Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 1

INSPECTION QTY ANNEXURE

CUSTOMER/SUPPLIER M/S : HYUNDAI ENGINEERING & CONSTRUCTION CO., LTD. (HDEC) DATE:27-11-2024
PO NO. : SM12-PI-PO-054-4600063569
W.O. NO. : W22025-HYUNDAI-13 & W23018-HYUNDAI-20-175
PROJECT : MARJAN INCREMENT PROGRAM (MIP) PKG12 -KSA
HDG ANNEXURE (ANX-HYUNDAI-PKG12-B1/B2/B6/B7/B8/B10/B11) 254FT

S.N PO SL. No. Item Description Total Qty. Paint System Unit Remarks

1 3172 PS08-B3AV STD-248, T-POST TYPE PIPE SUPPORT 8 GALVA. + APCS-26 Each OK

2 4592 VPS-B3B-114 STD-256, VARIABLE HEIGHT PIPE SUPPORT 1 GALVA. + APCS-26 Each OK

3 6629 PS08-A3AW STD-248, T-POST TYPE PIPE SUPPORT 1 GALVA. + APCS-26 Each OK

4 9686 PS06-A3AU STD-246, GOAL POST TYPE PIPE SUPPORT 2 GALVA. + APCS-26 Each OK

TOTAL 12
Note:
1. A36- 4, 6 & 10mm used for clamp plate of Clamped shoes.
2. Gr.60- 10mm used for clamp plate of Clamped shoes.
3. Gr.60- 6mm used for center plate of Clamped shoes.
4. A36- 10 & 14mm used for base plate of Clamped shoes & Structural support.
5. A36- 10mm used for Rib plate of Structural support.
6. SS304- 6mm used for side & base plate of special support.

You might also like