TPF Consultores Portugal – Credentials for WTP & Distribution
System in Africa
Sl.no Project name Description
• Drinking water supply system; Pumping station at Reservoir; • Water intake & water conveyance, Infrastructures And Equipment of • Water Treatment Plant; treated water conveyance; 1 The New Centrality of Búcula, • Electrical installations and automation; Bengo, Angola • Wastewater treatment system • Water supply network, sanitation network and stormwater network • Drinking water supply system; Pumping station at Reservoir; • Water intake & water conveyance, Infrastructures And Equipment of • Water Treatment Plant; treated water conveyance; 2 The Centrality of Bailundo, Angola • Electrical installations and automation; • Wastewater treatment system • Water supply network, sanitation network and stormwater network Infrastructures of The Centrality of • Central water supply system, combined sewer system, 3 Luena, Angola • Collection and transport system for rainwater and wastewater, WWTP Consulting Services of Design Checking & Works Supervision of • The project comprises the design and construction of 50 km of 4 Water Network & Home primary and secondary of water network and 15,000 household Connections for Luena City, connections. Moxico, Angola • Detailed Designs for Domestic Wastewater and Stormwater Systems External Infrastructures of The of the New Centrality of Zango 5 New City of Zango 0, Angola • Environmental and Economic Feasibility Studies. • Transmission of domestic wastewater to the ZEE WWTP of 2000 m3. • Detailed Designs for the WWTP of 3600 m3 & Stormwater Drainage Systems External Infrastructure of The New 6 • Detailed Design Review for the WWTP & Stormwater Drainage Centrality of Capari, Angola Systems. • Environmental and Economic Feasibility Studies Water Network Supply and The project comprises the design & construction of 120 km of primary 7 Connections of Domestic City of and secondary of water network and 10,126 household connections Uíge, Angola • Expansion the water distribution network by 2,000 km, with pipework New Water Distribution Networks diameters of 63 to 900 mm to increase water service coverage to 90%; 8 and Customer Connections in Dar • Construction of about 372,000 household connections and 470 water Es Salaam City – Tanzania kiosks; The project comprises the design and construction of Water supply 9 Dundo City, Angola system (41 km), sewage and drainage (wastewater: 40 km and storm water: 40 km) The project comprises the design of Water supply system (65 km), 10 Cabinda City, Angola sewage and drainage (wastewater: 43 km and storm water: 78 km) • The project comprises the design of Water supply system (1900 km), sewage network (1300 km) 11 Kilamba Kiaxi City, Angola • Water treatment plant of 16000 m3, internal network, pipeline from Kuanza river and pump station for intake Detailed Design, Design Review and Construction Supervision for Preliminary Design, Detailed Design, Design Review and Works 12 The Maputo Water Supply Project- Supervision of Water supply system (400 km), 4 Distribution centres Extension, Mozambique • Preparation of Master Plan of Integrated infrastructure, Preliminary Study, Detailed Design and Technical Assistance to construction work for Water Supply System, including Rising main (1.7 km of DN 250 mm), Surface Reservoirs of 3000 m3 & a water tower for 300 m3, Hydropower pumping Station (1 unit with rated flow of 50 L/s), Water Master Plan of Integrated 13 distribution network (63,545 km of DN 90 mm to DN 315 mm) and fire Infrastructure of Cacuaco, Angola protection System. • Sanitation System, including domestic wastewater drainage system (39,788 km between DN 200 and 400 mm and four pumping stations with flows & pumping heights of 6 L/s-H=23 m; 15,2 L/s-H=23 m, 26,6L/s-H=16 m and 6 L/s-H=12 m • Preliminary Study, Detailed Design and Technical Assistance • 14 km force main in 300 mm dia, 2 raw water tanks of 300 m3 & 1000 Water Supply to The Chitima 14 m3, 1 treated water tank of 2,500 m3,1 water treatment station of 540 Valley, Mozambique m3/h, 4.5 km long gravity main in 315 mm diameter & 20 km of distribution network dia 315 mm and 90 mm Administrative Buildings & 35 • Water distribution network: 37.5 km; Factories Including Infrastructures • Waste water network: 42.5 km; WWTP: 1 unit 15 for the 2nd, 3rd & 4th Quadrants • Water reservoir with 100 m3 & pumping stations of 20 kVA: 35 unit; of The Special Economic Zone • Water reservoir with 200 m3 & pumping station of 120 kW: 1 unit; (Zee), Luanda, Bengo, Angola • Water reserve with 3 000 m3 & pumping station of 260 kW: 1 unit.