Professional Documents
Culture Documents
Annex For Ageing Buildings (Apr 2023 Ver)
Annex For Ageing Buildings (Apr 2023 Ver)
As part of the process for submission of the report to the Commissioner of Building Control, we would like
the Structural Engineer to conduct in person, a presentation on the results of inspection to us at our office. The
presentation should preferably be in PowerPoint with one hardcopy of the presentation materials to be
submitted to the Processing Officer. We would also require the building owner and/or, MCST and/or, Facilities
Managers/Managing Agent to attend the session too.
(https://go.gov.sg/psi-presentation)
The acceptance of the submission is based on the basis that the guidelines on PSI have been complied with.
The structural engineer shall provide justifications in his/her visual inspection report that the inspection
coverage is representative of the building’s condition. He/she can illustrate the areas that have been inspected
on a layout plan and provide a summary of inspected area e.g., listing of units that were inspected.
___________________
1
Any structural works that are or were caried out without any prior approval by the Commissioner of Building
Control of the plans of those works where prior approval is required under Part 2 of the Building Control Act 1989.