 -
- 0.74 = - 1.00 m2 -
- 0.72 = - 9.78 m2 -
- 0.50 = - 7.58 m2 -
- 0.72 = - 2.19 m2 -
- 0.72 = - 0.72 m2 -
- 0.72 = - 0.72 m2 -
- 0.72 = - 0.72 m2 -
- 0.72 = - 0.72 m2 -
- 0.72 = - 0.72 m2 -
- 0.72 = - 0.72 m2 -
- 0.72 = - 9.78 m2 -
- 0.50 = - 7.58 m2 -

2 PS (Baru) - 137.47 m2 -

Dinding Yang Tidak Dip


T. Dinding T. Dinding Luas Dinding Luas Dinding Tinggi Dinding
= Satuan
Biasa trasram Biasa trasram Biasa

3.95 - = 125.61 - m2 -
3.40 - = 108.12 - m2 -
3.40 - = 6.29 - m2 -
1.90 1.50 = 2.57 2.03 m2 -
1.90 1.50 = 2.57 2.03 m2 -
1.05 - = 7.95 - m2 -
3.40 - = 46.17 - m2 -
3.40 - = 51.51 - m2 -
3.95 - = 12.01 - m2 -
1.90 1.50 = 1.90 1.50 m2 -
3.40 - = 3.40 - m2 -
3.40 - = 3.40 - m2 -
3.40 - = 3.40 - m2 -
3.95 - = 3.95 - m2 -
3.95 - = 3.95 - m2 -
0.38 - = 14.12 - m2 -
0.38 - = 5.16 - m2 -
0.38 - = 5.16 - m2 -
1.15 - = 2.82 - m2 -
1.15 - = 2.82 - m2 -
1.15 - = 2.82 - m2 -
1.15 - = 2.82 - m2 -
2.28 - = 5.75 - m2 -
2.28 - = 5.75 - m2 -
0.90 - = 0.54 - m2 -
0.90 - = 0.54 - m2 -
0.90 - = 0.54 - m2 -

431.61 5.55 m2 -

Luas Luas
T. Dinding T. Dinding
x Jumlah = Dinding Dinding Satuan
Biasa trasram
Biasa trasram

2.70 - x 7.00 = 35.91 - m2


#N/A - x - = #N/A #N/A m2
#N/A - x - = #N/A #N/A m2
1.80 - x 8.00 = 14.11 - m2
#N/A - x - = #N/A #N/A m2
0.61 - x 3.00 = 2.78 - m2

AL OPENINGAN 52.80 - m2

Luas Luas
x Jumlah x T/L = Dinding Dinding Satuan
Biasa trasram

x 1.00 x 0.20 = - - m2
x 1.00 x 0.12 = - - m2
- - m2

gan + Luasan KP & BP)

m2

m2
m2
m2

m2
gan + Luasan KP & BP)

m2

m2
m2

m2
m2

Dinding Yang Tidak Dip


T. Dinding T. Dinding Luas Dinding Luas Dinding Tinggi Dinding
= Satuan
Biasa trasram Biasa trasram Biasa

3.95 - = 125.61 - m2 -
1.90 1.50 = 4.37 3.45 m2 -
3.40 - = 14.88 - m2 -
3.95 - = 125.61 - m2 -
1.90 1.50 = 7.09 5.60 m2 -
3.40 - = 23.97 - m2 -
1.90 1.50 = 7.09 5.60 m2 -
3.40 - = 14.88 - m2 -
3.40 - = 44.66 - m2 -
3.40 - = 115.26 - m2 3.40
3.40 - = 26.10 - m2 -
3.40 - = 13.18 - m2 -
3.40 - = 26.10 - m2 -
3.40 - = 7.99 - m2 -
1.90 1.50 = 2.38 1.88 m2 -
3.40 - = 26.10 - m2 -
1.90 1.50 = 2.38 1.88 m2 -
1.90 1.50 = 2.38 1.88 m2 -
3.40 - = 26.10 - m2 -
3.40 - = 4.25 - m2 -
3.40 - = 26.10 - m2 -
1.90 1.50 = 2.38 1.88 m2 -
3.40 - = 2.89 - m2 -
1.90 1.50 = 2.38 1.88 m2 -
3.40 - = 26.10 - m2 -
1.90 1.50 = 2.38 1.88 m2 -
3.40 - = 7.99 - m2 -
3.40 - = 26.10 - m2 -
3.40 - = 26.10 - m2 -
3.40 - = 13.18 - m2 -
1.15 - = 2.82 - m2 -
1.15 - = 2.82 - m2 -
1.15 - = 2.82 - m2 -
1.15 - = 2.82 - m2 -
2.28 - = 5.75 - m2 -
2.28 - = 5.75 - m2 -
0.90 - = 0.54 - m2 -
0.90 - = 0.54 - m2 -
0.90 - = 0.54 - m2 -

780.26 25.89 m2 3.40

Luas Luas
T. Dinding T. Dinding
x Jumlah = Dinding Dinding Satuan
Biasa trasram
Biasa trasram

2.70 - x 7.00 = 35.91 - m2


2.70 - x 16.00 = 42.34 - m2
2.70 - x 5.00 = 10.53 - m2
1.80 - x 8.00 = 14.11 - m2
0.53 - x 2.00 = 0.88 - m2
0.61 - x 3.00 = 2.78 - m2

AL OPENINGAN 106.55 - m2

Luas Luas
x Jumlah x T/L = Dinding Dinding Satuan
Biasa trasram

x 1.00 x 0.20 = - - m2
x 1.00 x 0.12 = - - m2
- - m2

gan + Luasan KP & BP)

m2

m2
m2
m2

m2

gan + Luasan KP & BP)


m2

m2
m2

m2
m2

T. Dinding Panjang
x Jumlah = Satuan
Biasa Trasram Biasa Trasram

2.70 - x 7.00 = 51.10 - m1


2.70 - x 16.00 = 102.08 - m1
2.70 - x 5.00 = 30.90 - m1

1.80 x 9.00 = 50.04 m1


0.53 x 2.00 = 5.44 m1
0.61 x 10.00 = 42.60 m1

282.16 - m1

x Jumlah = Luas Satuan


= 1,347.43 m2
= 42.32 m2
= - m2

= - 115.26 m2

1,274.49 m2

x Jumlah = Luas Satuan


= 51.78 m2
= - m2
= - m2
= - m2
= - 25.89 m2

N 25.89 m2

teran dinding biasa + Plesteran dinding trasram


m2
Dinding Yang Tidak Diplester (Jika ada)
Tinggi Dinding Dinding
Trasram Biasa Trasram

0.72 - 26.75
0.50 - 20.08
1.48 - 47.06
1.48 - 47.06
1.48 - 2.74
1.48 - 2.00
0.72 - 9.78
0.50 - 7.58
1.44 - 4.38
1.44 - 1.44
1.44 - 1.44
1.44 - 1.44
1.44 - 1.44
1.44 - 1.44
1.44 - 1.44
0.72 - 9.78
0.50 - 7.58

19.66 - 193.41

Dinding Yang Tidak Diplester (Jika ada)


Tinggi Dinding Dinding
Trasram Biasa Trasram

- - -
- - -
3.40 - 6.29
3.40 - 4.59
3.40 - 4.59
2.10 - 15.91
6.80 - 92.34
3.40 - 51.51
7.90 - 24.02
6.80 - 6.80
6.80 - 6.80
6.80 - 6.80
6.80 - 6.80
7.90 - 7.90
7.90 - 7.90
0.76 - 28.23
0.76 - 10.32
0.76 - 10.32
2.30 - 5.64
2.30 - 5.64
2.30 - 5.64
2.30 - 5.64
4.56 - 11.49
4.56 - 11.49
- - -
- - -
- - -

94.00 - 336.65
Dinding Yang Tidak Diplester (Jika ada)
Tinggi Dinding Dinding
Trasram Biasa Trasram

- - -
1.50 - 3.45
- - -
- - -
1.50 - 5.60
- - -
1.50 - 5.60
- - -
- - -
- 115.26 -
- - -
- - -
- - -
- - -
1.50 - 1.88
- - -
1.50 - 1.88
1.50 - 1.88
- - -
- - -
- - -
1.50 - 1.88
- - -
1.50 - 1.88
- - -
1.50 - 1.88
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -
- - -

13.50 115.26 25.89


PEKERJAAN LANTAI
LANTAI 1
LANTAI 1
Keterangan Ruang P x L x Jumlah = Luas Satuan

F5 Bengkel elektro 5.85 x 4.58 1.00 = 26.79 m2


F5 Bengkel elektro 2.15 x 1.83 1.00 = 3.93 m2
F5 pintu 0.82 x 0.15 1.00 = 0.12 m2
F5 pintu 1.68 x 0.15 1.00 = 0.25 m2
F5 Bengkel mekanik 7.68 x 5.65 1.00 = 43.39 m2
F5 pintu 0.92 x 0.15 2.00 = 0.28 m2
F5 pintu 1.32 x 0.15 1.00 = 0.20 m2
F3 toilet 1.68 x 2.28 1.00 = 3.83 m2
F3 toilet 1.35 x 1.85 4.00 = 9.99 m2
F1 Gudang Alkes 7.68 x 3.85 1.00 = 29.57 m2
F1 Workshop/R. Rapat 7.68 x 7.05 1.00 = 54.14 m2
F1 R. Staff 7.68 x 3.85 1.00 = 29.57 m2
F1 R. Kasie 4.00 x 4.65 1.00 = 18.60 m2
F1 Gudang alkes baik 3.68 x 4.38 1.00 = 16.12 m2
F1 g alkes rusak berat 3.90 x 4.38 1.00 = 17.08 m2
F1 pintu 1.32 x 0.15 6.00 = 1.19 m2
F1 pintu 0.92 x 0.15 12.00 = 1.66 m2
F1 Gudang part 2.35 x 7.37 1.00 = 17.32 m2
F1 koridor toilet 2.35 x 1.85 1.00 = 4.35 m2
F1 koridor toilet 0.85 x 4.00 1.00 = 3.40 m2
F1 pantry 1.35 x 7.05 1.00 = 9.52 m2
F1 koridor toilet 2.35 x 1.85 1.00 = 4.35 m2
f9 Lantai rabat beton 1.48 x 3.00 2.00 = 8.88 m2
R.Jemur 1.00 x 15.85 = - m2
F2 R.Jemur 1.50 x 1.69 2.00 = 5.07 m2
F2 pintu 0.92 x 0.15 2.00 = 0.28 m2
F1 . POTONG RAMBUT 4.40 x 2.35 1.00 = 10.34 m2
F2 selasar 40.18 x 3.00 1.00 = 120.54 m2
F2 selasar 14.86 x 3.00 2.00 = 89.16 m2
F4 TOILET 7.90 x 1.80 1.00 = 14.22 m2
F4 TOILET 6.40 x 1.80 4.00 = 46.08 m2
F4 P-3 0.78 x 1.80 5.00 = - 7.02 m2
F6 dinding luar gedung 34.25 x 0.90 1.00 = 30.83 m2 34.25
F6 dinding luar gedung 12.68 x 0.90 2.00 = 22.82 m2 25.36
F6 P-1 1.90 x 0.90 7.00 = - 11.97 m2 13.30
F6 P-2 0.98 x 0.90 3.00 = - 2.65 m2 2.94
F6 j-1 0.98 x 0.10 9.00 = - 0.88 m2 8.82
F7 Meja beton 4.00 X 0.60 1.00 = 2.40 m2
F8 DINDING meja beton 4.00 X 0.60 1.00 = 2.40 m2
F8 bibir meja 5.20 X 0.12 1.00 = 0.62 m2

TOTAL TOTAL 626.77 m2 25.06 m'

f1 Granit Tile Uk. 60X60 Cm Polished (F1) 217.20 m2


f2 Granit Tile Uk. 60X60 Cm UnPolished (F2) 215.05 m2
f3 Granit Tile Uk. 60X60 Cm UnPolished (Lantai kamar mandi) F3 13.82 m2
f4 Granit Tile Uk. 60X60 Cm (Dinding Kamar Mandi) 53.28 m2
f5 Pemasangan Floor Hardeneer 5kg/m2 74.97 m2
f6 Granit Tile Uk. 60X60 Cm tinggi 90cm (Dinding Luar) 38.15 m2 42.39
f7 Granit Tile meja beton Uk. 60X60 Cm 2.40 m2 2.67
f8 Granit Tile dinding meja beton Uk. 60X60 Cm 3.02 m2 3.36
f9 Beton rabat tebal 10 cm 0.89 m3 0.99

Pemasangan Plint Granite Tile Uk. 10x60 cm


#REF!
Keterangan Ruang P x T x Jumlah = Panjang Satuan
= 316.87 m2
= - m2

Pengurang
p-1 1.90 x 7.00 = 13.30 m'
p-2 0.98 x 16.00 = 15.68 m'
p-3 0.78 x 5.00 = 3.90 m'

TOTAL Pemasangan Plint Granite Tile Uk. 10x60 cm 349.75 m'

Pemasangan Kolom Granite Tile Uk. 60x60 cm


#REF!
Keterangan Ruang P x L x Jumlah = Panjang Satuan
KOLOM BESAR 1.20 x 2.40 24.00 = 69.12 m2

Pengurang
x x - = - m2

TOTAL Pemasangan Kolom Granite Tile Uk. 60x60 cm 69.12 m2


PEKERJAAN PLAFOND
LANTAI 1
Pemasangan Plafon
LANTAI 1
Keterangan Ruangan P x L x Jumlah = Luas Satuan
Bengkel elektro 5.85 4.58 1.00 = 26.79 m2
Bengkel elektro 2.15 1.83 1.00 = 3.93 m2
Bengkel mekanik 7.68 5.65 1.00 = 43.39 m2
toilet 1.68 2.28 1.00 = 3.83 m2
toilet 1.35 1.85 4.00 = 9.99 m2
Gudang Alkes 7.68 3.85 1.00 = 29.57 m2
Workshop/R. Rapat 7.68 7.05 1.00 = 54.14 m2
R. Staff 7.68 3.85 1.00 = 29.57 m2
R. Kasie 4.00 4.65 1.00 = 18.60 m2
Gudang alkes baik 3.68 4.38 1.00 = 16.12 m2
Gudang alkes rusak berat 3.90 4.38 1.00 = 17.08 m2
Gudang part 2.35 7.37 1.00 = 17.32 m2
koridor toilet 2.35 1.85 1.00 = 4.35 m2
koridor toilet 0.85 4.00 1.00 = 3.40 m2
pantry 1.35 7.05 1.00 = 9.52 m2
koridor toilet 2.35 1.85 1.00 = 4.35 m2
pintu 0.92 0.15 2.00 = 0.28 m2
R. POTONG RAMBUT 4.40 2.35 1.00 = 10.34 m2
selasar 40.18 2.75 1.00 = 110.50 m2
selasar 14.86 2.75 2.00 = 81.73 m2
atap bg luar 36.00 0.56 2.00 = 40.32 m2
atap bg luar gewel 7.90 0.91 2.00 = 14.38 m2

TOTAL 549.49 m2

Pemasangan Lis plafond PVC (dinding )


-
LANTAI 1
Pengecatan dinding Interior Lt. 1
Luasan Total
Keterangan P x T x Jml. Sisi =
Dinding
CE Luar depan 34.20 x 3.80 x 1.00 =
CE Luar samping 12.10 x 4.50 x 2.00 =
KP Bengkel elektro 24.52 x 3.80 1.00 =
CI Bengkel elektro 24.52 x 3.80 1.00 =
CP Bengkel elektro 30.70 x 1.00 1.00 =
KP Bengkel mekanik 24.65 x 3.80 1.00 =
CI Bengkel mekanik 24.65 x 3.80 1.00 =
CP Bengkel mekanik 35.70 x 1.00 1.00 =
CI1 toilet 7.90 x 1.80 1.00 =
CP toilet 3.81 x 1.00 1.00 =
CI1 toilet 6.40 x 1.80 4.00 =
CP toilet 2.50 x 1.00 4.00 =
KP Gudang Alkes 23.05 x 3.85 1.00 =
CI Gudang Alkes 23.05 x 3.85 1.00 =
CP Gudang Alkes 29.55 x 1.00 1.00 =
KP Workshop/R. Rapat 29.45 x 3.85 1.00 =
CI Workshop/R. Rapat 29.45 x 3.85 1.00 =
CP Workshop/R. Rapat 54.11 x 1.00 1.00 =
KP R. Staff 23.05 x 3.85 1.00 =
CI R. Staff 23.05 x 3.85 1.00 =
CP R. Staff 29.55 x 1.00 1.00 =
KP R. Kasie 24.65 x 3.85 1.00 =
CI R. Kasie 24.65 x 3.85 1.00 =
CP R. Kasie 35.70 x 1.00 1.00 =
KP Gudang alkes baik 16.10 x 3.85 1.00 =
CI Gudang alkes baik 16.10 x 3.85 1.00 =
CP Gudang alkes baik 16.10 x 1.00 1.00 =
KP Gudang alkes rusak berat 16.45 x 3.85 1.00 =
CI Gudang alkes rusak berat 16.45 x 3.85 1.00 =
CP Gudang alkes rusak berat 16.85 x 1.00 1.00 =
KP Gudang part 19.45 x 3.85 1.00 =
CI Gudang part 19.45 x 3.85 1.00 =
CP Gudang part 17.33 x 1.00 1.00 =
KP koridor toilet 16.40 x 3.85 1.00 =
CI koridor toilet 16.40 x 3.85 1.00 =
CP koridor toilet 7.75 x 1.00 1.00 =
KP pantry 16.85 x 3.85 1.00 =
CI pantry 16.85 x 3.85 1.00 =
CP pantry 9.70 x 1.00 1.00 =
KP koridor toilet 6.45 x 3.85 1.00 =
CI koridor toilet 6.45 x 3.85 1.00 =
CP koridor toilet 2.54 x 1.00 1.00 =
KP R.Jemur 75.80 x 3.85 1.00 =
CI R.Jemur 75.80 x 3.85 1.00 =
CP R.Jemur 70.00 x 1.00 1.00 =
CE kolom besar 1.20 x 1.18 24.00 =
CI2 Balok B1 181.96 0.18 2.00 =
CE lisplank 72.20 x 1.00 1.00 =
CI Cukur rambut 4.38 x 2.35 1.00 =
CI2 Plat atap 213.00 x 1.00 =

Pengurang Untuk CE luas x 1.00 =


ce P-1 5.13 x x 7.00 =
ce P-2 2.65 x x 7.00 =
ce P-3 2.11 x x 5.00 =
ce J-1 1.76 x x 9.00 =
ce BV 0.44 x x 2.00 =
ce BV-1 0.93 x x 10.00 =
ce Keramik depan 38.15 x x 1.00 =
Pengurang Untuk CI luas x 1.00 =
CI P-1 5.13 x x 7.00 =
CI P-2 2.65 x x 25.00 =
CI P-3 2.11 x x 5.00 =
CI J-1 1.76 x x 9.00 =
CI BV 0.44 x x 2.00 =
CI BV-1 0.93 x x 10.00 =

TOTAL

CE Cat dinding Eksterior Waterproof


CI Cat Dinding Interior anti bakteri
CI1 Cat Dinding Interior anti bakteri dalam toilet
CI2 Cat Plafond Interior anti bakteri (CP)
KP Kupas & Plester+Aci ulang Dinding
KP Kupas Plesteran dinding lama & Pembersihan
pasangan dinding baru 378.81 x 2.00
Kupas Plesteran dinding lama & Pembersihan
Luas Satuan

129.96 m2
108.90 m2
93.18 m2
93.18 m2
30.70 m2
93.67 m2
93.67 m2
35.70 m2
14.22 m2
3.81 m2
46.08 m2
10.00 m2
88.74 m2
88.74 m2
29.55 m2
113.38 m2
113.38 m2
54.11 m2
88.74 m2
88.74 m2
29.55 m2
94.90 m2
94.90 m2
35.70 m2
61.99 m2
61.99 m2
16.10 m2
63.33 m2
63.33 m2
16.85 m2
74.88 m2
74.88 m2
17.33 m2
63.14 m2
63.14 m2
7.75 m2
64.87 m2
64.87 m2
9.70 m2
24.83 m2
24.83 m2
2.54 m2
291.83 m2
291.83 m2
70.00 m2
33.98 m2
65.51 m2
72.20 m2
10.28 m2
213.00 m2

1.00 m2
- 35.91 m2
- 18.52 m2
- 10.53 m2
- 15.88 m2
- 0.88 m2
- 9.27 m2
- 38.15 m2
1.00 m2
- 35.91 m2
- 66.15 m2
- 10.53 m2
- 15.88 m2
- 0.88 m2
- 9.27 m2

3,232.74 m2

215.90 m2
1,089.15 m2
60.30 m2
278.51 m2
1,217.49 m2
1,217.49 m2
757.62 m2
459.87 m2
-

Apabila dimensi baja terpasang kurang dari dimensi yang ada di RAB maka metode perhitungan luas
baja tersebut didapat dari software Autocad dengan menggambar profil baja sesuai dimensi terpasan

S2m Multiplek 12 mm + HPL Melamin motif DUA SISI


S Multiplek 12 mm
S1a
S2p Multiplek 12 mm + HPL Melamin warna Polos DUA SISI

BACK DROP RUANG WORKSHOP

Berat Baja ( Kg/m ) = Luas (m2) x 7850 kg/m3

Besi Hollow 50x50x1,8 mm


Luas = 0.00036 m2
Berat Jenis Baja = 7,850 kg/m3
Berat = 2.83 kg/m

Berat
Keterangan Panjang Jumlah Volume
Kg / M
50x50x1.8 V 2.83 3.00 24.00 203.47
50x50x1.8 H (Memanjang) 2.83 4.95 16.00 223.82
50x50x1.8 H (Melintang) 2.83 0.25 56.00 39.56
50x50x1.8 H (Melintang) 2.83 0.20 16.00 9.04
50x50x1.8 H (Melintang) 2.83 0.05 16.00 2.26

Tinggi Lebar
s2m Multipleks 12mm (Depan) 4.00 0.50 2.00 4.00
S2p Multipleks 12mm (Depan) 4.00 4.00 1.00 16.00
S2p Multipleks 12mm (samping) 4.00 0.36 2.00 2.88

Lis Stainless L=3cm 3.90 0.03 3.00 0.35


Lis Stainless L=3cm 0.50 0.03 6.00 0.09

TOTAL 501.48
50x50x1.8 Besi hollow 50x50x1.8 478.16
- -
Lis Stainless L=3cm Lis Stainless L=3cm 0.44
Lis Stainless L=1cm Lis Stainless L=1cm -
S2m Multiplek 12 mm + HPL Melamin motif DUA SISI 4.00
S2p Multiplek 12 mm + HPL Melamin warna Polos DUA SISI 18.88

S1m Multiplek 12 mm + HPL motif kayu SATU SISI


S2m Multiplek 12 mm + HPL motif kayu DUA SISI
S1a Multiplek 12 mm + HPL warna Abu-Abu SATU SISI
S1p Multiplek 12 mm + HPL warna Putih SATU SISI
BACKDROP LOKET

Berat Baja ( Kg/m ) = Luas (m2) x 7850 kg/m3

Besi Hollow 40x40x1,2 mm


Luas = 0.00019 m2
Berat Jenis Baja = 7,850 kg/m3
Berat = 1.51 kg/m

Berat
Keterangan Panjang Jumlah Volume
Kg / M
40x40x1.2 V 2.83 3.15 12.00 106.82
40x40x1.2 V 2.83 0.76 1.00 2.15
40x40x1.2 H (LY) 2.83 0.08 20.00 4.52
40x40x1.2 H (LY) 2.83 0.34 8.00 7.69
40x40x1.2 H (LX) 2.83 3.05 11.00 94.81
40x40x1.2 H (LX) 2.83 1.00 5.00 14.13

Tinggi Lebar
S1m Multipleks 12mm 2.39 0.80 1.00 1.91
S1m Multipleks 12mm atas pintu 0.25 0.80 1.00 0.20
S1a Multipleks 12mm 0.80 2.25 1.00 1.80
S1a Multipleks 12mm 3.85 0.20 2.00 1.54
S1a Multipleks 12mm 2.25 0.06 4.00 0.54
S1p Multipleks 12mm 1.60 2.25 1.00 3.60
S1a Multipleks 12mm atas 0.76 3.85 1.00 2.93
S1p Multipleks 12mm belakang 3.15 3.85 1.00 12.13
Pengurang
S1p Multipleks 12mm pintu 2.14 0.80 1.00 - 1.71
kamufalse Pintu kamufalse 1.00 1.00
Lis Stainless L=8 cm 3.85 2.00 7.70
Lis Stainless L=8 cm 2.25 1.00 2.25

Lis Stainless L=1cm 1.59 4.00 6.36

TOTAL 270.36
40x40x1.2 Besi Hollow 50x50x1,8 mm 40x40x1.2 230.12
Multipleks 12mm Multipleks 12mm 22.93
Lis Stainless L=8 cm Lis Stainless L=8 cm 9.95
Lis Stainless L=1cm Lis Stainless L=1cm 6.36
S1m Multiplek 12 mm + HPL motif kayu SATU SISI 2.11
S1a Multiplek 12 mm + HPL warna Abu-Abu SATU SISI 6.81
S1p Multiplek 12 mm + HPL warna Putih SATU SISI 14.02
kamufalse Pintu kamufalse 1.00
Huruf Stainless Steel SS304 tinggi 20 cm 19.00
Logo Pemerintah Kota Surabaya tinggi 30 cm 1.00

BACKDROP DEPAN MEJA LOKET


S1m Multiplek 12 mm + HPL motif kayu SATU SISI
S2m Multiplek 12 mm + HPL motif kayu DUA SISI
S1a Multiplek 12 mm + HPL warna Abu-Abu SATU SISI
S1p Multiplek 12 mm + HPL warna Putih SATU SISI

Berat Baja ( Kg/m ) = Luas (m2) x 7850 kg/m3

Besi Hollow 40x40x1,2 mm


Luas = 0.00019 m2
Berat Jenis Baja = 7,850 kg/m3
Berat = 1.51 kg/m

Berat
Keterangan Panjang Jumlah Volume
Kg / M
40x40x1.2 V 2.83 1.20 2.00 6.78
40x40x1.2 V 2.83 0.80 3.00 6.78
40x40x1.2 V 2.83 0.63 1.00 1.78
40x40x1.2 V 2.83 0.78 1.00 2.20
40x40x1.2 V 2.83 0.53 1.00 1.50
40x40x1.2 V 2.83 0.40 2.00 2.26
40x40x1.2 Arah X 2.83 2.90 7.00 57.37
40x40x1.2 Arah X 2.83 2.90 5.00 40.98
40x40x1.2 Arah X 2.83 2.95 1.00 8.34
40x40x1.2 Arah Y 2.83 0.80 6.00 13.56
40x40x1.2 Arah Y 2.83 0.58 3.00 4.92
40x40x1.2 Arah Y 2.83 0.28 3.00 2.37

luas Lebar
S1m Multipleks 12mm Depan 1.67 1.00 1.67
S1p Multipleks 12mm Depan 1.24 1.00 1.24
Panjang Lebar
s1p Multipleks 12mm meja atas 1.45 0.50 1.00 0.73
s1p Multipleks 12mm meja bawah 1.37 0.72 1.00 0.99
s1p Multipleks 12mm meja bawah 1.45 0.72 1.00 1.04
s1a Multipleks 12mm dalam atas 1.37 0.38 1.00 0.52
s1a Multipleks 12mm dalam atas 1.37 0.08 1.00 0.11
s1a Multipleks 12mm dalam bawah 2.97 0.78 1.00 2.32
s1p Multipleks 12mm samping atas 0.22 0.38 4.00 0.33
s1p Multipleks 12mm samping bawah 0.54 0.78 4.00 1.68
s1p Multipleks 12mm samping bwh luar 0.80 0.80 1.00 0.64
s1p Multipleks 12mm celah depan 2.97 0.10 1.00 0.30
s1p Multipleks 12mm depan bawah 2.97 0.10 1.00 0.30
Lis Stainless L=10 cm 3.71 1.00 3.71
Pintu 1.00 1.00

TOTAL
40x40x1.2 Besi Hollow 50x50x1,8 mm 40x40x1.2 148.85
Multipleks 12mm Multipleks 12mm 11.87
Lis Stainless L=10 cm Lis Stainless L=10 cm 3.71
Pintu Pintu 1.00
S1m Multiplek 12 mm + HPL motif kayu SATU SISI 1.67
S1a Multiplek 12 mm + HPL warna Abu-Abu SATU SISI 2.95
S1p Multiplek 12 mm + HPL warna Putih SATU SISI 7.25

BACKDROP APOTIK
S1m Multiplek 12 mm + HPL motif kayu SATU SISI
S2m Multiplek 12 mm + HPL motif kayu DUA SISI
S1a Multiplek 12 mm + HPL warna Abu-Abu SATU SISI
S1p Multiplek 12 mm + HPL warna Putih SATU SISI

Berat Baja ( Kg/m ) = Luas (m2) x 7850 kg/m3

Besi Hollow 40x40x1,2 mm


Luas = 0.00019 m2
Berat Jenis Baja = 7,850 kg/m3
Berat = 1.51 kg/m

Berat
Keterangan Panjang Jumlah Volume
Kg / M
40x40x1.2 V 2.83 1.20 3.00 10.17
40x40x1.2 V 2.83 0.76 6.00 12.89
40x40x1.2 V 2.83 0.38 1.00 1.07
40x40x1.2 V 2.83 0.53 1.00 1.50
40x40x1.2 V 2.83 0.68 1.00 1.92
40x40x1.2 Arah X 2.83 2.85 12.00 96.65
40x40x1.2 Arah X 2.83 2.90 1.00 8.20
40x40x1.2 Arah Y 2.83 0.80 6.00 13.56
40x40x1.2 Arah Y 2.83 0.58 3.00 4.92
40x40x1.2 Arah Y 2.83 0.28 3.00 2.37

luas Lebar
S1m Multipleks 12mm Depan 1.71 1.00 1.71
S1p Multipleks 12mm Depan 1.71 1.00 1.71
Panjang Lebar
S1p Multipleks 12mm meja atas 2.85 0.50 1.00 1.43
S1p Multipleks 12mm meja bawah 2.85 0.72 2.00 4.10
s1a Multipleks 12mm dalam atas 2.85 0.38 4.00 4.33
s1a Multipleks 12mm dalam bawah 2.85 0.74 1.00 2.11
s1a Multipleks 12mm samping 0.53 0.74 4.00 1.57
s1a Multipleks 12mm celah depan 2.90 0.10 1.00 0.29
s1a Multipleks 12mm depan bawah 2.85 0.10 1.00 0.29
Stainless L=10 cm 2.85 2.00 5.70
Jendela Apotik 1.00 1.00

TOTAL 177.49
40x40x1.2 Besi Hollow 50x50x1,8 mm 40x40x1.2 153.25
Multipleks 12mm Multipleks 12mm 17.53
Stainless L=10 cm Stainless L=10 cm 5.70
Jendela Apotik Jendela Apotik 1.00
S1m Multiplek 12 mm + HPL motif kayu SATU SISI 1.71
S1a Multiplek 12 mm + HPL warna Abu-Abu SATU SISI 8.58
S1p Multiplek 12 mm + HPL warna Putih SATU SISI 7.24
Huruf Stainless Steel SS304 tinggi 15 cm 6.00
#REF!

maka metode perhitungan luas area


baja sesuai dimensi terpasang

Satuan
kg
kg
kg
kg
kg

m2
m2
m2

m2
m2

kg
kg
m2
m2
m'
m2
m2
Satuan
kg
kg
kg
kg
kg
kg

m2
m2
m2
m2
m2
m2
m2
m2

m2
unit
m'
m'

m'

kg
kg
m2
m'
m'
m2
m2
m2
unit
huruf
bh
Satuan
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

m2
m2

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m'
Unit

kg
m2
m'
unit
m2
m2
m2
Satuan
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg

m2
m2

m2
m2
m2
m2
m2
m2
m2
m'
Unit

kg
kg
m2
m'
unit
m2
m2
m2
huruf
Pekerjaan Sanitair
1 2 3 4 5 6 7 8
Keterangan Jumlah = Volume
1 Closet Duduk Monoblok 5.00 = 5.00
2 Jet Spray 5.00 = 5.00
3 Wastafel Gantung + kran air = -
4 Kran air 1/2" 5.00 = 5.00
5 Floor drain Stainless Steel ɸ 3" 5.00 = 5.00

6 Sink kolam dalam termasuk Kran Air & Kelengkapannya 1.00 = 1.00

7 Meja beton Sink Tebal 10 cm 0.24 = 0.24


8 = -
9 = -
10 = -
11 - = -

PEKERJAAN LAMPU & STOP KONTAK

Keterangan Jumlah = Volume

- = -

AC Splitz Kapasitas 1 PK Anti bacteri (termasuk instalasi


17.00 = 17.00
pipa, kabel, lengkap & terpasang)

Exhaust Fan Ceilling 5.00 = 5.00

Instalasi Titik Lampu 145.00 = 145.00

Instalasi Stop kontak + Stop Kontak Dinding


20.00 = 20.00

Instalasi Stop kontak + Stop Kontak AC


17.00 = 17.00
Lampu LED Downlight 24 W 20.00 = 20.00
Lampu LED Downlight 5 W 94.00 = 94.00
Lampu LED Downlight 9 W 11.00 = 11.00
Lampu LED Downlight 16 W 20.00 = 20.00
Saklar tunggal 12.00 = 3.00
Saklar Ganda 23.00 = 23.00
Panel Box Uk. 40x60x20 cm (Lengkap) + 1bh MCCB 35A
3 PHASE + 17bh MCB 10A 1 PHASE + 13bh MCB 6A 1 1.00 1.00
PHASE

Total

PEKERJAAN INSTALASI AIR BERSIH

Keterangan Jumlah = Volume


Pipa Air Bersih PVC AW Ø 1'' 120.00 = 120.00
Pipa Air Bersih PVC AW Ø 3/4'' 8.00 = 8.00
Pipa Air Bersih PVC AW Ø 1/2'' 15.00 = 15.00

PEKERJAAN INSTALASI KOTOR

Keterangan Jumlah = Volume


Biotank Kapasitas 2 m3 termasuk pipa udara 2.00 = 2.00
Pipa PVC AW Ø 4'' 48.00 = 48.00

PEKERJAAN INSTALASI AIR BEKAS & HUJAN

Keterangan Jumlah = Volume


Pipa PVC AW Ø 3'' 56.00 = 56.00
Pipa PVC AW Ø 4'' 64.00 = 64.00
Pipa PVC AW Ø 3'' yang ditanam dalam Kolom 60.00 = 60.00
Roof Drain diameter 3" 12.00 = 12.00
- -

Lantai 1
Satuan
unit
bh
unit
bh
bh

unit

m3
#N/A
#N/A
#N/A
#N/A

lantai 1
Satuan

KVA

Unit

bh

Ttk

Ttk

Ttk
bh
bh
bh
bh
bh
bh

unit

Lantai 1
Satuan
m'
m'
m'

lantai 1
Satuan
bh
m'

lantai 1
Satuan
m'
m'
m'
bh
1 2
Closet jongkok bh
Closet Duduk Monoblok unit
Jet Spray bh
Closet Duduk khusus difabel + eco washer unit
Pengadaan & pasang grab bar Stainless 304 ɸ 2" sesuai gambar unit

Urinoir Lengkap unit

Wastafel Gantung + kran air unit


Wastafel Meja + kran air unit
Kran air 1/2" bh
Floor drain Stainless Steel ɸ 3" bh
Sink kolam dalam termasuk Kran Air & Kelengkapannya unit
Meja beton Sink Tebal 10 cm m3
tangga monyet m'
Apabila dimensi baja terpasang kurang dari dimensi yang ada di RAB maka metode perhitungan luas area
baja tersebut didapat dari software Autocad dengan menggambar profil baja sesuai dimensi terpasang

Berat Baja ( Kg/m ) = Luas (m2) x 7850 kg/m3

Kuda-kuda WF 150.75.5.7
Luas = 0.00179 m2
Berat Jenis Baja = 7,850 kg/m3
Berat = 14.01 kg/m

Berat
Keterangan Panjang Jumlah Volume Satuan
Kg / M
Bentang 8 m
kaki Kuda kuda 14.01 10.04 8.00 1,125.46 kg
Kolom pedestal 14.01 0.62 16.00 139.00 kg
Voute atas 14.01 0.30 8.00 16.81 kg
Voute bawah 14.01 1.13 8.00 63.34 kg

TOTAL 1,344.62 kg
Kuda-kuda WF 150.75.5.7 1,344.62 kg

Pasang gording besi Canal C150.65.20.2,3 (termasuk mur baut)


Luas = 0.000701 m2
Berat Jenis Baja = 7,850 kg/m3
Berat = 5.50 kg/m

Berat
Keterangan Panjang Jumlah Volume Satuan
Kg / M
Bentang 8 m
5.50 34.20 12.00 2,259.01 kg

TOTAL 2,259.01 kg
Pasang gording besi Canal C150.65.20.2,3 (termasuk mur baut) 2,259.01 kg

Pasang penguat gording besi siku L70.70.7


Berat
Keterangan Panjang Jumlah Volume Satuan
Kg / M
Bentang 8 m 7.38 1.80 8.00 106.27 kg

TOTAL 106.27 kg
Pasang penguat gording besi siku L70.70.7 106.27 kg

Pasang pengaku gording besi dia. 10 mm (Sagrot)


Berat
Keterangan Panjang Jumlah Volume Satuan
Kg / M
Bentang 8 m 0.62 10.04 19.00 117.61 Kg

Total 117.61 Kg
Pasang pengaku gording besi dia. 10 mm (Sagrot) 117.61 Kg

Pasang Ikatan Angin dia.12 mm


Berat
Keterangan Panjang Jumlah Volume Satuan
Kg / M
- 0.89 11.39 8.00 80.86 Kg
Total 80.86 Kg
Pasang Ikatan Angin dia.12 mm 80.86 Kg

Pasang jarum keras ɸ 12 mm


Keterangan Per ttk N = Jumlah Satuan
ikatan ang ɸ 12 mm 2.00 8.00 = 16.00 Bh

Pasang jarum keras ɸ 12 mm 16.00 Bh

Pasang plat flendes & base plat t = 10 mm


Berat
Keterangan Panjang Lebar Tebal Jumlah Volume
Kg / M

7,850.00 0.25 0.25 0.01 16.00 78.50

Total 78.50
Pasang plat flendes & base plat t = 10 mm 78.50

Pasang plat sambungan t =10 mm


Berat
Keterangan Panjang Lebar Tebal Jumlah Volume
Kg / M
-
Balok atas 7,850.00 0.25 0.075 0.01 8.00 11.78
bawah 7,850.00 0.57 0.075 0.01 16.00 53.69

Total 65.47
Pasang plat sambungan t =10 mm 65.47

Pasang plat RIB t =8 mm


Berat
Keterangan Panjang Lebar Tebal Jumlah Volume
Kg / M
-
Kolom Kuda kuda 7,850.00 0.136 0.070 0.008 64.00 38.26

Total 38.26
Pasang plat RIB t =8 mm 38.26

Pasang Atap genteng Karangpilang

Keterangan Panjang Lebar = Volume


Kemiring Faktor
an atap pengali miring
- 36.00 9.01 30 1.15 = 374.54

Total 374.54
Pasang Atap genteng Karangpilang 374.54
Pasang rangka atap Usuk Galvalume C75.75 dan reng U30 t=0.45mm 374.54

Pasang Wuwung Genteng karangpilang


Keterangan P = Volume Satuan
36.00 = 36.00 m1

Total 36.00 m1
Pasang Wuwung Genteng karangpilang 36.00 m1

Pasang Lisplank woodplank 2x(0.8x30cm)


Keterangan P = Volume Satuan
72.00 = 72.00 m1
20.81 = 20.81 m1

Total 92.81 m1
Pasang Lisplank woodplank 2x(0.8x30cm) 92.81 m1

Mur Baut HTB


Keterangan Per ttk N = Jumlah Satuan
Keterangan
Pot 1 ɸ 12 mm 8.00 8.00 = 64.00 Bh
Pot 2 10.00 8.00 = 80.00 Bh
Pot 3 ɸ 12 mm 8.00 8.00 = 64.00 Bh

Total 208.00 Bh
Mur Baut HTB ɸ 12 mm ɸ 12 mm 128.00 Bh
Mur Baut HTB ɸ 16 mm - Bh

Pasang besi tarik ɸ 16 mm


Keterangan berat per m' panjang N = Jumlah Satuan
ikatan ang ɸ 16 mm 1.578 7.70 8.00 = 97.23 kg

Pasang besi tarik ɸ 16 mm 97.23 kg

Pasang jarum keras ɸ 16 mm


Keterangan Per ttk N = Jumlah Satuan
ikatan ang ɸ 16 mm 1.00 8.00 = 8.00 Bh

Pasang jarum keras ɸ 16 mm 8.00 Bh

Angkur ɸ 19 - 400 mm
Keterangan = Jumlah Satuan
64.00 = 64.00 Bh

Angkur ɸ 19 - 400 mm 64.00 Bh

Pasang Flashing Aluminium


Keterangan P = Volume Satuan
20.83 = 20.83 m1

Total 20.83 m1
Pasang Flashing Aluminium 20.83 m1

Pasang Atap UPVC tebal 10mm

Keterangan Panjang Lebar = Volume


Kemiring Faktor
an atap pengali miring
13.50 3.50 15 1.04 = 48.92
13.50 2.50 15 1.04 = 34.94

Total 83.86
Pasang Atap UPVC tebal 10mm 83.86
hitungan luas area
ensi terpasang
Satuan

Kg

Kg
Kg

Satuan

Kg
Kg

Kg
Kg

Satuan

Kg

Kg
Kg

Satuan

m2

m2
m2
m2
Satuan
m2
m2

m2
m2
REKAPITULASI

NO ITEM PEKERJAAN BIAYA

1 PEKERJAAN PERSIAPAN Rp 81,526,944.82


2 PEKERJAAN TANAH Rp 43,952,402.98
3 PEKERJAAN BETON Rp 850,646,332.23
4 PEKERJAAN ATAP Rp 712,476,283.82
5 PEKERJAAN PASANGAN DINDING Rp 524,451,813.90
6 PEKERJAAN KUSEN PINTU, JENDELA DAN DINDING PARTISI Rp 433,786,839.70
7 PEKERJAAN PASANG GRANITE Rp 477,214,538.59
8 PENGECATAN Rp 115,265,474.96
9 PEKERJAAN PLAFOND Rp 291,123,114.29
10 PEKERJAAN SANITAIR Rp 38,817,890.21
11 PEKERJAAN MEUBELAIR Rp 105,953,196.47
11 PEKERJAAN ELEKTRIKAL & AC (AIR CONDITIONER) Rp 274,358,000.00
12 PEKERJAAN INSTALASI AIR BERSIH Rp 12,676,690.00
13 PEKERJAAN INSTALASI KOTOR Rp 59,320,080.00
14 PEKERJAAN INSTALASI AIR BEKAS & HUJAN Rp 66,940,240.00
15 PEKERJAAN AKHIR Rp 37,500,000.00

Rp 4,126,009,841.95

JUMLAH TOTAL PEKERJAAN STANDART Rp 4,126,009,841.95


RENCANA ANGGARAN BIAYA (R A B)

NO.
ITEM PEKERJAAN SAT. VOLUME HARGA SATUAN JUMLAH HARGA

I. PEKERJAAN PERSIAPAN
1 Uitzet & Bouwplank ttk 46.00 Rp 157,455.00 Rp 7,242,930.00
2 Keselamatan dan Kesehatan Kerja (K3) Ls 1.00 Rp 16,000,000.00 Rp 16,000,000.00
3 Bongkar Atap Selasar dan atap belakang, Plafond, Kusen Pintu & Jendela serta dinding ba Ls 1.00 Rp 47,500,000.00 Rp 47,500,000.00
4 Kupas Plesteran dinding lama & Pembersihan m2 459.87 Rp 23,450.00 Rp 10,784,014.82

PEKERJAAN PERSIAPAN Jumlah Rp 81,526,944.82

II. PEKERJAAN TANAH


1 GalianTanah m3 58.58 Rp 122,500.00 Rp 7,175,452.81
2 Urugan pasir bawah Poer t = 10 cm m3 6.40 Rp 271,000.00 Rp 1,733,858.00
3 Urugan pasir bawah lantai bangunan t = 10 cm m3 51.41 Rp 271,000.00 Rp 13,932,681.81
4 Urugan Sirtu Bawah Lantai dan Pemadatan Pakai Stamper m3 27.56 Rp 355,400.00 Rp 9,794,205.60
5 Urug Tanah kembali m3 27.60 Rp 90,000.00 Rp 2,484,204.75
6 Pengeboran strouss ɸ30cm m' 80.00 Rp 110,400.00 Rp 8,832,000.00

PEKERJAAN TANAH Jumlah Rp 43,952,402.98

III. PEKERJAAN BETON


1 Pondasi Strouss dia. - 30 cm Mutu K-225 (f'c=18,675 MPa) m3 5.65 Rp 4,572,101.44 Rp 25,854,624.54
2 Lantai kerja Poer Tebal 5 cm K-175 (f'c=14,5MPa) m3 2.62 Rp 1,288,263.75 Rp 3,375,655.75
3 Poer (Pile Cap)
3.1 P1 (100x100x30 cm) mutu beton K-225 (f'c=18,675 MPa) m3 6.60 Rp 5,992,579.02 Rp 39,551,021.51
3.2 P2 (150x75x30 cm) mutu beton K-225 (f'c=18,675 MPa) m3 6.75 Rp 8,478,302.79 Rp 57,228,543.81
4 Lantai Kerja Sloof T=5Cm m3 1.97 Rp 1,288,263.75 Rp 2,537,718.55
5 S1 - 15 x 25 cm, Mutu K-225 (f'c=18,675 MPa) m3 5.79 Rp 10,507,272.47 Rp 60,833,167.39
6 S2 - 15 x 20 cm, Mutu K-225 (f'c=18,675 MPa) m3 0.10 Rp 1,288,263.75 Rp 123,673.32
7 Lantai kerja beton wiremesh K-175 (f'c=14,5MPa) m3 3.37 Rp 1,288,263.75 Rp 4,340,611.47
8 Plat beton wiremesh tebal 10 cm m3 6.74 Rp 3,253,390.23 Rp 21,923,620.71
9 Kolom K1 - 25x25 cm, Mutu K-225 (f'c=18,675 MPa) m3 5.78 Rp 10,905,916.54 Rp 62,981,668.03
10 Kolom K2 - 25x25 cm, Mutu K-225 (f'c=18,675 MPa) m3 6.05 Rp 13,265,366.59 Rp 80,255,467.88
11 Kolom KP - 12 x 12 cm K-175 (f'c=14,5MPa) m3 0.06 Rp 13,248,490.29 Rp 782,190.87
12 Kolom KP1 - 20 x 12 cm K-175 (f'c=14,5MPa) m3 0.39 Rp 13,360,721.37 Rp 5,258,779.93
13 Plat Beton bawah BK- ( 0,47 x 3.63 x 0,12 ) K-225 (f'c=18,675 MPa) elev. 2.52m m3 3.27 Rp 9,077,488.04 Rp 29,668,680.37
14 Balok BR-12x20 cm mutu K-175 Elev. 2.90m m3 2.26 Rp 14,191,572.55 Rp 32,040,029.52
15 Balok B1 - 20x30 cm, Mutu K-225 (f'c=18,675 MPa) Elevasi +3.50m m3 10.92 Rp 8,712,948.65 Rp 95,124,488.22
16 Balok B2 - 20x30 cm, Mutu K-225 (f'c=18,675 MPa) Elevasi +3.50m m3 0.86 Rp 9,176,681.19 Rp 7,846,062.41
17 Balok Lisplank 10/50, Mutu K-225 (f'c=17,89 MPa) m3 2.90 Rp 10,983,653.27 Rp 31,825,135.35
18 Beton Plat Atap - tebal 10 cm K-225 (f'c=18,675 MPa) Elevasi 3,50m m3 21.48 Rp 8,453,889.21 Rp 181,589,540.28
19 Balok B1 - 20x30 cm, Mutu K-225 (f'c=18,675 MPa) Elevasi +4.00m m3 4.16 Rp 8,712,948.65 Rp 36,280,718.19
20 Balok B2 - 20x30 cm, Mutu K-225 (f'c=18,675 MPa) Elevasi +4.00m m3 0.57 Rp 9,176,681.19 Rp 5,230,708.28
21 Balok Gewel
22 Kolom KP - 12 x 12 cm K-175 (f'c=14,5MPa) m3 0.12 Rp 13,248,490.29 Rp 1,602,537.38
23 Balok Gewel BR-12x20 cm mutu K-175 m3 0.25 Rp 14,191,572.55 Rp 3,542,216.51
24 Screet lantai atap 1PC : 2 PS m2 214.80 Rp 200,034.32 Rp 42,967,371.94
25 Water Proofing lantai atap m2 214.80 Rp 83,250.00 Rp 17,882,100.00

PEKERJAAN BETON Jumlah Rp 850,646,332.23

IV. PEKERJAAN ATAP


A Atap utama
1 Kuda-kuda WF 150.75.5.7 kg 1,344.62 Rp 75,875.00 Rp 102,022,701.82
2 Pasang gording besi Canal C150.65.20.2,3 (termasuk mur baut) kg 2,259.01 Rp 124,175.00 Rp 280,513,059.48
3 Pasang penguat gording besi siku L70.70.7 kg 106.27 Rp 45,975.00 Rp 4,885,855.20
4 Pasang pengaku gording besi dia. 10 mm (Sagrot) kg 117.61 Rp 52,300.00 Rp 6,151,039.85
5 Pasang Ikatan Angin dia.12 mm kg 80.86 Rp 52,300.00 Rp 4,229,217.20
6 Pasang jarum keras ɸ 12 mm bh 16.00 Rp 170,000.00 Rp 2,720,000.00
7 Pasang plat flendes & base plat t = 10 mm kg 78.50 Rp 75,875.00 Rp 5,956,187.50
8 Pasang plat sambungan t =10 mm kg 65.47 Rp 75,875.00 Rp 4,967,460.38
9 Pasang plat RIB t =8 mm kg 38.26 Rp 75,875.00 Rp 2,903,188.74
NO.
ITEM PEKERJAAN SAT. VOLUME HARGA SATUAN JUMLAH HARGA

10 Pasang Atap genteng Karangpilang m2 374.54 Rp 255,065.00 Rp 95,531,705.00


11 Pasang rangka atap Usuk Galvalume C75.75 dan reng U30 t=0.45mm m2 374.54 Rp 217,943.68 Rp 81,628,334.62
12 Pasang Wuwung Genteng karangpilang m1 36.00 Rp 200,986.80 Rp 7,235,524.80
13 Pasang Lisplank woodplank 2x(0.8x30cm) m1 92.81 Rp 198,786.00 Rp 18,448,872.19
13 Mur Baut HTB ɸ 12 mm Bh 128.00 Rp 22,433.95 Rp 2,871,546.05
14 Pasang besi tarik ɸ 16 mm kg 97.23 Rp 52,300.00 Rp 5,084,894.01
15 Pasang jarum keras ɸ 16 mm Bh 8.00 Rp 180,000.00 Rp 1,440,000.00
16 Angkur ɸ 19 - 400 mm Bh 64.00 Rp 210,000.00 Rp 13,440,000.00
17 Pasang Flashing Aluminium m' 20.83 Rp 185,000.00 Rp 3,853,697.58
B Atap tambahan
17 Kuda-kuda Galvalume termasuk rangka atap m2 83.86 Rp 283,735.00 Rp 23,793,271.05
18 Pasang Atap UPVC tebal 10mm m2 83.86 Rp 423,760.00 Rp 35,535,399.37
19 Lisplank 0.8x30cm m' 30.50 Rp 139,978.00 Rp 4,269,329.00
20 Flashsing Aluminium m' 27.00 Rp 185,000.00 Rp 4,995,000.00

PEKERJAAN ATAP Jumlah Rp 712,476,283.82

V. PEKERJAAN PASANGAN DINDING


1 Pasangan dinding Trasraam 1/2 bata 1PC : 2 PS Dibawah elevasi +0.30m m2 143.02 Rp 252,806.13 Rp 36,156,079.19
2 Plesteran dinding 1PC : 2 PS m2 81.53 Rp 102,717.16 Rp 8,374,345.16
3 Pasangan dinding Trasraam 1/2 bata 1PC : 2 PS Diatas elevasi +0.30m m2 25.89 Rp 252,806.13 Rp 6,545,150.58
4 Pasangan dinding 1/2 bata 1PC : 4 PS Diatas elevasi +0.30m m2 378.81 Rp 243,776.25 Rp 92,344,674.05
4 Plesteran dinding 1PC : 2 PS m2 25.89 Rp 102,717.16 Rp 2,659,347.27
5 Plesteran dinding 1PC : 4 PS m2 1,274.49 Rp 100,017.16 Rp 127,471,230.31
6 Acian m2 1,300.38 Rp 72,964.38 Rp 94,881,676.63
7 Benangan
7.1 Kusen m' 564.32 Rp 93,238.75 Rp 52,616,491.40
7.2 Balok m' 82.53 Rp 93,238.75 Rp 7,695,273.75
7.3 Kolom m' 211.20 Rp 93,238.75 Rp 19,692,024.00
7.4 Benangan Lisplank & plat beton bawah m' 656.30 Rp 93,238.75 Rp 61,192,591.62
. Acian
8.1 Balok m2 17.66 Rp 72,964.38 Rp 1,288,470.60
8.2 Kolom m2 23.14 Rp 72,964.38 Rp 1,688,541.57
8.3 Lisplank & plat beton bawah sunscreen m2 78.29 Rp 72,964.38 Rp 5,712,672.78
9 Tali air (benangan) diatas granite dinding tinggi 90 cm m' 65.78 Rp 93,238.75 Rp 6,133,244.98

PEKERJAAN PASANGAN DINDING Jumlah Rp 524,451,813.90

VI. PEKERJAAN KUSEN PINTU, JENDELA DAN DINDING PARTISI


1 LANTAI 1

1.1 P-1 (Kusen Aluminium 4'' warna putih Profil + Daun Pintu Slimar kamper + triplek Finish HPL) unit 7.00 Rp 11,701,563.30 Rp 81,910,943.08

1.2 P-2 (Kusen Aluminium 4'' warna putih Profil + Daun Pintu SWP Finish SemiDuco Pabrikan) unit 16.00 Rp 11,385,254.12 Rp 182,164,065.92

1.3 P-3 (Daun Pintu Aluminium 4'' warna putih Profil + Daun Pintu Double Spandrill) unit 5.00 Rp 6,381,603.99 Rp 31,908,019.93
1.4 J-1 unit 9.00 Rp 3,818,989.40 Rp 34,370,904.60
1.5 BV unit 2.00 Rp 1,453,742.70 Rp 2,907,485.40
1.6 BV-1 unit 10.00 Rp 2,604,462.47 Rp 26,044,624.70
1.7 SC-1 unit 2.00 Rp 1,775,573.38 Rp 3,551,146.76
1.8 SC-2 unit 4.00 Rp 1,977,159.62 Rp 7,908,638.48
1.9 SC-3 unit 8.00 Rp 2,031,887.00 Rp 16,255,096.00
1.10 SC-4 unit 8.00 Rp 2,419,659.48 Rp 19,357,275.84
1.11 DP (termasuk cat) m2 47.92 Rp 571,942.72 Rp 27,408,638.99

PEKERJAAN KUSEN PINTU, JENDELA DAN DINDING PARTISI Jumlah Rp 433,786,839.70

VII. PEKERJAAN PASANG GRANITE


1 LANTAI 1
1.1 Lantai kerja Granite m3 22.30 Rp 1,288,263.75 Rp 28,732,326.77
1.2 Granit Tile Uk. 60X60 Cm Polished (F1) m2 217.20 Rp 649,227.50 Rp 141,009,875.78
1.3 Granit Tile Uk. 60X60 Cm UnPolished (F2) m2 215.05 Rp 681,051.50 Rp 146,457,400.87
1.4 Granit Tile Uk. 60X60 Cm UnPolished (Lantai kamar mandi) F3 m2 13.82 Rp 656,175.00 Rp 9,068,600.97
1.5 Granit Tile Uk. 60X60 Cm (Dinding Kamar Mandi) m2 53.28 Rp 643,135.75 Rp 34,266,272.76
1.6 Granit Tile Uk. 60X60 Cm tinggi 90cm (Dinding Luar) m2 38.15 Rp 643,135.75 Rp 24,536,272.00
1.7 Granit Tile meja beton Uk. 60X60 Cm m2 2.40 Rp 643,135.75 Rp 1,543,525.80
1.8 Granit Tile dinding meja beton Uk. 60X60 Cm m2 3.02 Rp 643,135.75 Rp 1,944,842.51
NO.
ITEM PEKERJAAN SAT. VOLUME HARGA SATUAN JUMLAH HARGA

1.9 Pemasangan Kolom Granite Tile Uk. 60x60 cm m2 69.12 Rp 681,635.75 Rp 47,114,663.04
1.10 Pemasangan Plint Granite Tile Uk. 10x60 cm m' 349.75 Rp 98,271.00 Rp 34,370,282.25
1.11 Pemasangan Floor Hardeneer 5kg/m2 m2 74.97 Rp 93,726.00 Rp 7,026,497.63
1.12 Beton rabat tebal 10 cm m3 0.89 Rp 1,288,263.75 Rp 1,143,978.21

PEKERJAAN PASANG GRANITE Jumlah Rp 477,214,538.59

VIII. PENGECATAN
1 LANTAI 1
1.1 Cat dinding Eksterior Waterproof m2 215.90 Rp 99,070.00 Rp 21,389,530.02
1.2 Cat Dinding Interior anti bakteri m2 1,089.15 Rp 81,670.00 Rp 88,951,243.93
1.3 Cat Dinding Interior anti bakteri dalam toilet m2 60.30 Rp 81,670.00 Rp 4,924,701.00

PENGECATAN Jumlah Rp 115,265,474.96

IX. PEKERJAAN PLAFOND


1 LANTAI 1
1.1 Pasang Plafond PVC Warna putih 6mm x 20cm + rangka galvalume Hollow 4/4 dan 2/4 + (termasuk
m2 Manhole)
549.49 Rp 441,194.03 Rp 242,432,280.29
1.2 Pemasangan Lis plafond PVC (dinding ) m' 523.49 Rp 89,100.00 Rp 46,642,959.00
1.3 Pemasangan Lis plafond PVC (Siku/drof ceilling bawah) m' 21.50 Rp 50,775.00 Rp 1,091,662.50
1.4 Pemasangan Lis plafond PVC (Siku/drof ceilling bawah) m' 21.50 Rp 44,475.00 Rp 956,212.50

PEKERJAAN PLAFOND Jumlah Rp 291,123,114.29

X. PEKERJAAN SANITAIR
1 LANTAI 1
1.1 Closet Duduk Monoblok unit 5.00 Rp 5,943,365.00 Rp 29,716,825.00
1.2 Jet Spray bh 5.00 Rp 771,100.00 Rp 3,855,500.00
1.3 Kran air 1/2" bh 5.00 Rp 209,175.00 Rp 1,045,875.00
1.4 Floor drain Stainless Steel ɸ 3" bh 5.00 Rp 263,300.00 Rp 1,316,500.00
1.5 Sink kolam dalam termasuk Kran Air & Kelengkapannya unit 1.00 Rp 1,032,050.00 Rp 1,032,050.00
1.6 Meja beton Sink Tebal 10 cm m3 0.24 Rp 7,713,084.21 Rp 1,851,140.21

PEKERJAAN SANITAIR Jumlah Rp 38,817,890.21

XI. PEKERJAAN MEUBELAIR


1 Kursi konferensi dengan roda unit 6.00 Rp 3,750,000.00 Rp 22,500,000.00
2 Meja R. Kasie dan R. Kasub unit 3.00 Rp 6,500,000.00 Rp 19,500,000.00
3 Lemari R. Kasie dan R. Kasub unit 3.00 Rp 5,400,000.00 Rp 16,200,000.00
4 Backdrop R. Workshop unit 1.00 Rp 47,753,196.47 Rp 47,753,196.47

PEKERJAAN MEUBELAIR Jumlah Rp 105,953,196.47

XII. PEKERJAAN ELEKTRIKAL & AC (AIR CONDITIONER)


1 LANTAI 1
1.1 Penyambungan listrik ke meteran LS 1.00 Rp 15,000,000.00 Rp 15,000,000.00
1.2 AC Splitz Kapasitas 1 PK Anti bacteri (termasuk instalasi pipa, kabel, lengkap & terpasang) Unit 17.00 Rp 8,594,000.00 Rp 146,098,000.00
1.3 Exhaust Fan Ceilling bh 5.00 Rp 672,200.00 Rp 3,361,000.00
1.4 Instalasi Titik Lampu Ttk 145.00 Rp 390,700.00 Rp 56,651,500.00
1.5 Instalasi Stop kontak + Stop Kontak Dinding Ttk 20.00 Rp 449,200.00 Rp 8,984,000.00
1.6 Instalasi Stop kontak + Stop Kontak AC Ttk 17.00 Rp 489,200.00 Rp 8,316,400.00
1.7 Lampu LED Downlight 24 W bh 20.00 Rp 414,900.00 Rp 8,298,000.00
1.8 Lampu LED Downlight 5 W bh 94.00 Rp 109,900.00 Rp 10,330,600.00
1.9 Lampu LED Downlight 9 W bh 11.00 Rp 139,400.00 Rp 1,533,400.00
1.10 Lampu LED Downlight 16 W bh 20.00 Rp 139,400.00 Rp 2,788,000.00
1.11 Saklar tunggal bh 3.00 Rp 47,900.00 Rp 143,700.00
1.12 Saklar Ganda bh 23.00 Rp 52,900.00 Rp 1,216,700.00
1.13 Panel Box Uk. 40x60x20 cm (Lengkap) + 1bh MCCB 35A 3 PHASE + 17bh MCB 10A 1 PHASE unit 1.00 Rp 11,636,700.00 Rp 11,636,700.00

PEKERJAAN ELEKTRIKAL & AC (AIR CONDITIONER) Jumlah Rp 274,358,000.00

XIII. PEKERJAAN INSTALASI AIR BERSIH


1 LANTAI 1
1.1 Pipa Air Bersih PVC AW Ø 1'' m' 120.00 Rp 92,030.00 Rp 11,043,600.00
1.2 Pipa Air Bersih PVC AW Ø 3/4'' m' 8.00 Rp 85,055.00 Rp 680,440.00
1.3 Pipa Air Bersih PVC AW Ø 1/2'' m' 15.00 Rp 63,510.00 Rp 952,650.00
NO.
ITEM PEKERJAAN SAT. VOLUME HARGA SATUAN JUMLAH HARGA

PEKERJAAN INSTALASI AIR BERSIH Jumlah Rp 12,676,690.00

XIV. PEKERJAAN INSTALASI KOTOR


1 LANTAI 1
1.1 Biotank Kapasitas 2 m3 termasuk pipa udara bh 2.00 Rp 16,800,000.00 Rp 33,600,000.00
1.2 Pipa PVC AW Ø 4'' m' 48.00 Rp 535,835.00 Rp 25,720,080.00

PEKERJAAN INSTALASI KOTOR Jumlah Rp 59,320,080.00

XV. PEKERJAAN INSTALASI AIR BEKAS & HUJAN


1 LANTAI 1
1.1 Pipa PVC AW Ø 3'' m' 56.00 Rp 254,200.00 Rp 14,235,200.00
1.2 Pipa PVC AW Ø 4'' m' 64.00 Rp 535,835.00 Rp 34,293,440.00
1.3 Pipa PVC AW Ø 3'' yang ditanam dalam Kolom m' 60.00 Rp 254,200.00 Rp 15,252,000.00
1.4 Roof Drain diameter 3" bh 12.00 Rp 263,300.00 Rp 3,159,600.00

PEKERJAAN INSTALASI AIR BEKAS & HUJAN Jumlah Rp 66,940,240.00

XV. PEKERJAAN AKHIR

1 Pembersihan Akhir lokasi pekerjaan (termasuk pembuangan material bekas bongkaran keluar ls 1.00 Rp 37,500,000.00 Rp 37,500,000.00

PEKERJAAN AKHIR Jumlah Rp 37,500,000.00

Jumlah Total Rp 4,126,009,841.95


ANALISA HARGA SATUAN PEKERJAAN
PEKERJAAN PERSIAPAN
Pengukuran titik kolom per titik
Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Kayu meranti 5/7 M3 0.0120 Rp 7,000,000.00 Rp 84,000.00
Bahan Paku biasa 2" - 5" Kg 0.0500 Rp 42,900.00 Rp 2,145.00
Kayu meranti Bekesting M3 0.0080 Rp 4,500,000.00 Rp 36,000.00
Tukang Kayu OH 0.1000 Rp 165,000.00 Rp 16,500.00
Pekerja OH 0.1000 Rp 155,000.00 Rp 15,500.00
Tenaga Kerja
Kepala Tukang OH 0.0045 Rp 180,000.00 Rp 810.00
Mandor OH 0.0100 Rp 250,000.00 Rp 2,500.00
Jumlah Rp 157,455.00

Pengupasan plester dan pembersihan per m2


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Pekerja OH 0.14 Rp 155,000.00 Rp 21,700.00
Tenaga Kerja
Mandor OH 0.01 Rp 250,000.00 Rp 1,750.00
Jumlah Rp 23,450.00

PEKERJAAN TANAH
Menggali 1 M3 Tanah Biasa untuk konstruksi
Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Pekerja OH 0.7500 Rp 155,000.00 Rp 116,250.00
Tenaga Kerja
Mandor OH 0.0250 Rp 250,000.00 Rp 6,250.00
Jumlah Rp 122,500.00

Mengurug Kembali 1 M3 Galian


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Pekerja OH 0.5000 Rp 155,000.00 Rp 77,500.00
Tenaga Kerja
Mandor OH 0.0500 Rp 250,000.00 Rp 12,500.00
Jumlah Rp 90,000.00

Mengurug 1M3 Sirtu


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Bahan Sirtu M3 1.2000 Rp 250,000.00 Rp 300,000.00
Pekerja OH 0.2500 Rp 155,000.00 Rp 38,750.00
Tenaga Kerja
Mandor OH 0.0250 Rp 250,000.00 Rp 6,250.00
Sewa alat Stamper OH 0.1000 Rp 104,000.00 Rp 10,400.00
Jumlah Rp 355,400.00

Mengurug 1 M3 Pasir Urug


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Bahan Pasir Urug M3 1.2000 Rp 185,000.00 Rp 222,000.00
Pekerja OH 0.3000 Rp 155,000.00 Rp 46,500.00
Tenaga Kerja
Mandor OH 0.0100 Rp 250,000.00 Rp 2,500.00
Jumlah Rp 271,000.00

Pembuatan lubang Strouss diameter 30 cm kedalaman 3


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
sewa Alat bantu Strouss diameter 30 cm jam 1.2000 75,000.00 Rp 90,000.00
Pekerja OH 1.4400 Rp 155,000.00 Rp 223,200.00
Tenaga Kerja
Mandor OH 0.0720 Rp 250,000.00 Rp 18,000.00
Jumlah Rp 331,200.00
per m' Rp 110,400.00

PEKERJAAN BETON
Membuat 1 M3 Beton Mutu f'c = 14.5 MPa (K175), Slump (12 ± 2) cm, w/c : 0.66
Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
PC (1 zak = 40 kg) Zak 8.1500 Rp 61,100.00 Rp 497,965.00
Pasir beton M3 0.4806 Rp 550,000.00 Rp 264,343.75
Bahan
Batu pecah mesin 1/2 M3 0.5416 Rp 362,500.00 Rp 196,330.00
Air Ltr 215.0000 Rp 100.00 Rp 21,500.00
Tenaga Kerja Pekerja OH 1.6500 Rp 155,000.00 Rp 255,750.00
Tukang Batu OH 0.2750 Rp 165,000.00 Rp 45,375.00
Mandor OH 0.0280 Rp 250,000.00 Rp 7,000.00
Jumlah Rp 1,288,263.75

Membuat 1 M3 Beton Mutu f'c = 20,75 MPa (K-250)


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
PC (1 zak = 40 kg) Zak 9.6000 Rp 61,100.00 Rp 586,560.00
Pasir beton M3 0.4325 Rp 550,000.00 Rp 237,875.00
Bahan
Batu pecah mesin 1/2 M3 0.5468 Rp 362,500.00 Rp 198,230.23
Air Ltr 215.0000 Rp 100.00 Rp 21,500.00
Pekerja OH 1.6500 Rp 155,000.00 Rp 255,750.00
Tenaga Kerja Kepala Tukang OH 0.2750 Rp 180,000.00 Rp 49,500.00
Mandor OH 0.0280 Rp 250,000.00 Rp 7,000.00
Jumlah Rp 1,356,415.23
Membuat 1 M3 Beton Mutu f'c = 18,675 MPa (K-225)
Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
PC (1 zak = 40 kg) Zak 9.2750 Rp 61,100.00 Rp 566,702.50
Pasir beton M3 0.4363 Rp 550,000.00 Rp 239,937.50
Bahan
Batu pecah mesin 1/2 M3 0.5511 Rp 362,500.00 Rp 199,756.71
Air Ltr 215.0000 Rp 100.00 Rp 21,500.00
Pekerja OH 1.6500 Rp 155,000.00 Rp 255,750.00
Tenaga Kerja Kepala Tukang OH 0.2750 Rp 180,000.00 Rp 49,500.00
Mandor OH 0.0280 Rp 250,000.00 Rp 7,000.00
Jumlah Rp 1,340,146.71

Pembesian Per 1Kg Besi beton polos/ulir


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Besi beton polos/ulir Kg 1.05 Rp 24,500.00 Rp 25,725.00
Bahan
Kawat Beton Kg 0.015 Rp 23,500.00 Rp 352.50
Pekerja OH 0.007 Rp 155,000.00 Rp 1,085.00
Tenaga Kerja Tukang Besi OH 0.007 Rp 165,000.00 Rp 1,155.00
Mandor OH 0.0007 Rp 250,000.00 Rp 175.00
Jumlah Rp 28,492.50

Pembesian Per 1Kg Besi Wiremesh M-8


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Besi Wiremesh M-8 Kg 1.05 Rp 24,500.00 Rp 25,725.00
Bahan
Kawat Beton Kg 0.015 Rp 23,500.00 Rp 352.50
Pekerja OH 0.007 Rp 155,000.00 Rp 1,085.00
Tenaga Kerja Tukang Besi OH 0.007 Rp 165,000.00 Rp 1,155.00
Mandor OH 0.0007 Rp 250,000.00 Rp 175.00
Jumlah Rp 28,492.50

Plat Beton wiremesh M8 ( 6 x 6 x 0,1 ) K-225 (f'c=18,675 MPa)


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Spesi beton M3 1.000 Rp 1,356,415.23 Rp 1,356,415.23
Bahan Besi Wiremesh M-8 Kg 58.000 Rp 28,492.50 Rp 1,652,565.00
Begesting x Pakai M2 0.667 Rp 366,615.00 Rp 244,410.00
Jumlah Rp 3,253,390.23

Memasang & Bongkar 1 M2 Bekisting Untuk Pondasi


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Kayu meranti Bekesting M3 0.045 Rp 4,500,000.00 Rp 202,500.00
Bahan Paku 5-10 cm Kg 0.3 Rp 42,900.00 Rp 12,870.00
Minyak Bekisting Ltr 0.1 Rp 6,600.00 Rp 660.00
Rp 216,030.00
Pekerja OH 0.52 Rp 155,000.00 Rp 80,600.00
Tukang Kayu OH 0.26 Rp 165,000.00 Rp 42,900.00
Tenaga Kerja
Kepala Tukang OH 0.0262 Rp 180,000.00 Rp 4,716.00
Mandor OH 0.0265 Rp 250,000.00 Rp 6,625.00
Jumlah Rp 134,841.00
Bahan Tenaga
2 x pakai Rp 108,015.00 Rp 134,841.00 Rp 242,856.00

Memasang & Bongkar 1 M2 Bekisting Untuk Sloof


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Kayu meranti Bekesting M3 0.045 Rp 4,500,000.00 Rp 202,500.00
Bahan Paku 5-10 cm Kg 0.3 Rp 42,900.00 Rp 12,870.00
Minyak Bekisting Ltr 0.1 Rp 6,600.00 Rp 660.00
Rp 216,030.00
Pekerja OH 0.52 Rp 155,000.00 Rp 80,600.00
Tenaga Kerja Tukang Kayu OH 0.26 Rp 165,000.00 Rp 42,900.00
Mandor OH 0.026 Rp 250,000.00 Rp 6,500.00
Jumlah Rp 130,000.00
Bahan Tenaga
2 x pakai Rp 108,015.00 Rp 130,000.00 Rp 238,015.00
Memasang & Bongkar 1 M2 Bekisting Untuk Kolom
Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Paku usuk Kg 0.4 Rp 42,900.00
Rp 17,160.00
Minyak Bekisting Ltr 0.2 Rp 6,600.00
Rp 1,320.00
Kayu Meranti Bekisting M3 0.04 Rp 4,500,000.00
Rp 180,000.00
Kayu Meranti Balok M3 0.015 Rp 7,000,000.00
Rp 105,000.00
Multiplek film satu sisi (120x240) 12 mm Lbr 0.35 Rp 285,000.00
Rp 99,750.00
Rp 403,230.00
Pekerja OH 0.66 Rp 155,000.00 Rp 102,300.00
Tenaga Kerja Tukang Kayu OH 0.33 Rp 165,000.00 Rp 54,450.00
Mandor OH 0.033 Rp 250,000.00 Rp 8,250.00
Jumlah Rp 165,000.00
Bahan Tenaga
2 x pakai Rp 201,615.00 Rp 165,000.00 Rp 366,615.00
Memasang & Bongkar 1 M2 Bekisting Untuk Balok
Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Kayu Meranti Bekisting M3 0.04 Rp 4,500,000.00
Rp 180,000.00
Paku 5-12 cm Kg 0.4 Rp 42,900.00
Rp 17,160.00
Bahan Minyak Bekisting Ltr 0.2 Rp 6,600.00
Rp 1,320.00
Kayu Meranti Balok M3 0.018 Rp 7,000,000.00
Rp 126,000.00
Multiplek film satu sisi (120x240) 12 mm Lbr 0.35 Rp 285,000.00
Rp 99,750.00
Rp 424,230.00
Pekerja OH 0.66 Rp 155,000.00 Rp 102,300.00
Tenaga Kerja Tukang Kayu OH 0.33 Rp 165,000.00 Rp 54,450.00
Mandor OH 0.033 Rp 250,000.00 Rp 8,250.00
Jumlah Rp 165,000.00
Bahan Tenaga
2 x pakai Rp 212,115.00 Rp 165,000.00 Rp 377,115.00

Memasang 1 M2 & Bongkar Bekisting Untuk Plat Lantai


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Kayu Meranti Bekisting M3 0.04 Rp 4,500,000.00
Rp 180,000.00
Paku 5-12 cm Kg 0.4 Rp 42,900.00
Rp 17,160.00
Bahan Minyak Bekisting Ltr 0.2 Rp 6,600.00
Rp 1,320.00
Kayu Meranti Balok M3 0.015 Rp 7,000,000.00
Rp 105,000.00
Multiplek film satu sisi (120x240) 12 mm Lbr 0.35 Rp 285,000.00
Rp 99,750.00
Rp 403,230.00
Pekerja OH 0.66 Rp 155,000.00 Rp 102,300.00
Tenaga Kerja Tukang Kayu OH 0.33 Rp 165,000.00 Rp 54,450.00
Mandor OH 0.033 Rp 250,000.00 Rp 8,250.00
Jumlah Rp 165,000.00
Bahan Tenaga
2 x pakai Rp 201,615.00 Rp 165,000.00 Rp 366,615.00

Membuat 1 M3 Beton Plat Lantai ATAP ( 3 x 3 x 0,1 ) K-225 (f'c=18,675 MPa)


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Spesi beton M3 1.000 Rp 1,340,146.71 Rp 1,340,146.71
Bahan Pembesian beton polos Kg 121.000 Rp 28,492.50 Rp 3,447,592.50
Begesting 2 x Pakai M2 10.000 Rp 366,615.00 Rp 3,666,150.00
Jumlah Rp 8,453,889.21

Membuat 1 M3 Beton Meja Beton ( 0,6 x 4 x 0,1 ) K-225 (f'c=18,675 MPa)


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Spesi beton M3 1.000 Rp 1,340,146.71 Rp 1,340,146.71
Bahan Pembesian beton polos Kg 95.000 Rp 28,492.50 Rp 2,706,787.50
Begesting 2 x Pakai M2 10.000 Rp 366,615.00 Rp 3,666,150.00
Jumlah Rp 7,713,084.21

Membuat 1 M3 Beton Plat Beton bawah SC ( 0,47 x 3 x 0,12 ) K-225 (f'c=18,675 MPa)
Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Spesi beton M3 1.000 Rp 1,340,146.71 Rp 1,340,146.71
Bahan Pembesian beton polos Kg 101.000 Rp 28,492.50 Rp 2,877,742.50
Begesting 2 x Pakai M2 13.255 Rp 366,615.00 Rp 4,859,598.83
Jumlah Rp 9,077,488.04

Membuat 1 m3 Poer 1 - (100 x 100 x 30 cm) - K-225 (f'c=18.675 Mpa)


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Spesi beton M3 1.00 Rp 1,340,146.71 Rp 1,340,146.71
Bahan Pembesian ulir Kg 129.19 Rp 28,492.50 Rp 3,681,008.30
Begesting 2 x Pakai M2 4.00 Rp 242,856.00 Rp 971,424.00
Jumlah Rp 5,992,579.02

Membuat 1 m3 Poer 2 - (150 x 75 x 30 cm) - K-225 (f'c=18.675 Mpa)


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Spesi beton M3 1.00 Rp 1,340,146.71 Rp 1,340,146.71
Bahan Pembesian ulir Kg 216.43 Rp 28,492.50 Rp 6,166,732.07
Bahan
Begesting 2 x Pakai M2 4.00 Rp 242,856.00 Rp 971,424.00
Jumlah Rp 8,478,302.79

Strouss Diameter 30cm K-225 (f'c=18,675 MPa)


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Spesi beton M3 1.00 Rp 1,340,146.71 Rp 1,340,146.71
Bahan Pembesian beton polos Kg 38.08 Rp 28,492.50 Rp 1,084,890.73
Pembesian beton ulir Kg 75.36 Rp 28,492.50 Rp 2,147,064.00
Jumlah Rp 4,572,101.44
Membuat 1 m3 sloof S1 = 15x25 K-225 (f'c=18,675 MPa) BENGKEL ELEKTROMEDIS
Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Spesi beton M3 1.000 Rp 1,340,146.71 Rp 1,340,146.71
Pembesian polos Kg 54.111 Rp 28,492.50 Rp 1,541,760.11
Bahan
Pembesian ulir Kg 156.25 Rp 28,492.50 Rp 4,451,832.32
Begesting 2 x Pakai M2 13.333 Rp 238,015.00 Rp 3,173,533.33
Jumlah Rp 10,507,272.47
Membuat 1 m3 sloof S2 = 15x20 K-225 (f'c=18,675 MPa) BENGKEL ELEKTROMEDIS
Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Spesi beton M3 1.000 Rp 1,340,146.71 Rp 1,340,146.71
Pembesian polos Kg 60.123 Rp 28,492.50 Rp 1,713,066.79
Bahan
Pembesian ulir Kg 130.20 Rp 28,492.50 Rp 3,709,860.26
Begesting 2 x Pakai M2 13.333 Rp 238,015.00 Rp 3,173,533.33
Jumlah Rp 9,936,607.10

Membuat 1 m3 Balok Beton B1 = 20x30 K-225 (f'c=18,675 MPa) BENGKEL ELEKTROMEDIS


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Spesi beton M3 1.000 Rp 1,340,146.71 Rp 1,340,146.71
Pembesian polos Kg 37.577 Rp 28,492.50 Rp 1,070,666.74
Bahan
Pembesian ulir Kg 97.65 Rp 28,492.50 Rp 2,782,395.20
Begesting 2 x Pakai M2 9.333 Rp 377,115.00 Rp 3,519,740.00
Jumlah Rp 8,712,948.65

Membuat 1 m3 Balok Beton B2 = 20x30 K-225 (f'c=18,675 MPa) BENGKEL ELEKTROMEDIS


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Spesi beton M3 1.000 Rp 1,340,146.71 Rp 1,340,146.71
Pembesian polos Kg 37.577 Rp 28,492.50 Rp 1,070,666.74
Bahan
Pembesian ulir Kg 113.93 Rp 28,492.50 Rp 3,246,127.73
Begesting 2 x Pakai M2 9.333 Rp 377,115.00 Rp 3,519,740.00
Jumlah Rp 9,176,681.19

Membuat 1 m3 Balok Beton BA = 10x50 K-225 (f'c=18,675 MPa) BENGKEL ELEKTROMEDIS


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Spesi beton M3 1.000 Rp 1,340,146.71 Rp 1,340,146.71
Pembesian polos Kg 67.404 Rp 28,492.50 Rp 1,920,508.47
Bahan
Pembesian ulir Kg 43.40 Rp 28,492.50 Rp 1,236,620.09
Begesting 2 x Pakai M2 17.200 Rp 377,115.00 Rp 6,486,378.00
Jumlah Rp 10,983,653.27

Membuat 1 m3 Balok Beton BR = 12x20 K-175 (f'c=14.5 MPa ) BENGKEL ELEKTROMEDIS


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Spesi beton M3 1.000 Rp 1,288,263.75 Rp 1,288,263.75
Bahan Pembesian polos Kg 232.274 Rp 28,492.50 Rp 6,618,058.80
Begesting 2 x Pakai M2 16.667 Rp 377,115.00 Rp 6,285,250.00
Jumlah Rp 14,191,572.55

Membuat 1 m3 kolom K1 = 25x25 K-225 (f'c=18,675 MPa) BENGKEL ELEKTROMEDIS


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Spesi beton M3 1.00 Rp 1,340,146.71 Rp 1,340,146.71
Pembesian beton polos Kg 36.11 Rp 28,492.50 Rp 1,028,830.44
Bahan
Pembesian beton ulir Kg 93.75 Rp 28,492.50 Rp 2,671,099.39
Begesting 2 x Pakai M2 16.00 Rp 366,615.00 Rp 5,865,840.00
Jumlah Rp 10,905,916.54

Membuat 1 m3 kolom K2 = 25x25 K-225 (f'c=18,675 MPa) BENGKEL ELEKTROMEDIS


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Spesi beton M3 1.00 Rp 1,340,146.71 Rp 1,340,146.71
Pembesian beton polos Kg 56.42 Rp 28,492.50 Rp 1,607,547.56
Bahan
Pembesian beton ulir Kg 156.25 Rp 28,492.50 Rp 4,451,832.32
Begesting 2 x Pakai M2 16.00 Rp 366,615.00 Rp 5,865,840.00
Jumlah Rp 13,265,366.59

Membuat 1 m3 kolom KP = 12x12 K-175 (f'c=14,5MPa) BENGKEL ELEKTROMEDIS


Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Spesi beton M3 1.00 Rp 1,288,263.75 Rp 1,288,263.75
Bahan Pembesian beton polos Kg 205.32 Rp 28,492.50 Rp 5,849,976.54
Begesting 2 x Pakai M2 16.67 Rp 366,615.00 Rp 6,110,250.00
Jumlah Rp 13,248,490.29
Membuat 1 m3 kolom KP1 = 12x20 K-175 (f'c=14,5MPa) BENGKEL ELEKTROMEDIS
Kebutuhan Satuan Indeks Harga Bahan / Upah Jml. Harga
Spesi beton M3 1.00 Rp 1,288,263.75 Rp 1,288,263.75
Bahan Pembesian beton polos Kg 209.26 Rp 28,492.50 Rp 5,962,207.62
Begesting 2 x Pakai M2 16.67 Rp 366,615.00 Rp 6,110,250.00
Jumlah Rp 13,360,721.37

Pekerjaan 1 M2 Waterproofing
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bahan Waterproofing Kg 0.3500 Rp 175,000.00 Rp 61,250.00
Pekerja OH 0.0500 Rp 155,000.00 Rp 7,750.00
Tenaga Kerja Tukang Cat OH 0.0750 Rp 165,000.00 Rp 12,375.00
Mandor OH 0.0075 Rp 250,000.00 Rp 1,875.00
Jumlah Rp 83,250.00
Pekerjaan Pemasangan Besi Profil (Termasuk Perakitan dan Pengelasan) per kg
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Mandor 0.0060 O.H Rp 250,000.00 Rp 1,500.00
Tenaga: Tukang Las 0.0600 O.H Rp 165,000.00 Rp 9,900.00
Pembantu Tukang 0.0600 O.H Rp 155,000.00 Rp 9,300.00
Besi Profil WF 1.1500 kg Rp 45,000.00 Rp 51,750.00
Bahan: Elektroda baja 0.0400 kg Rp 49,325.00 Rp 1,973.00
Cat Zincromate 0.0300 kg Rp 48,400.00 Rp 1,452.00
Jumlah: Rp 75,875.00

Pekerjaan Pemasangan Baja PLAT per kg


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Mandor 0.0060 O.H Rp 250,000.00 Rp 1,500.00
Tenaga: Tukang Las 0.0600 O.H Rp 165,000.00 Rp 9,900.00
Pekerja/Buruh Tak Terampil 0.0600 O.H Rp 155,000.00 Rp 9,300.00
Elektroda 0.04 kg Rp 49,325.00 Rp 1,973.00
Bahan Cat Zincromate 0.03 kg Rp 48,400.00 Rp 1,452.00
Baja Plat 1.1500 kg Rp 45,000.00 Rp 51,750.00
Jumlah: Rp 75,875.00

Pekerjaan Pemasangan Besi Profil CNP per kg


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Mandor 0.0060 O.H Rp 250,000.00 Rp 1,500.00
Tenaga: Tukang Las 0.0600 O.H Rp 165,000.00 Rp 9,900.00
Pekerja/Buruh Tak Terampil 0.0600 O.H Rp 155,000.00 Rp 9,300.00
Elektroda 0.0400 kg Rp 49,325.00 Rp 1,973.00
Bahan: Cat Zincromate 0.0300 kg Rp 48,400.00 Rp 1,452.00
Besi Profil CNP 1.1500 kg Rp 87,000.00 Rp 100,050.00
Jumlah: Rp 124,175.00

Pekerjaan Pemasangan Besi Profil Siku per kg


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Mandor 0.0060 O.H Rp 250,000.00 Rp 1,500.00
Tenaga: Tukang Las 0.0600 O.H Rp 165,000.00 Rp 9,900.00
Pekerja/Buruh Tak Terampil 0.0600 O.H Rp 155,000.00 Rp 9,300.00
Elektroda 0.0400 kg Rp 49,325.00 Rp 1,973.00
Bahan: Cat Zincromate 0.0300 kg Rp 48,400.00 Rp 1,452.00
Besi profil siku 70x70x7 1.1500 kg Rp 19,000.00 Rp 21,850.00
Jumlah: Rp 45,975.00

Pekerjaan Pemasangan Besi hollow per kg


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Mandor 0.0060 O.H Rp 250,000.00 Rp 1,500.00
Tenaga: Tukang 0.0600 O.H Rp 165,000.00 Rp 9,900.00
Pekerja 0.0600 O.H Rp 155,000.00 Rp 9,300.00
Besi hollow 1.1000 kg 19,000.00 Rp 20,900.00
Bahan:
Elektrode baja 0.0400 kg Rp 33,300.00 Rp 1,332.00
Jumlah: Rp 42,932.00
HOLLOW Nilai HSPK : 42,932.00

Pekerjaan Pemasangan Besi beton ikatan gording per kg


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Mandor 0.0060 O.H Rp 250,000.00 Rp 1,500.00
Tenaga: Tukang Las 0.0600 O.H Rp 165,000.00 Rp 9,900.00
Pekerja/Buruh Tak Terampil 0.0600 O.H Rp 155,000.00 Rp 9,300.00
Elektroda 0.0400 kg Rp 49,325.00 Rp 1,973.00
Bahan: Cat Zincromate 0.0300 kg Rp 48,400.00 Rp 1,452.00
Besi beton 1.1500 kg Rp 24,500.00 Rp 28,175.00
Jumlah: Rp 52,300.00

Pekerjaan Pemasangan baut - mur per bh


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Kepala Tukang Las 0.0030 O.H Rp 180,000.00 Rp 544.41
Pekerja/Buruh Tak Terampil 0.0606 O.H Rp 155,000.00 Rp 9,389.54
Bahan: Mur & Baut HTB Dia 12 mm 1.0000 bh Rp 12,500.00 Rp 12,500.00
Jumlah: Rp 22,433.95

Memasang rangka usuk dan reng baja ringan per m2


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Usuk Galvalume C75 tebal 0.75mm m' 2.200 Rp 35,833.33 Rp 78,833.33
Bahan Reng U30 t-0.45mm m' 3.793 Rp 13,000.00 Rp 49,310.34
Baut skrup baja ringan bh 30.000 Rp 275.00 Rp 8,250.00
Pekerja OH 0.4000 Rp 155,000.00 Rp 62,000.00
Tukang Kayu OH 0.1000 Rp 165,000.00 Rp 16,500.00
Tenaga Kerja
Kepala Tukang Kayu OH 0.010 Rp 180,000.00 Rp 1,800.00
Mandor OH 0.005 Rp 250,000.00 Rp 1,250.00
Jumlah Rp 217,943.68
Memasang 1 M2 Atap Genteng karangpilang
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bahan Genteng karangpilang M2 1.00 Rp 216,000.00 Rp 216,000.00
Pekerja OH 0.150 Rp 155,000.00 Rp 23,250.00
Tukang Kayu OH 0.075 Rp 165,000.00 Rp 12,375.00
Tenaga Kerja
Kepala Tukang Kayu OH 0.008 Rp 180,000.00 Rp 1,440.00
Mandor OH 0.008 Rp 250,000.00 Rp 2,000.00
Jumlah Rp 255,065.00

Memasang Bubungan Genteng Karangpilang per m'


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bubungan Genteng Karangpilang m' 1.000 Rp 141,000.00 Rp 141,000.00
Bahan Semen PC (1 sak = 40kg) sak 0.128 Rp 61,100.00 Rp 7,820.80
Pasir pasang m3 0.032 Rp 470,000.00 Rp 15,181.00
Pekerja OH 0.0840 Rp 155,000.00 Rp 13,020.00
Tukang Kayu OH 0.1250 Rp 165,000.00 Rp 20,625.00
Tenaga Kerja
Kepala Tukang Kayu OH 0.013 Rp 180,000.00 Rp 2,340.00
Mandor OH 0.004 Rp 250,000.00 Rp 1,000.00
Jumlah Rp 200,986.80

PEKERJAAN DINDING

Memasang 1 M2 Dinding Bata Merah Uk. (5x11x22) cm Tebal 1/2 Bata, Camp. Spesi 1 Pc : 2 Pp
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bata Merah Bh 70.0000 Rp 1,750.00 Rp 122,500.00
Bahan PC (1 zak = 40 kg) Zak 0.4738 Rp 61,100.00 Rp 28,946.13
PP M3 0.0380 Rp 470,000.00 Rp 17,860.00
Pekerja OH 0.3000 Rp 155,000.00 Rp 46,500.00
Tukang Batu OH 0.1000 Rp 165,000.00 Rp 16,500.00
Tenaga Kerja
Kepala tukang OH 0.1000 Rp 180,000.00 Rp 18,000.00
Mandor OH 0.0100 Rp 250,000.00 Rp 2,500.00
Jumlah Rp 252,806.13

Memasang 1 M2 Dinding Bata Merah Uk. (5x11x22) cm Tebal 1/2 Bata, Camp. Spesi 1 Pc : 4 Pp
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bata Merah Bh 70.0000 Rp 1,750.00 Rp 122,500.00
Bahan PC (1 zak = 40 kg) Zak 0.2875 Rp 61,100.00 Rp 17,566.25
PP M3 0.0430 Rp 470,000.00 Rp 20,210.00
Pekerja OH 0.3000 Rp 155,000.00 Rp 46,500.00
Tukang Batu OH 0.1000 Rp 165,000.00 Rp 16,500.00
Tenaga Kerja
Kepala tukang OH 0.1000 Rp 180,000.00 Rp 18,000.00
Mandor OH 0.0100 Rp 250,000.00 Rp 2,500.00
Jumlah Rp 243,776.25

PEKERJAAN PLESTERAN

Memasang 1 M2 Plesteran 1 PC : 2 PP, tebal 15 mm (Screeding)


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
PC (1 zak = 40 kg) Zak 0.2556 Rp 61,100.00 Rp 15,617.16
Bahan
PP M3 0.0200 Rp 470,000.00 Rp 9,400.00
Pekerja OH 0.300 Rp 155,000.00 Rp 46,500.00
Tenaga Kerja Tukang Batu OH 0.150 Rp 165,000.00 Rp 24,750.00
Mandor OH 0.015 Rp 250,000.00 Rp 3,750.00
Jumlah Rp 100,017.16

Memasang 1 M2 Plesteran 1 PC : 2 PP, tebal 15 mm


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
PC (1 zak = 40 kg) Zak 0.2556 Rp 61,100.00 Rp 15,617.16
Bahan
PP M3 0.0200 Rp 470,000.00 Rp 9,400.00
Pekerja OH 0.300 Rp 155,000.00 Rp 46,500.00
Tenaga Kerja
Tukang Batu OH 0.150 Rp 165,000.00 Rp 24,750.00
Tenaga Kerja
Kepala Tukang OH 0.015 Rp 180,000.00 Rp 2,700.00
Mandor OH 0.015 Rp 250,000.00 Rp 3,750.00
Jumlah Rp 102,717.16

Memasang 1 M2 Plesteran 1 PC : 4 PP, tebal 15 mm


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
PC (1 Zak = 40 Kg) Zak 0.156 Rp 61,100.00 Rp 9,531.60
Bahan
PP M3 0.024 Rp 470,000.00 Rp 11,280.00
Pekerja OH 0.300 Rp 155,000.00 Rp 46,500.00
Tukang Batu OH 0.150 Rp 165,000.00 Rp 24,750.00
Tenaga Kerja
Kepala Tukang OH 0.015 Rp 180,000.00 Rp 2,700.00
Mandor OH 0.015 Rp 250,000.00 Rp 3,750.00
Jumlah Rp 98,511.60
Memasang 1 M2 Acian dengan semen PC
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bahan PC (1 Zak = 40 Kg) Zak 0.081 Rp 61,100.00 Rp 4,964.38
Pekerja OH 0.200 Rp 155,000.00 Rp 31,000.00
Tukang Batu OH 0.100 Rp 165,000.00 Rp 16,500.00
Tenaga Kerja
Kepala Tukang Batu OH 0.100 Rp 180,000.00 Rp 18,000.00
Mandor OH 0.010 Rp 250,000.00 Rp 2,500.00
Jumlah Rp 72,964.38

Pekerjaan 1 M' Benangan


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
PC (1 Zak = 40 Kg) Zak 0.013 Rp 61,100.00 Rp 763.75
Bahan
Pasir Beton M3 0.0125 Rp 470,000.00 Rp 5,875.00
Pekerja OH 0.080 Rp 155,000.00 Rp 12,400.00
Tukang Batu OH 0.400 Rp 165,000.00 Rp 66,000.00
Tenaga Kerja
Kepala Tukang OH 0.040 Rp 180,000.00 Rp 7,200.00
Mandor OH 0.004 Rp 250,000.00 Rp 1,000.00
Jumlah Rp 93,238.75

Memasang 1 M2 Atap Pasang Atap UPVC tebal 10mm


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Pasang Atap UPVC tebal 10mm M2 1.00 Rp 325,000.00 Rp 325,000.00
Bahan
Skrup + Seal Atap Upvc motif genteng bh 8.00 Rp 3,000.00 Rp 24,000.00
Pekerja OH 0.200 Rp 155,000.00 Rp 31,000.00
Tukang Kayu OH 0.250 Rp 165,000.00 Rp 41,250.00
Tenaga Kerja
Kepala Tukang Kayu OH 0.007 Rp 180,000.00 Rp 1,260.00
Mandor OH 0.005 Rp 250,000.00 Rp 1,250.00
Jumlah Rp 423,760.00
Dibulatkan Rp 423,760.00

Memasang Kuda-kuda Galvalume termasuk rangka atap per m2


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bahan Kuda-kuda Galvalume termasuk rangka atap m2 1.050 Rp 235,000.00 Rp 246,750.00
Pekerja OH 0.0840 Rp 155,000.00 Rp 13,020.00
Tukang Kayu OH 0.1250 Rp 165,000.00 Rp 20,625.00
Tenaga Kerja
Kepala Tukang Kayu OH 0.013 Rp 180,000.00 Rp 2,340.00
Mandor OH 0.004 Rp 250,000.00 Rp 1,000.00
Jumlah Rp 283,735.00
Dibulatkan Rp 283,735.00

Memasang 1 M' Lisplank Woodplank 2x(0.8x30cm)


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Woodplank lebar 30 cm, tebal 8 mm m' 2.200 Rp 42,280.00 Rp 93,016.00
Galvalume Hollow 40 x 40 m' 3.300 Rp 9,000.00 Rp 29,700.00
Bahan
Galvalume Hollow 40 x 20 m' 1.000 Rp 8,000.00 Rp 8,000.00
Skrup/Ripet bh 14.000 Rp 630.00 Rp 8,820.00
Pekerja OH 0.100 Rp 155,000.00 Rp 15,500.00
Tukang Kayu OH 0.200 Rp 165,000.00 Rp 33,000.00
Tenaga Kerja
Kepala Tukang Kayu OH 0.025 Rp 180,000.00 Rp 4,500.00
Mandor OH 0.025 Rp 250,000.00 Rp 6,250.00
Jumlah Rp 198,786.00

Memasang 1 M' Lisplank Woodplank 1x(0.8x30cm)


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Woodplank lebar 30 cm, tebal 8 mm m' 1.100 Rp 42,280.00 Rp 46,508.00
Galvalume Hollow 40 x 40 m' 2.200 Rp 9,000.00 Rp 19,800.00
Bahan
Galvalume Hollow 40 x 20 m' 0.700 Rp 8,000.00 Rp 5,600.00
Skrup/Ripet bh 14.000 Rp 630.00 Rp 8,820.00
Pekerja OH 0.100 Rp 155,000.00 Rp 15,500.00
Tukang Kayu OH 0.200 Rp 165,000.00 Rp 33,000.00
Tenaga Kerja
Kepala Tukang Kayu OH 0.025 Rp 180,000.00 Rp 4,500.00
Mandor OH 0.025 Rp 250,000.00 Rp 6,250.00
Jumlah Rp 139,978.00

PEKERJAAN PENUTUP LANTAI & DINDING


Memasang 1 M2 Lantai Granit Tile Uk. (60 x 60) cm Polish
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Granit Tile Uk. (60 x 60) cm Polish m2 1.061 Rp 385,000.00 408,408.00
PC Kg 9.800 Rp 1,527.50 14,969.50
Bahan
PP M3 0.045 Rp 470,000.00 21,150.00
Semen Warna Kg 1.300 Rp 18,000.00 23,400.00
Pekerja OH 0.700 Rp 155,000.00 108,500.00
Tukang Keramik OH 0.350 Rp 165,000.00 57,750.00
Tenaga Kerja
Kepala Tukang Batu OH 0.035 Rp 180,000.00 6,300.00
Mandor OH 0.035 Rp 250,000.00 8,750.00
Jumlah 649,227.50
Memasang 1 M2 Lantai Granit Tile Uk. (60 x 60) cm UnPolish
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Granit Tile Uk. (60 x 60) cm UnPolish m2 1.061 Rp 415,000.00 440,232.00
PC Kg 9.800 Rp 1,527.50 14,969.50
Bahan
PP M3 0.045 Rp 470,000.00 21,150.00
Semen Warna Kg 1.300 Rp 18,000.00 23,400.00
Pekerja OH 0.700 Rp 155,000.00 108,500.00
Tukang Keramik OH 0.350 Rp 165,000.00 57,750.00
Tenaga Kerja
Kepala Tukang Batu OH 0.035 Rp 180,000.00 6,300.00
Mandor OH 0.035 Rp 250,000.00 8,750.00
Jumlah 681,051.50

Memasang 1 M2 Lantai Granit Tile Uk. 60X60 Cm UnPolished (Lantai kamar mandi) F3
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Granit Tile Uk. 60X60 Cm UnPolished (Lantai kamar mandi) F3 m2 1.050 Rp 415,000.00 435,750.00
PC Kg 10.000 Rp 1,527.50 15,275.00
Bahan
PP M3 0.045 Rp 470,000.00 21,150.00
Semen Warna Kg 0.500 Rp 18,000.00 9,000.00
Pekerja OH 0.700 Rp 155,000.00 108,500.00
Tenaga Kerja Tukang Keramik OH 0.350 Rp 165,000.00 57,750.00
Mandor OH 0.035 Rp 250,000.00 8,750.00
Jumlah 656,175.00

Memasang 1 M2 Granit Tile Uk. (60 x 60) cm Polish Dinding


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Granit Tile Uk. (60 x 60) cm Polish Dinding M2 1.050 Rp 385,000.00 Rp 404,250.00
PC (1 zak = 40 kg) Zak 0.233 Rp 61,100.00 Rp 14,205.75
Bahan
PP M3 0.018 Rp 470,000.00 Rp 8,460.00
Semen Warna Kg 1.940 Rp 18,000.00 Rp 34,920.00
Pekerja OH 0.700 Rp 155,000.00 Rp 108,500.00
Tukang Batu OH 0.350 Rp 165,000.00 Rp 57,750.00
Tenaga Kerja
Kepala Tukang OH 0.035 Rp 180,000.00 Rp 6,300.00
Mandor OH 0.035 Rp 250,000.00 Rp 8,750.00
Jumlah Rp 643,135.75

Memasang 1 M2 Granit Tile Uk. (60 x 60) cm Polish Dinding Kolom


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Granit Tile Uk. (60 x 60) cm Polish Dinding Kolom M2 1.150 Rp 385,000.00 Rp 442,750.00
PC (1 zak = 40 kg) Zak 0.233 Rp 61,100.00 Rp 14,205.75
Bahan
PP M3 0.018 Rp 470,000.00 Rp 8,460.00
Semen Warna Kg 1.940 Rp 18,000.00 Rp 34,920.00
Pekerja OH 0.700 Rp 155,000.00 Rp 108,500.00
Tukang Batu OH 0.350 Rp 165,000.00 Rp 57,750.00
Tenaga Kerja
Kepala Tukang OH 0.035 Rp 180,000.00 Rp 6,300.00
Mandor OH 0.035 Rp 250,000.00 Rp 8,750.00
Jumlah Rp 681,635.75

Memasang 1 M' Plint Granit Tile Uk. (10 x 60) cm


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Plint Granit Tile Uk. (10 x 60) cm m' 1.050 Rp 60,000.00 63,000.00
PC Kg 1.140 Rp 1,527.50 1,741.35
Bahan
PP M3 0.003 Rp 470,000.00 1,410.00
Semen Warna Kg 0.025 Rp 18,000.00 450.00
Pekerja OH 0.090 Rp 155,000.00 13,950.00
Tukang Batu OH 0.090 Rp 165,000.00 14,850.00
Tenaga Kerja
Kepala Tukang Batu OH 0.009 Rp 180,000.00 1,620.00
Mandor OH 0.005 250,000.00 1,250.00
Jumlah 98,271.35
Dibulatkan 98,271.00

Memasang 1 M2 Floor Hardener


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bahan Semen Floor hardener (25 kg) zak 0.2000 Rp 175,000.00 35,000.00
Alat Sewa mesin trowel Hari 0.0333 Rp 500,000.00 16,666.67
Pekerja OH 0.1200 Rp 155,000.00 18,600.00
Tukang OH 0.1200 Rp 165,000.00 19,800.00
Tenaga Kerja
Kepala Tukang Batu OH 0.0120 Rp 180,000.00 2,160.00
Mandor OH 0.0060 Rp 250,000.00 1,500.00
Jumlah 93,726.67
Dibulatkan 93,726.00

Memasang 1 M Kusen Alumunium Profil 4" Powder coating putih tebal 0.9 mm (INKALUM)
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Kusen Alumunium Profil 4" Powder coating putih tebal 0.9 mm
(INKALUM) M' 1.1000 Rp 195,000.00 Rp 214,500.00
Bahan
Sealent tube 0.0600 Rp 53,700.00 Rp 3,222.00
Skrup/Ripet Bh 2.0000 Rp 630.00 Rp 1,260.00
Pekerja Terampil OH 0.0430 Rp 155,000.00 Rp 6,665.00
Tukang Kayu OH 0.0430 Rp 165,000.00 Rp 7,095.00
Tenaga Kerja
Kepala Tukang Kayu OH 0.0043 Rp 180,000.00 Rp 774.00
Mandor OH 0.0021 Rp 250,000.00 Rp 525.00
Jumlah 234,041.00
Dibulatkan 234,041.00

Memasang 1 M Slimar Alumunium Profil 3/8 Powder coating putih tebal 0.9 mm (INKALUM)
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Slimar Alumunium Profil 3/8 Powder coating putih tebal 0.9 mm
(INKALUM) M' 1.1000 Rp 173,000.00 Rp 190,300.00
Bahan
Sealent tube 0.0600 Rp 53,700.00 Rp 3,222.00
Skrup/Ripet Bh 2.0000 Rp 630.00 Rp 1,260.00
Pekerja Terampil OH 0.0430 Rp 155,000.00 Rp 6,665.00
Tukang Kayu OH 0.0430 Rp 165,000.00 Rp 7,095.00
Tenaga Kerja
Kepala Tukang Kayu OH 0.0043 Rp 180,000.00 Rp 774.00
Mandor OH 0.0022 Rp 250,000.00 Rp 550.00
Jumlah 209,866.00
Dibulatkan 209,866.00

Memasang 1 Set Kunci 2x putar dan handle pintu STAINLESS STEEL


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bahan Kunci 2x putar dan handle pintu STAINLESS STEEL Bh 1.000 950,000.00 950,000.00
Pekerja OH 0.100 Rp 155,000.00 15,500.00
Tenaga Kerja
Kepala Tukang Kayu OH 0.100 Rp 180,000.00 18,000.00
Jumlah 983,500.00
Dibulatkan 983,500.00

Memasang 1 Set Kunci silender + tutup


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bahan Kunci silender + tutup Bh 1.000 450,000.00 450,000.00
Pekerja OH 0.100 Rp 155,000.00 15,500.00
Tenaga Kerja
Kepala Tukang Kayu OH 0.100 Rp 180,000.00 18,000.00
Jumlah 483,500.00
Dibulatkan 483,500.00

Memasang 1 Set Kunci tanam Atas dan Bawah


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bahan Kunci tanam Atas dan Bawah Bh 1.000 425,000.00 425,000.00
Pekerja OH 0.100 Rp 155,000.00 15,500.00
Tenaga Kerja
Kepala Tukang Kayu OH 0.100 Rp 180,000.00 18,000.00
Jumlah 458,500.00

Memasang 1 Set Kunci Knob pintu toilet


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bahan Kunci Knob pintu toilet Bh 1.000 125,000.00 125,000.00
Pekerja OH 0.200 Rp 155,000.00 31,000.00
Tenaga Kerja
Tukang Kayu OH 0.120 Rp 165,000.00 19,800.00
Tenaga Kerja
Kepala Tukang Kayu OH 0.060 Rp 180,000.00 10,800.00
Mandor OH 0.0100 Rp 250,000.00 2,500.00
Jumlah 189,100.00
Dibulatkan 189,100.00

Memasang 1 Set Handle pintu Stainless Steel L=60 cm


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bahan Handle pintu Stainless Steel L=60 cm Bh 1.000 884,000.00 884,000.00
Pekerja OH 0.200 Rp 155,000.00 31,000.00
Tukang Kayu OH 0.120 Rp 165,000.00 19,800.00
Tenaga Kerja
Kepala Tukang Kayu OH 0.060 Rp 180,000.00 10,800.00
Mandor OH 0.0100 Rp 250,000.00 2,500.00
Jumlah 948,100.00
Dibulatkan 948,100.00

Memasang 1 set Engsel pintu 4"


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bahan Engsel pintu 4" set 1.000 125,000.00 125,000.00
Pekerja OH 0.01500 Rp 155,000.00 2,325.00
Tukang Kayu OH 0.15000 Rp 165,000.00 24,750.00
Tenaga Kerja
Kepala Tukang Kayu OH 0.01500 Rp 180,000.00 2,700.00
Mandor OH 0.00075 Rp 250,000.00 187.50
Jumlah 154,962.50
Dibulatkan 154,962.00

Memasang 1 Bh Engsel Casement


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bahan Engsel casement hinge Bh 1.000 125,000.00 125,000.00
Pekerja OH 0.015 Rp 155,000.00 2,325.00
Tukang Kayu OH 0.150 Rp 165,000.00 24,750.00
Tenaga Kerja
Kepala Tukang Kayu OH 0.015 Rp 180,000.00 2,700.00
Mandor OH 0.0080 Rp 250,000.00 2,000.00
Jumlah 156,775.00
Dibulatkan 156,775.00
Memasang 1 M2 Kaca Bening Polos, Tebal 5 mm
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bahan Kaca Bening tbl. 5 mm M2 1.100 93,300.00 102,630.00
Pekerja OH 0.01500 Rp 155,000.00 2,325.00
Tukang Kayu OH 0.15000 Rp 165,000.00 24,750.00
Tenaga Kerja
Kepala Tukang Kayu OH 0.01500 Rp 180,000.00 2,700.00
Mandor OH 0.00075 Rp 250,000.00 187.50
Jumlah 132,592.50
Dibulatkan 132,592.00

Memasang 1 M2 Kaca Es, Tebal 5 mm


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bahan Kaca Es tbl. 5 mm M2 1.100 267,800.00 294,580.00
Pekerja OH 0.01500 Rp 155,000.00 2,325.00
Tukang Kayu OH 0.15000 Rp 165,000.00 24,750.00
Tenaga Kerja
Kepala Tukang Kayu OH 0.01500 Rp 180,000.00 2,700.00
Mandor OH 0.00075 Rp 250,000.00 187.50
Dibulatkan 324,542.50

Pekerjaan Pemasangan daun pintu tripleks + HPL 120x240 cm DUA SISI per m2
Kebutuhan Indeks Satuan Harga Bahan Jml. Harga
Mandor 0.3750 O.H Rp 250,000.00 Rp 93,750.00
Kepala ukang 0.7500 O.H Rp 180,000.00 Rp 135,000.00
Tenaga:
Tukang 2.0000 O.H Rp 165,000.00 Rp 330,000.00
Pekerja 1.0000 O.H Rp 155,000.00 Rp 155,000.00
HPL 120x240 cm 0.8333 lbr Rp 389,000.00 Rp 324,166.67
Lem Kuning Fox 0.1350 klg Rp 64,400.00 Rp 8,694.00
Lem Putih Rajawali 0.3500 bks Rp 23,000.00 Rp 8,050.00
Skrup/Ripet 26.0000 bh Rp 630.00 Rp 16,380.00
Nilai HSPK : Rp 1,071,040.67
Over Head & Keuntungan Rp -
Jumlah total Rp 1,071,040.67

Pembuatan dan pemasangan Daun Pintu tripleks per m2


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Kayu balok kamper 4/10 cm m3 0.0196 12,000,000.00 235,200.00
Bahan Lem Kuning Fox kg 0.300 64,400.00 19,320.00
Tripleks (1200x2400) Lbr 1.000 150,000.00 150,000.00
HPL 120x240 cm DUA SISI m2 1.000 1,071,040.67 1,071,040.67
Pekerja OH 0.35000 Rp 155,000.00 54,250.00
Tenaga Kerja Tukang Kayu OH 1.05000 Rp 165,000.00 173,250.00
Mandor OH 0.10500 Rp 250,000.00 26,250.00
Dibulatkan 1,729,310.67

Membuat & memasang P-1 termasuk sealen penutup celah per unit
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Kusen Alumunium Profil 4" Powder coating putih tebal 0.9 mm
(INKALUM) m' 6.920 234,041.00 1,619,563.72
Daun pintu Slimar kayu kamper + tripleks 4mm finish HPL m2 3.830 1,729,310.67 6,623,951.58
Pengadaan dan Pasang Engsel pintu 4" set 4.000 154,962.00 619,848.00
Kunci silinder set 1.000 483,500.00 483,500.00
Handle pintu stainless steel set 2.000 948,100.00 1,896,200.00
Kunci tanam atas bawah set 1.000 458,500.00 458,500.00
Jumlah Rp 11,701,563.30

Membuat & memasang P-2 termasuk sealen penutup celah per unit
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Kusen Alumunium Profil 4" Powder coating putih tebal 0.9 mm
(INKALUM) m' 7.360 234,041.00 1,722,541.76
Slimar Alumunium Profil 3/8 Powder coating putih tebal 0.9 mm
(INKALUM) m' 2.860 209,866.00 600,216.76
Pengadaan & pasang Kaca Bening tbl. 5 mm m2 0.300 132,592.00 39,777.60
Daun pintu SWP ex pabrikan Uk. 210x91 cm finish Semiduco
bh 1.000 7,575,000.00 7,575,000.00
Terpasang
Pengadaan dan Pasang Engsel pintu 4" set 1.500 154,962.00 232,443.00
Kunci 2x putar dan handle pintu STAINLESS STEEL set 1.000 983,500.00 983,500.00
Pengadaan dan Pasang Engsel casement jendela set 1.000 156,775.00 156,775.00
Pengadaan dan Pasang Grendel Rambucis bh 1.000 75,000.00 75,000.00
Jumlah Rp 11,385,254.12

Membuat & memasang P-3 termasuk sealen penutup celah per unit
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Kusen Alumunium Profil 4" Powder coating putih tebal 0.9 mm
(INKALUM) m' 6.960 234,041.00 1,628,925.36
Daun pintu Aluminium Double Spandrill Uk. 210x71 cm..... Terpasang BH 1.000 4,250,000.00 4,250,000.00
Pengadaan & pasang Kaca S (buram) tbl. 5 mm m2 0.250 324,542.50 81,135.63
Pengadaan dan Pasang Engsel pintu 4" set 1.500 154,962.00 232,443.00
Kunci Knob pintu toilet set 1.000 189,100.00 189,100.00
Jumlah Rp 6,381,603.99
Membuat & memasang J-1 termasuk sealen penutup celah per unit
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Kusen Alumunium Profil 4" Powder coating putih tebal 0.9 mm
(INKALUM) m' 7.720 234,041.00 1,806,796.52
Slimar Alumunium Profil 3/8 Powder coating putih tebal 0.9 mm
(INKALUM) m' 6.640 209,866.00 1,393,510.24
Pengadaan & pasang Kaca Bening tbl. 5 mm m2 1.170 132,592.00 155,132.64
Pengadaan dan Pasang Engsel casement jendela set 2.000 156,775.00 313,550.00
Pengadaan dan Pasang Grendel Rambucis bh 2.000 75,000.00 150,000.00
Jumlah Rp 3,818,989.40

Membuat & memasang BV termasuk sealen penutup celah per unit


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Kusen Alumunium Profil 4" Powder coating putih tebal 0.9 mm
(INKALUM) m' 2.720 234,041.00 636,591.52
Slimar Alumunium Profil 3/8 Powder coating putih tebal 0.9 mm m' 2.480 209,866.00 520,467.68
(INKALUM)
Pengadaan & pasang Kaca S (buram) tbl. 5 mm m2 0.200 324,542.50 64,908.50
Pengadaan dan Pasang Engsel casement jendela set 1.000 156,775.00 156,775.00
Pengadaan dan Pasang Grendel Rambucis bh 1.000 75,000.00 75,000.00
Jumlah Rp 1,453,742.70

Membuat & memasang BV-1 termasuk sealen penutup celah per unit
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Kusen Alumunium Profil 4" Powder coating putih tebal 0.9 mm
(INKALUM) m' 4.630 234,041.00 1,083,609.83
Slimar Alumunium Profil 3/8 Powder coating putih tebal 0.9 mm m' 4.760 209,866.00 998,962.16
(INKALUM)
Pengadaan & pasang Kaca Clear tbl. 5 mm m2 0.440 132,592.00 58,340.48
Pengadaan dan Pasang Engsel casement jendela set 2.000 156,775.00 313,550.00
Pengadaan dan Pasang Grendel Rambucis bh 2.000 75,000.00 150,000.00
Jumlah Rp 2,604,462.47

Membuat & memasang SC-1 termasuk sealen penutup celah per unit
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Kusen Alumunium Profil 4" Powder coating putih tebal 1 mm m' 6.180 234,041.00 1,446,373.38
Louvre Aluminium tebal 1 mm (termasuk skrup, aksessoris)........
m' 10.600 28,000.00 296,800.00
Terpasang
Dyna Bolt Ф10mm.... Terpasang bh 2.000 16,200.00 32,400.00
Jumlah Rp 1,775,573.38

Membuat & memasang SC-2 termasuk sealen penutup celah per unit
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Kusen Alumunium Profil 4" Powder coating putih tebal 1 mm m' 6.820 234,041.00 1,596,159.62
Louvre Aluminium tebal 1 mm (termasuk skrup, aksessoris)........
m' 12.450 28,000.00 348,600.00
Terpasang
Dyna Bolt Ф10mm.... Terpasang bh 2.000 16,200.00 32,400.00
Jumlah Rp 1,977,159.62

Membuat & memasang SC-3 termasuk sealen penutup celah per unit
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Kusen Alumunium Profil 4" Powder coating putih tebal 1 mm m' 7.000 234,041.00 1,638,287.00
Louvre Aluminium tebal 1 mm (termasuk skrup, aksessoris)........
m' 12.900 28,000.00 361,200.00
Terpasang
Dyna Bolt Ф10mm.... Terpasang bh 2.000 16,200.00 32,400.00
Jumlah Rp 2,031,887.00

Membuat & memasang SC-4 termasuk sealen penutup celah per unit
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Kusen Alumunium Profil 4" Powder coating putih tebal 1 mm m' 8.280 234,041.00 1,937,859.48
Louvre Aluminium tebal 1 mm (termasuk skrup, aksessoris)........
m' 16.050 28,000.00 449,400.00
Terpasang
Dyna Bolt Ф10mm.... Terpasang bh 2.000 16,200.00 32,400.00
Jumlah Rp 2,419,659.48

Pekerjaan 1 m2 dinding partisi GRC Board dua sisi


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Mandor O.H 0.0450 250,000.00 11,250.00
Kepala Tukang O.H 0.0750 180,000.00 13,500.00
Upah:
Tukang O.H 0.4500 165,000.00 74,250.00
Pekerja O.H 0.1500 155,000.00 23,250.00
GRC Board (1200x2400) 8mm Lbr 0.7292 218,000.00 158,958.33
Metal stud 76 t=0.4mm m' 5.4877 20,000.00 109,754.39
Skrup/Ripet bh 28.0000 630.00 17,640.00
Cat interior m2 2.0000 81,670.00 163,340.00
RTISI GRC Jumlah Rp 571,942.72
Memasang 1 M2 Rangka galvalume Hollow + Plafond PVC Warna putih 8mm x 20cm
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Galvalume Hollow 40 x 40 M' 2.500 Rp 9,000.00 Rp 22,500.00
Galvalume Hollow 40 x 20 M' 2.000 Rp 8,000.00 Rp 16,000.00
Plafond PVC Warna putih 8mm x 20cm m' 5.250 Rp 52,000.00 Rp 273,000.00
Bahan
penggantung plafond Besi dia. 8mm kg 0.592 Rp 28,492.50 Rp 16,864.03
penggantung plafond metal furing hollow 40x20 m' 2.000 Rp 8,000.00 Rp 16,000.00
Skrup/Ripet bh 16.000 Rp 630.00 Rp 10,080.00
Pekerja OH 0.250 Rp 155,000.00 Rp 38,750.00
Tukang Kayu OH 0.150 Rp 165,000.00 Rp 24,750.00
Tenaga Kerja
Kepala Tukang Kayu OH 0.025 Rp 180,000.00 Rp 4,500.00
Mandor OH 0.075 Rp 250,000.00 Rp 18,750.00
Jumlah Rp 441,194.03

Memasang 1 M' Lis plafond PVC (dinding )


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bahan Lis plafond PVC (dinding ) M' 1.050 60,000.00 63,000.00
Pekerja OH 0.080 Rp 155,000.00 12,400.00
Tukang Kayu OH 0.060 Rp 165,000.00 9,900.00
Tenaga Kerja
Kepala Tukang Kayu OH 0.010 Rp 180,000.00 1,800.00
Mandor OH 0.008 Rp 250,000.00 2,000.00
Jumlah 89,100.00

Memasang 1 M' Lis plafond PVC (Siku/drof ceilling bawah)


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bahan Lis plafond PVC (Siku/drof ceilling bawah) M' 1.050 23,500.00 24,675.00
Pekerja OH 0.080 Rp 155,000.00 12,400.00
Tukang Kayu OH 0.060 Rp 165,000.00 9,900.00
Tenaga Kerja
Kepala Tukang Kayu OH 0.010 Rp 180,000.00 1,800.00
Mandor OH 0.008 Rp 250,000.00 2,000.00
Jumlah 50,775.00

Memasang 1 M' Lis plafond PVC (U)


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bahan Lis plafond PVC (U) M' 1.050 17,500.00 18,375.00
Pekerja OH 0.080 Rp 155,000.00 12,400.00
Tukang Kayu OH 0.060 Rp 165,000.00 9,900.00
Tenaga Kerja
Kepala Tukang Kayu OH 0.010 Rp 180,000.00 1,800.00
Mandor OH 0.008 Rp 250,000.00 2,000.00
Jumlah 44,475.00

Pekerjaan Pemasangan Lis Stainless L=3cm per m2


Kebutuhan Indeks Satuan Harga Bahan Jml. Harga
Mandor 0.0938 O.H Rp 250,000.00 Rp 23,437.50
Kepala ukang 0.1875 O.H Rp 180,000.00 Rp 33,750.00
Tenaga:
Tukang 0.5000 O.H Rp 165,000.00 Rp 82,500.00
Pekerja 0.2500 O.H Rp 155,000.00 Rp 38,750.00
Lis Stainless L=3cm 1.0000 m2 Rp 1,733,333.33 Rp 1,733,333.33
Lem plat strip Stainless Steel 0.0350 kg Rp 250,000.00 Rp 8,750.00
Jumlah: Rp 1,920,520.83
Nilai HSPK : 1,920,520.00

Pekerjaan Pemasangan Multiplek (1200x2400) 12 mm + HPL MELAMIN MOTIF 120x240 cm SATU SISI per m2
Kebutuhan Indeks Satuan Harga Bahan Jml. Harga
Mandor 0.3750 O.H Rp 250,000.00 Rp 93,750.00
Kepala tukang 0.7500 O.H Rp 180,000.00 Rp 135,000.00
Tenaga:
Tukang 2.0000 O.H Rp 165,000.00 Rp 330,000.00
Pekerja 1.0000 O.H Rp 155,000.00 Rp 155,000.00
Multiplek (1200x2400) 12 mm 0.3819 lbr Rp 285,000.00 Rp 108,854.17
HPL MELAMIN MOTIF 120x240 cm 0.7639 lbr Rp 389,000.00 Rp 297,152.78
Bahan: Lem Kuning Fox 0.1350 klg Rp 64,400.00 Rp 8,694.00
Lem Putih Rajawali 0.3500 bks Rp 23,000.00 Rp 8,050.00
Bahan:

Skrup/Ripet 26.0000 bh Rp 630.00 Rp 16,380.00


Jumlah: Rp 1,152,880.94
Nilai HSPK : 1,152,880.00

Pekerjaan Pemasangan Multiplek (1200x2400) 12 mm + HPL MELAMIN WARNA POLOS 120x240 cm DUA SISI per m2
Kebutuhan Indeks Satuan Harga Bahan Jml. Harga
Mandor 0.3750 O.H Rp 250,000.00 Rp 93,750.00
Kepala tukang 0.7500 O.H Rp 180,000.00 Rp 135,000.00
Tenaga:
Tukang 2.0000 O.H Rp 165,000.00 Rp 330,000.00
Pekerja 1.0000 O.H Rp 155,000.00 Rp 155,000.00
Multiplek (1200x2400) 12 mm 0.3819 lbr Rp 285,000.00 Rp 108,854.17
HPL MELAMIN WARNA POLOS 120x240 cm 0.7639 lbr Rp 389,000.00 Rp 297,152.78
Bahan: Lem Kuning Fox 0.1350 klg Rp 64,400.00 Rp 8,694.00
Lem Putih Rajawali 0.3500 bks Rp 23,000.00 Rp 8,050.00
Skrup/Ripet 26.0000 bh Rp 630.00 Rp 16,380.00
Jumlah: Rp 1,152,880.94
Nilai HSPK : 1,152,880.00
Pekerjaan Pemasangan BackDrop Loket per unit
Kebutuhan Indeks Satuan Harga Bahan Jml. Harga
Besi hollow 50x50x1.8 478.16 kg Rp 42,932.00 Rp 20,528,330.77
Lis Stainless L=3cm 0.44 m2 Rp 1,920,520.83 Rp 846,949.69
Multiplek 12 mm + HPL Melamin motif DUA SISI 4.00 m2 Rp 1,152,880.94 Rp 4,611,523.78
Multiplek 12 mm + HPL Melamin warna Polos DUA SISI 18.88 m2 Rp 1,152,880.94 Rp 21,766,392.23
Nilai HSPK : Rp 47,753,196.47

Mengecat 1 M2 Tembok Baru (1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) Indoor
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Plamir Kg 0.1000 Rp 27,000.00 Rp 2,700.00
Bahan Kertas gosok halus lbr 0.1000 Rp 15,000.00 Rp 1,500.00
Cat tembok interior jotun Kaleng 0.1040 Rp 600,000.00 Rp 62,400.00
Pekerja OH 0.0200 Rp 155,000.00 Rp 3,100.00
Tenaga Kerja Tukang Cat OH 0.0630 Rp 165,000.00 Rp 10,395.00
Mandor OH 0.0063 Rp 250,000.00 Rp 1,575.00
Jumlah Rp 81,670.00

Mengecat 1 M2 Tembok Baru (3 Lapis Cat Dasar alkali, 2 Lapis Cat Penutup) exterior
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Cat Dasar alkali 2x Kg 0.1000 Rp 45,000.00 Rp 4,500.00
Kertas gosok halus lbr 0.1000 Rp 15,000.00 Rp 1,500.00
Cat tembok eksterior jotun Kaleng 0.1040 Rp 750,000.00 Rp 78,000.00
Pekerja OH 0.0200 Rp 155,000.00 Rp 3,100.00
Tenaga Kerja Tukang Cat OH 0.0630 Rp 165,000.00 Rp 10,395.00
Mandor OH 0.0063 Rp 250,000.00 Rp 1,575.00
Jumlah Rp 99,070.00

PEKERJAAN PIPA & SANITASI

Memasang 1 set Closet Duduk (TOTO)


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Closet Duduk (TOTO) Bh 1.000 5,460,000.00 5,460,000.00
Bahan Semen 1 sak = 40 kg sak 0.150 61,100.00 9,165.00
Pasir Pasang m3 0.010 470,000.00 4,700.00
Pekerja OH 1.000 Rp 155,000.00 155,000.00
Tukang Batu OH 1.500 Rp 165,000.00 247,500.00
Tenaga Kerja
Kepala Tukang OH 0.150 Rp 180,000.00 27,000.00
Mandor OH 0.160 Rp 250,000.00 40,000.00
Jumlah 5,943,365.00
Dibulatkan 5,943,365.00

Memasang 1 Bh Jetspray
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bahan Jetspray Bh 1.000 750,000.00 Rp 750,000.00
Pekerja OH 0.010 Rp 155,000.00 Rp 1,550.00
Tukang Batu OH 0.100 Rp 165,000.00 Rp 16,500.00
Tenaga Kerja
Kepala Tukang OH 0.010 Rp 180,000.00 Rp 1,800.00
Mandor OH 0.0050 Rp 250,000.00 Rp 1,250.00
Jumlah Rp 771,100.00

Memasang 1 Bh Sink bak dalam 40cm, termasuk Kran Air sikutan & Kelengkapannya
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bahan Sink bak dalam 40cm, termasuk Kran Air sikutan & Kelengkapannya bh 1.000 900,000.00 900,000.00
Pekerja OH 0.250 Rp 155,000.00 38,750.00
Tenaga Kerja Tukang OH 0.500 Rp 165,000.00 82,500.00
Kepala Tukang OH 0.060 Rp 180,000.00 10,800.00
Jumlah 1,032,050.00
Dibulatkan 1,032,050.00

Memasang 1 Bh Kran dinding


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Kran dinding 1/2" Bh 1.000 190,000.00 190,000.00
Bahan
seal tape Bh 0.250 3,500.00 875.00
Tukang Pipa OH 0.100 Rp 165,000.00 16,500.00
tenaga
Kepala Tukang Pipa OH 0.010 Rp 180,000.00 1,800.00
Jumlah 209,175.00
Dibulatkan 209,175.00

Memasang 1 Bh Floor drain Stainless Steel ɸ 3"


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bahan Floor drain Stainless Steel ɸ 3" Bh 1.000 245,000.00 245,000.00
Tukang Pipa OH 0.100 Rp 165,000.00 16,500.00
Kepala Tukang Pipa OH 0.010 Rp 180,000.00 1,800.00
Jumlah 263,300.00
Dibulatkan 263,300.00
Memasang 1 Bh Roof drain cast iron ɸ 3"
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bahan Roof drain cast iron ɸ 3" Bh 1.000 245,000.00 245,000.00
Tukang Pipa OH 0.100 Rp 165,000.00 16,500.00
Kepala Tukang Pipa OH 0.010 Rp 180,000.00 1,800.00
Jumlah 263,300.00
Dibulatkan 263,300.00

Memasang 1 Bh Roof drain cast iron ɸ 3"


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Bahan Roof drain cast iron ɸ 3" Bh 1.000 245,000.00 245,000.00
Tukang Pipa OH 0.100 Rp 165,000.00 16,500.00
Kepala Tukang Pipa OH 0.010 Rp 180,000.00 1,800.00
Jumlah 263,300.00
Dibulatkan 263,300.00

Memasang 1 M' Pipa PVC AW, Dia. 1/2"


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Pipa PVC AW, Dia. 1/2" M' 1.200 30,000.00 36,000.00
Bahan
Perlengkapan 0.350 30,000.00 10,500.00
Pekerja OH 0.0360 Rp 155,000.00 5,580.00
Tukang Pipa OH 0.0600 Rp 165,000.00 9,900.00
Tenaga Kerja
Kepala Tukang Pipa OH 0.0060 Rp 180,000.00 1,080.00
Mandor OH 0.0018 Rp 250,000.00 450.00
Jumlah 63,510.00
Dibulatkan 63,510.00

Memasang 1 M' Pipa PVC AW, Dia. 3/4"


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Pipa PVC AW, Dia. 3/4" M' 1.200 43,900.00 52,680.00
Bahan
Perlengkapan 0.350 43,900.00 15,365.00
Pekerja OH 0.0360 Rp 155,000.00 5,580.00
Tukang Pipa OH 0.0600 Rp 165,000.00 9,900.00
Tenaga Kerja
Kepala Tukang Pipa OH 0.0060 Rp 180,000.00 1,080.00
Mandor OH 0.0018 Rp 250,000.00 450.00
Jumlah 85,055.00
Dibulatkan 85,055.00

Memasang 1 M' Pipa PVC AW, Dia. 1"


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Pipa PVC AW, Dia. 1" M' 1.200 48,400.00 58,080.00
Bahan
Perlengkapan 0.350 48,400.00 16,940.00
Pekerja OH 0.0360 Rp 155,000.00 5,580.00
Tukang Pipa OH 0.0600 Rp 165,000.00 9,900.00
Tenaga Kerja
Kepala Tukang Pipa OH 0.0060 Rp 180,000.00 1,080.00
Mandor OH 0.0018 Rp 250,000.00 450.00
Jumlah 92,030.00
Dibulatkan 92,030.00

Memasang 1 M' Pipa PVC AW diameter 3" AW


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Pipa PVC AW diameter 3" AW M' 1.200 139,300.00 167,160.00
Bahan
Perlengkapan 0.350 139,300.00 48,755.00
Pekerja OH 0.0810 Rp 155,000.00 12,555.00
Tukang Pipa OH 0.1350 Rp 165,000.00 22,275.00
Tenaga Kerja
Kepala Tukang Pipa OH 0.0135 Rp 180,000.00 2,430.00
Mandor OH 0.0041 Rp 250,000.00 1,025.00
Jumlah 254,200.00
Dibulatkan 254,200.00

Memasang 1 M' Pipa PVC AW diameter 4" AW


Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
Pipa PVC AW diameter 4" AW M' 1.200 321,000.00 385,200.00
Bahan
Perlengkapan termasuk klem pipa 0.350 321,000.00 112,350.00
Pekerja OH 0.0810 Rp 155,000.00 12,555.00
Tukang Pipa OH 0.1350 Rp 165,000.00 22,275.00
Tenaga Kerja
Kepala Tukang Pipa OH 0.0135 Rp 180,000.00 2,430.00
Mandor OH 0.0041 Rp 250,000.00 1,025.00
Jumlah 535,835.00
Dibulatkan 535,835.00

Pemasangan Panel Box Indoor Uk. 40x60x20 cm + 1 MCCB , 35A 3 PHASE + 17 MCB , 10A 3 PHASE + 13 MCB , 6A 1 PHASE Lt.1
Kebutuhan Sat Indeks Harga Bahan Jml Harga
Panel Box Indoor Uk. 40x60x20 cm Unit 1.000 800,000.00 800,000.00
MCCB , 35A 3 PHASE Buah 1.000 625,000.00 625,000.00
Bahan MCB , 10A 3 PHASE Buah 17.000 404,500.00 6,876,500.00
MCB , 6A 1 PHASE Buah 13.000 195,000.00 2,535,000.00
Kabel NYM 3X4 mm m' 5.000 60,000.00 300,000.00
Pembantu Tukang Listrik Oh 0.750 Rp 155,000.00 116,250.00
Tenaga Kerja Tukang Listrik Oh 2.000 Rp 165,000.00 330,000.00
Kepala Tukang Listrik Oh 0.300 Rp 180,000.00 54,000.00
Jumlah 11,636,750.00
Dibulatkan 11,636,700.00

1 Ttk Instalasi Lampu


Kebutuhan Sat Indeks Harga Bahan Jml Harga
Kabel NYM 2X2,5 mm M' 10.00 30,000.00 300,000.00
pipa pralon 20mm Ljr 1.000 14,300.00 14,300.00
Bahan Klem pipa pralon 20mm Bh 3.000 1,000.00 3,000.00
T dos Bh 1.000 15,000.00 15,000.00
Fitting lampu Bh 1.000 25,000.00 25,000.00
Pembantu Tukang Listrik Oh 0.003 Rp 155,000.00 465.00
Tenaga Kerja
Tukang Listrik Oh 0.200 Rp 165,000.00 33,000.00
Jumlah 390,765.00
Dibulatkan 390,700.00

1 Ttk Instalasi Stop kontak + Stop Kontak Dinding 1PH


Kebutuhan Sat Indeks Harga Bahan Jml Harga
Kabel NYM 3X2,5 mm M' 10.00 35,000.00 350,000.00
pipa pralon 20mm Ljr 1.000 14,300.00 14,300.00
Bahan
Stop Kontak Dinding 1PH bh 1.000 45,000.00 45,000.00
T dos Bh 1.000 15,000.00 15,000.00
Pembantu Tukang Listrik Oh 0.001 Rp 155,000.00 155.00
Tenaga Kerja
Tukang Listrik Oh 0.150 Rp 165,000.00 24,750.00
Jumlah 449,205.00
Dibulatkan 449,200.00

1 Ttk Instalasi Stop kontak + Stop Kontak Dinding AC


Kebutuhan Sat Indeks Harga Bahan Jml Harga
Kabel NYM 3X2.5 mm M' 10.00 35,000.00 350,000.00
pipa pralon 20mm Ljr 1.000 14,300.00 14,300.00
Bahan
Stop Kontak Dinding AC bh 1.000 85,000.00 85,000.00
T dos Bh 1.000 15,000.00 15,000.00
Pembantu Tukang Listrik Oh 0.001 Rp 155,000.00 155.00
Tenaga Kerja
Tukang Listrik Oh 0.150 Rp 165,000.00 24,750.00
Jumlah 489,205.00
Dibulatkan 489,200.00

1 Bh Pek. Pasang Lampu LED Downlight 24 W


Kebutuhan Sat Indeks Harga Bahan Jml Harga
Bahan Lampu LED Downlight 24 W Bh 1.000 390,000.00 390,000.00
Pembantu Tukang Listrik Oh 0.001 Rp 155,000.00 155.00
Tenaga Kerja
Tukang Listrik Oh 0.150 Rp 165,000.00 24,750.00
Jumlah 414,905.00
Dibulatkan 414,900.00

1 Bh Pek. Pasang Lampu LED Downlight 16 W


Kebutuhan Sat Indeks Harga Bahan Jml Harga
Bahan Lampu LED Downlight 16 W Bh 1.000 250,000.00 250,000.00
Pembantu Tukang Listrik Oh 0.001 Rp 155,000.00 155.00
Tenaga Kerja
Tukang Listrik Oh 0.150 Rp 165,000.00 24,750.00
Jumlah 274,905.00
Dibulatkan 274,900.00

1 Bh Pek. Pasang Lampu LED Downlight 9 W


Kebutuhan Sat Indeks Harga Bahan Jml Harga
Bahan Lampu LED Downlight 9 W Bh 1.000 114,500.00 114,500.00
Pembantu Tukang Listrik Oh 0.001 Rp 155,000.00 155.00
Tenaga Kerja
Tukang Listrik Oh 0.150 Rp 165,000.00 24,750.00
Jumlah 139,405.00
Dibulatkan 139,400.00

1 Bh Pek. Pasang Lampu LED Downlight 5 W


Kebutuhan Sat Indeks Harga Bahan Jml Harga
Bahan Lampu LED Downlight 5 W Bh 1.000 85,000.00 85,000.00
Pembantu Tukang Listrik Oh 0.001 Rp 155,000.00 155.00
Tenaga Kerja
Tukang Listrik Oh 0.150 Rp 165,000.00 24,750.00
Jumlah 109,905.00
Dibulatkan 109,900.00

1 Bh Pek. Pasang Saklar Ganda


Kebutuhan Sat Indeks Harga Bahan Jml Harga
Bahan Saklar Ganda Bh 1.000 28,000.00 28,000.00
Pembantu Tukang Listrik Oh 0.001 Rp 155,000.00 155.00
Tenaga Kerja
Tukang Listrik Oh 0.150 Rp 165,000.00 24,750.00
Jumlah 52,905.00
Dibulatkan 52,900.00

1 Bh Pek. Pasang Saklar Tunggal


Kebutuhan Sat Indeks Harga Bahan Jml Harga
Bahan Saklar Tunggal Bh 1.000 23,000.00 23,000.00
Pembantu Tukang Listrik Oh 0.001 Rp 155,000.00 155.00
Tenaga Kerja
Tukang Listrik Oh 0.150 Rp 165,000.00 24,750.00
Jumlah 47,905.00
Dibulatkan 47,900.00

Pemasangan AC Splitz Kapasitas 1 PK Anti bacteri (termasuk instalasi pipa tembaga & fleksibel , kabel 3x2.5mm , lengkap & terpasang)……. Perunit
Kebutuhan Satuan Indeks Harga Bahan Jml. Harga
AC Splitz Kapasitas 1 PK Anti bacteri (Indoor & Out Door + Bracket) unit 1.0000 6,750,000.00 Rp 6,750,000.00
Bracket + jasa set 1.0000 125,000.00 Rp 125,000.00
Alat Instalasi AC pipa Tembaga 1/4" & 3/8" + jasa m' 9.0000 140,000.00 Rp 1,260,000.00
Pipa drain AC + jasa m' 9.0000 20,000.00 Rp 180,000.00
Kabel 3x2.5mm + jasa m' 9.0000 31,000.00 Rp 279,000.00
Jumlah Rp 8,594,000.00

1 Bh Pek. Pasang Ceilling Exhaust fan


Kebutuhan Sat Indeks Harga Bahan Jml Harga
Bahan Ceilling Exhaust fan Bh 1.000 600,000.00 600,000.00
Pembantu Tukang Listrik Oh 0.040 Rp 155,000.00 6,200.00
Tenaga Kerja
Tukang Listrik Oh 0.400 Rp 165,000.00 66,000.00
Jumlah 672,200.00
DAFTAR HARGA BAHAN
DAN UPAH PEKERJA

A. HARGA BAHAN
No. Jenis Bahan Sat. Harga ( Rp )

. Bongkar Atap Selasar dan atap belakang, Plafond, Kusen Pintu & Jendela serta dinding bata LS 47,500,000.00
(termasuk pembuangan pembongkaran ke luar lokasi)
2 Air (Biaya air tawar) ltr 100.00
3 Pembersihan Akhir lokasi pekerjaan (termasuk bekas bongkaran, sisa sisa material proyek Ls 37,500,000.00
keluar lokasi)
4 Pasir Urug M3 185,000.00
5 Pasir Pasang tipe A M3 470,000.00
6 Sirtu M3 250,000.00
6 Pasir Cor tipe A M3 550,000.00
7 Batu pecah mesin 1/2 M3 362,500.00
8 Bata merah (kelas 1) bh 1,750.00
9 Semen PC (Portland Cement) 40 kg zak 61,100.00
10 Semen berwarna yiyitan KG 18,000.00
11 Semen Floor hardener (25 kg) ZAK 175,000.00
12 Besi Wiremesh M-8 kg 24,500.00
13 Besi beton polos/ulir kg 24,500.00
14 Kawat Bendrat kg 23,500.00
15 Besi Profil WF kg 45,000.00
16 Baja Plat kg 45,000.00
17 Besi Profil CNP kg 87,000.00
18 Besi profil siku 70x70x7 kg 42,800.00
19 Besi Hollow kg 19,000.00
20 Lis Stainless L=3cm m' 52,000.00
21 Lem plat strip Stainless Steel kg 250,000.00
19 Usuk Galvalume C75 tebal 0.75mm ljr 215,000.00
20 Reng U30 t-0.45mm kg 78,000.00
21 Elektroda baja kg 49,325.00
22 Mur & Baut HTB Dia 12 mm bh 12,500.00
23 Jarum keras dia. 12 mm ……….Terpasang bh 170,000.00
24 Jarum keras dia. 16 mm ……….Terpasang bh 180,000.00
25 Angker dia. 19 mm - 40 cm ……….Terpasang bh 210,000.00
26 Genteng karangpilang m2 216,000.00
27 Bubungan Genteng Karangpilang m' 141,000.00
28 Pasang Atap UPVC tebal 10mm m2 325,000.00
29 Skrup + Seal Atap Upvc motif genteng bh 3,000.00
30 Kuda-kuda Galvalume termasuk rangka atap m2 235,000.00
31 Woodplank lebar 30 cm, tebal 8 mm m' 42,280.00
32 Flashsing Aluminium m' 185,000.00
33 Galvalume Hollow 40 x 40 m' 9,000.00
34 Galvalume Hollow 40 x 20 m' 8,000.00
35 Metal stud 76 t=0.4mm m' 20,000.00
36 GRC Board (1200x2400) 8mm LBR 218,000.00
37 Plafond PVC Warna putih 8mm x 20cm m' 52,000.00
38 Lis plafond PVC (dinding ) m' 60,000.00
39 Lis plafond PVC (Siku/drof ceilling bawah) m' 23,500.00
40 Lis plafond PVC (U) m' 17,500.00
41 Minyak pelumas begisting ltr 6,600.00
42 Cat tembok eksterior jotun kaleng 750,000.00
43 Cat tembok interior jotun kaleng 600,000.00
44 Cat Dasar alkali kg 45,000.00
45 Cat Besi kg 64,400.00
46 Cat Zincromate kg 48,400.00
45 Plamir tembok KG 27,000.00
46 Kertas gosok halus buah 15,000.00
No. Jenis Bahan Sat. Harga ( Rp )
47 Kaca Bening tbl. 5 mm m2 93,300.00
48 Kaca Es tbl. 5 mm m2 267,800.00
49 Kayu balok kamper 4/10 cm m3 12,000,000.00
50 Kayu meranti Balok M3 7,000,000.00
51 Kayu meranti Bekesting m3 4,500,000.00
52 Tripleks (1200x2400) LBR 150,000.00
53 Multiplek film (1200x2400) 12 mm LBR 285,000.00
54 Multiplek (1200x2400) 12 mm LBR 285,000.00
54 Lem Kuning Fox kg 64,400.00
55 Lem Putih Rajawali bks 23,000.00
56 Lem kayu kg 64,400.00
57 HPL 120x240 cm lbr 389,000.00
58 HPL MELAMIN MOTIF 120x240 cm lbr 389,000.00
59 HPL MELAMIN WARNA POLOS 120x240 cm lbr 389,000.00
58 Daun pintu SWP ex pabrikan Uk. 210x92 cm finish Semiduco Terpasang bh 7,575,000.00
59 Daun pintu SWP ex pabrikan Uk. 210x91 cm finish Semiduco Terpasang bh 7,575,000.00
60 Daun pintu Aluminium Double Spandrill Uk. 210x71 cm..... Terpasang bh 4,250,000.00
61 Granit Tile Uk. (60 x 60) cm Polish Dinding m2 385,000.00
62 Granit Tile Uk. (60 x 60) cm Polish m2 385,000.00
63 Granit Tile Uk. (60 x 60) cm UnPolish m2 415,000.00
64 Granit Tile Uk. 60X60 Cm UnPolished (Lantai kamar mandi) F3 m2 415,000.00
65 Plint Granit Tile Uk. (10 x 60) cm m' 60,000.00
66 Paku usuk KG 42,900.00
67 Skrup/Ripet bh 630.00
68 Baut skrup baja ringan bh 275.00
69 Kunci 2x putar dan handle pintu STAINLESS STEEL Bh 950,000.00
70 Kunci silender + tutup bh 450,000.00
71 Kunci tanam Atas dan Bawah set 425,000.00
72 Kunci Knob pintu toilet Bh 125,000.00
73 Handle pintu Stainless Steel L=60 cm stel 884,000.00
74 Engsel pintu 4" stel 125,000.00
75 Engsel casement stel 125,000.00
76 Pengadaan dan Pasang Grendel Rambucis bh 75,000.00
77 Aquaproofing kg 175,000.00
78 Pipa PVC AW, Dia. 1/2" m' 30,000.00
79 Pipa PVC AW, Dia. 3/4" m' 43,900.00
80 Pipa PVC AW, Dia. 1" m' 48,400.00
81 Pipa PVC AW diameter 3" AW m' 139,300.00
82 Pipa PVC AW diameter 4" AW m' 321,000.00
83 Seal tape bh 3,500.00
84 Closet Duduk (TOTO) unit 5,460,000.00
85 Jetspray bh 750,000.00
86 Sink bak dalam 40cm, termasuk Kran Air sikutan & Kelengkapannya bh 900,000.00
87 Kran dinding 1/2" bh 190,000.00
88 Floor drain Stainless Steel ɸ 3" bh 245,000.00
89 Roof drain cast iron ɸ 3" bh 245,000.00
90 T dos PVC bh 15,000.00
91 Fitting lampu bh 25,000.00
92 Kusen Alumunium Profil 4" Powder coating putih tebal 0.9 mm (INKALUM) m' 195,000.00
93 Slimar Alumunium Profil 3/8 Powder coating putih tebal 0.9 mm (INKALUM) m' 173,000.00
94 Louvre Aluminium tebal 1 mm (termasuk skrup, aksessoris)........ Terpasang m' 28,000.00
94 Dyna Bolt Ф10mm.... Terpasang bh 16,200.00
95 Sealent tube 53,700.00
96 Kabel NYM 3X4 mm m' 60,000.00
97 Kabel NYM 2X2,5 mm m' 30,000.00
97 Kabel NYM 3X2,5 mm m' 35,000.00
98 pipa pralon 20mm Ljr 14,300.00
99 Klem pipa pralon 20mm Bh 1,000.00
100 Lampu LED Downlight 24 W unit 390,000.00
100 Lampu LED Downlight 16 W bh 250,000.00
101 Lampu LED Downlight 9 W bh 114,500.00
102 Lampu LED Downlight 5 W bh 85,000.00
No. Jenis Bahan Sat. Harga ( Rp )
103 Stop Kontak Dinding 1PH bh 45,000.00
104 Stop Kontak Dinding AC bh 85,000.00
105 Saklar Ganda BH 28,000.00
106 Saklar Tunggal BH 23,000.00
107 Panel Box Indoor BH 800,000.00
108 Panel Box Indoor BH 250,000.00
109 MCB , 6A 1 PHASE bh 195,000.00
110 MCB , 10A 3 PHASE bh 404,500.00
111 MCCB , 35A 3 PHASE bh 625,000.00
112 Ceilling Exhaust fan bh 600,000.00
113 AC Splitz Kapasitas 1 PK Anti bacteri (Indoor & Out Door + Bracket) unit 6,750,000.00
114 Bracket + jasa set 125,000.00
115 Instalasi AC pipa Tembaga 1/4" & 3/8" + jasa m' 140,000.00
116 Pipa drain AC + jasa m' 20,000.00
117 Kabel 3x2.5mm + jasa m' 31,000.00
118 Biotank Kapasitas 2 m3 Lengkap… terpasang unit 16,800,000.00
119 Kursi konferensi dengan roda unit 3,750,000.00
120 Meja R. Kasie dan R. Kasub unit 6,500,000.00
121 Lemari R. Kasie dan R. Kasub unit 5,400,000.00

B. UPAH PEKERJA
No. PEKERJA Sat.
1 Mandor Org/Hr 250,000.00
2 Kepala Tukang Org/Hr 180,000.00
3 Tukang Org/Hr 165,000.00
4 Pembantu Tukang Org/Hr 155,000.00

C. SEWA ALAT
No. PEKERJA Sat.
1 Sewa mesin trouwel per Hari 500,000.00
2 Stamper jam 104,000.00
3 Alat bantu Strouss diameter 30 cm jam 75,000.00
BERAT BESI PER M3 BETON STRUKTUR KOLOM (MASJID)
BENGKEL ELEKTROMEDIS
Dimensi Tula
Type
Lebar Tinggi Panjang Jml
K1 1 K1 = 25x25 K-225 (f'c=18,675 MPa) BENGKE 0.25 0.25 16.00 6
K2 2 K2 = 25x25 K-225 (f'c=18,675 MPa) BENGKE 0.25 0.25 16.00 10

KP P KP = 12x12 K-175 (f'c=14,5MPa) BENGKEL 0.12 0.12 69.44 4


KP1 P1 KP1 = 12x20 K-175 (f'c=14,5MPa) BENGKEL 0.12 0.2 41.67 4

Strouss Diameter 30cm K-225 (f'c=18,675 MPa) 0.3 14.15 6


(MASJID) -

Tulangan Perlu Tulangan Geser (sengkang)


Dia Index Waste Berat (kg) Dia Jarak (m) Jml sengkang Panjang 1 sengkang
12 0.006165 1.1 93.75 8 0.15 107.67 0.85 0.006165
12 0.006165 1.1 156.25 10 0.15 107.67 0.85 0.006165

10 0.006165 1.05 179.81 6 0.2 348.22 0.33 0.006165


12 0.006165 1.05 155.36 8 0.15 278.78 0.49 0.006165

12 0.006165 1 75.36 8 0.15 95.31 1.01 0.006165


kang) Jml Besi Ulir Jml Besi Polos Total Berat
Index Waste Berat (kg) (kg) (kg) (kg)
1 36.11 93.75 36.11 129.86 16 16
1 56.42 156.25 56.42 212.67 16 16

1 25.50 0.00 205.32 205.32 16.6666667 16.6666667


1 53.90 0.00 209.26 209.26 16.6666667 16.6666667

1 38.08 75.36 38.08 113.43 13.3333333


BERAT BESI PER M3 BETON STRUKTUR (MASJID)
BENGKEL ELEKTROMEDIS
SLOOF
Dimensi
Type
Lebar Tinggi

S1 1 S1 = 15x25 K-225 (f'c=18,675 MPa) B 0.15 0.25


S2 2 S2 = 15x20 K-225 (f'c=18,675 MPa) B 0.15 0.2

BALOK
Dimensi
Type
Lebar 1 Tinggi 1 Lebar 2 Tinggi 2
B1 1 B1 = 20x30 K-225 (f'c=18,675 MPa) B 0.2 0.3 0 0
B2 2 B2 = 20x30 K-225 (f'c=18,675 MPa) B 0.2 0.3 0 0
BA A BA = 10x50 K-225 (f'c=18,675 MPa) 0.1 0.5 0 0

BR R BR = 12x20 K-175 (f'c=14.5 MPa ) BENGKE 0.12 0.2 0 0


-

i Tulangan Tumpuan Tulangan Lapangan


Panjang Jml Dia Index Waste Berat (kg) Jml Dia Index Waste

26.67 6 12 0.006165 1.1 156.25 6 12 0.006165 1.1


33.33 4 12 0.006165 1.1 130.20 4 12 0.006165 1.1

i Tulangan Tumpuan Tulangan Lapangan


Panjang Jml Dia Index Waste Berat (kg) Jml Dia Index Waste
16.67 6 12 0.006165 1.1 97.65 6 12 0.006165 1.1
16.67 7 12 0.006165 1.1 113.93 7 12 0.006165 1.1
20.00 5 8 0.006165 1.1 43.40 5 8 0.006165 1.1

41.67 4 12 0.006165 1.1 162.76 4 12 0.006165 1.1


Lapangan Tulangan Geser (sengkang)
Berat (kg) Dia Jarak (m) Jml sengkang Panjang 1 sengkang Index Waste Berat (kg)

156.25 8 0.175 152.38 0.90 0.006165 1 54.11


130.20 8 0.175 190.48 0.80 0.006165 1 60.12

Lapangan Tulangan Geser (sengkang)


Berat (kg) Dia Jarak (m) Jml sengkang Panjang 1 sengkang Index Waste Berat (kg)
97.65 8 0.175 95.24 1.00 0.006165 1 37.58
113.93 8 0.175 95.24 1.00 0.006165 1 37.58
43.40 10 0.15 133.33 0.82 0.006165 1 67.40

162.76 8 0.175 238.10 0.74 0.006165 1 69.52


Jml Besi Ulir Jml Besi Polos Total Berat
(kg) (kg) (kg)

156.25 54.11 210.36 13.3333333


130.20 60.12 190.33 13.3333333

Jml Besi Ulir Jml Besi Polos Total Berat


(kg) (kg) (kg)
97.65 37.58 135.23 9.33333333
113.93 37.58 151.51 9.33333333
43.40 67.40 110.81 17.2

162.76 69.52 232.27 16.6666667


PERHITUNGAN
PLAT LAN
NO. URAIAN PEKERJAAN

h plat
0.10
jarak Dia
Plat Lantai ATAP ( 3 x 3 x 0,1 ) K-225 (f'c=18,675 MPa)
Tul. arah X (Lap) 0.15 8
Tul. Arah Y (Lap) 0.15 8
Tul. arah X (Tump) bag. Atas kanan dan kiri 0.15 8
Tul. arah X (Tump) bag. Bawah kanan dan kiri 0.30 8
Tul. arah Y (Tump) bag. Atas kanan dan kiri 0.15 8
Tul. arah Y (Tump) bag. Bawah kanan dan kiri 0.30 8
Tul. Susut/bagi bag. Arah X atas dan bawah 0.15 8
Tul. Susut/bagi bag. Arah Y atas dan bawah 0.15 8

h plat
0.10
jarak Dia
Meja Beton ( 0,6 x 4 x 0,1 ) K-225 (f'c=18,675 MPa)
Tul. arah X (Lap) 0.15 10
Tul. Arah Y (Lap) 0.15 10
Tul. arah X (Tump) bag. Atas kanan dan kiri 0.15 10
Tul. arah X (Tump) bag. Bawah kanan dan kiri - 10
Tul. arah Y (Tump) bag. Atas kanan dan kiri 0.15 10
Tul. arah Y (Tump) bag. Bawah kanan dan kiri - 10
Tul. Susut/bagi bag. Arah X atas dan bawah 0.15 10
Tul. Susut/bagi bag. Arah Y atas dan bawah 0.15 10

h plat
0.10
jarak Dia
Plat Beton wiremesh M8 ( 6 x 6 x 0,1 ) K-225 (f'c=18,675 MPa)
Tul. arah X (Lap) 0.15 8
Tul. Arah Y (Lap) 0.15 8
Tul. arah X (Tump) bag. Atas kanan dan kiri 0.15 8
Tul. arah X (Tump) bag. Bawah kanan dan kiri 0.30 0
Tul. arah Y (Tump) bag. Atas kanan dan kiri 0.15 8
Tul. arah Y (Tump) bag. Bawah kanan dan kiri 0.30 0
Tul. Susut/bagi bag. Arah X atas dan bawah 0.15 8
Tul. Susut/bagi bag. Arah Y atas dan bawah 0.15 8

h plat
0.12
jarak Dia
Plat Beton bawah SC ( 0,47 x 3 x 0,12 ) K-225 (f'c=18,675 MPa)
Tul. arah X (Lap) 0.15 8
Tul. Arah Y (Lap) 0.15 10
Tul. arah X (Tump) bag. Atas kanan dan kiri 0.15 8
Tul. arah X (Tump) bag. Bawah kanan dan kiri 0.30 0
Tul. arah Y (Tump) bag. Atas kanan dan kiri 0.15 10
Tul. arah Y (Tump) bag. Bawah kanan dan kiri 0.30 0
Tul. Susut/bagi bag. Arah X atas dan bawah 0.15 8
Tul. Susut/bagi bag. Arah Y atas dan bawah 0.15 10
-

PERHITUNGAN VOLUME
PLAT LANTAI
PERHITUNGAN VOL. SAT

L P

Lx Ly 1/4 Lx 1/2 Lx
3.00 3.00 0.75 1.50
L N Lapis Berat kg/m' Waste
1.15
1.50 10.00 2.00 0.395 1.15 13.61 kg
1.50 10.00 2.00 0.395 1.15 13.61 kg
1.50 10.00 2.00 0.395 1.15 13.61 kg
1.50 5.00 - 0.395 1.15 - kg
1.50 10.00 2.00 0.395 1.15 13.61 kg
1.50 5.00 - 0.395 1.15 - kg
3.00 10.00 2.00 0.395 1.15 27.23 kg
3.00 10.00 2.00 0.395 1.15 27.23 kg
Volume Beton = 0.900 m3 108.91 kg
polos

L P

Lx Ly 1/4 Lx 1/2 Lx
0.60 4.00 0.15 0.30
L N Lapis Berat kg/m' Waste
1.15
0.30 24.67 1.00 0.617 1.15 5.25 kg
3.70 2.00 1.00 0.617 1.15 5.25 kg
0.30 24.67 1.00 0.617 1.15 5.25 kg
0.30 - 1.00 0.617 1.15 - kg
0.30 2.00 1.00 0.617 1.15 0.43 kg
0.30 - 1.00 0.617 1.15 - kg
0.60 2.00 1.00 0.617 1.15 0.85 kg
4.00 2.00 1.00 0.617 1.15 5.67 kg
Volume Beton = 0.240 m3 22.69 kg
polos

L P

Lx Ly 1/4 Lx 1/2 Lx
6.00 6.00 1.50 3.00
L N Lapis Berat kg/m' Waste
1.10
3.00 20.00 1.00 0.395 1.10 26.04 kg
3.00 20.00 1.00 0.395 1.10 26.04 kg
3.00 20.00 1.00 0.395 1.10 26.04 kg
3.00 10.00 1.00 - 1.10 - kg
3.00 20.00 1.00 0.395 1.10 26.04 kg
3.00 10.00 1.00 - 1.10 - kg
6.00 20.00 1.00 0.395 1.10 52.09 kg
6.00 20.00 1.00 0.395 1.10 52.09 kg
Volume Beton = 3.600 m3 208.34 kg
polos

L P

Lx Ly 1/4 Lx 1/2 Lx
0.47 3.00 0.12 0.24
L N Lapis Berat kg/m' Waste
1.15
0.24 18.43 1.00 0.395 1.15 1.97 kg
2.77 3.00 1.00 0.617 1.15 5.88 kg
0.24 18.43 1.00 0.395 1.15 1.97 kg
0.24 9.22 1.00 - 1.15 - kg
0.24 3.00 1.00 0.617 1.15 0.50 kg
0.24 0.78 1.00 - 1.15 - kg
0.47 1.57 1.00 0.395 1.15 0.33 kg
3.00 3.00 1.00 0.617 1.15 6.38 kg
Volume Beton = 0.169 m3 17.03 kg
polos
#REF!

KETERANGAN PANJANG JML SENGKANG

begesting

10.00

per m3 beton
121.00
121.01

begesting

10.00

per m3 beton
95.00
94.54

begesting
0.67

per m3 beton
58.00
57.87

begesting

13.26

per m3 beton
101.00
100.64
No Uraian
1 2

1 P1 Poer 1 - (100 x 100 x 30 cm) - K-225 (f'c=18.675 Mp 1000 x 1000 x 300 mm 0.30
Tul. Vertikal
Tulangan Bawah D 13 - 150 mm
Tulangan Atas D 13 - 150 mm
Tul. Horisontal
Tulangan Bawah D 13 - 150 mm
Tulangan Atas D 13 - 150 mm

2 P2 Poer 2 - (150 x 75 x 30 cm) - K-225 (f'c=18.675 Mpa) 1500 x 750 x 300 mm 0.34
Tul. Vertikal
Tulangan Bawah D 16 - 150 mm
Tulangan Atas D 16 - 150 mm
Tul. Horisontal
Tulangan Bawah D 16 - 150 mm
Tulangan Atas D 16 - 150 mm
-

Panjang Jml. Tul Panjang Total Berat/M' Berat Total


3 4 5=3x4 6 7=5x6

3.33 BH

1.50 7.00 10.50 1.04 10.94


1.16 7.00 8.09 1.04 8.43

1.50 7.00 10.50 1.04 10.94


1.16 7.00 8.09 1.04 8.43

Berat Besi 1 Bh 38.76 Kg begesting


Berat Besi 1 M3 129.19 Kg 4.00

2.96 BH

2.00 6.00 12.00 1.58 18.95


1.69 6.00 10.15 1.58 16.03

1.25 11.00 13.75 1.58 21.71


0.94 11.00 10.36 1.58 16.36

Berat Besi 1 Bh 73.05 Kg begesting


Berat Besi 1 M3 216.43 Kg 4.00
Item Pekerjaan Koef Satuan
Keselamatan dan Kesehatan Kerja (K3)
Sosialisasi dan Promosi K3
Induksi K3 (safety induction) 30.00 Org
Pengarahan K3 (safety briefing) 30.00 Org
Alat pelindung kerja
Tali keselamatan (safety line) 1.00 Ls
Pembatas area (restricted area) 1.00 Ls
Alat Pelindung Diri
Topi pelindung 9safety helmet) 20.00 Bh
Pelindung pernafasan dan mulut (masker) 10.00 kotak
Sarung tangan (safety gloves) 20.00 Psg
Sepatu keselamatan (safety shoes) 20.00 Psg
Rompi keselamatan (safety vest) 20.00 Bh
Fasilitas Sarana Kesehatan dan Rambu - rambu Keselamatan Kerja
Peralatan P3K (kotak P3K, tandu, tabung oksigen,obat luka) 1.00 Ls
Rambu - Rambu
Rambu Petunjuk 3.00 Bh
Rambu Larangan 3.00 Bh
Tongkat pengatur lalu lintas (warning lights stick) 4.00 Bh
Kerucut lalu lintas (traffic cone) 6.00 Bh
Harga Satuan Jumlah

Rp 2,500.00 Rp 75,000.00
Rp 2,500.00 Rp 75,000.00

Rp 1,200,000.00 Rp 1,200,000.00
Rp 1,200,000.00 Rp 1,200,000.00

Rp 65,000.00 Rp 1,300,000.00
Rp 25,000.00 Rp 250,000.00
Rp 5,000.00 Rp 100,000.00
Rp 300,000.00 Rp 6,000,000.00
Rp 50,000.00 Rp 1,000,000.00

Rp 3,000,000.00 Rp 3,000,000.00

Rp 100,000.00 Rp 300,000.00
Rp 100,000.00 Rp 300,000.00
Rp 150,000.00 Rp 600,000.00
Rp 100,000.00 Rp 600,000.00
Jumlah : Rp 16,000,000.00
Nilai HSPK : Rp 16,000,000.00