NO.: 0243.

23

QUOTATION FOR STEEL STRUCTURE


REV.01
PROJECT : ZAMONA SKY TOWER 2
ITEM : STEEL STRUCTURE
LOCATION : PHILIPPINES
OPTION 2: Used SMF frame and follow steel design guide 25 for steel members Tỷ giá USD 24,200
UNIT RATE UNIT RATE AMOUNT
NO. DESCRIPTION UNIT QUANTITY
(VND) (USD$) (USD$)
I. BUILDING 10 STOREY
1 MAIN FRAME
Steel structure: surface preparation Sa 2.0 & Epoxy painted ((2 coats, total 100 micromet
DFT)
Plate steel (fy=345 MPa) ton 446.10 0 #REF! #REF!
Auxiliary materials (bolt, anchor bolt...) ton 8.92 0 #REF! #REF!

2 MEZZANINE
Steel structure: surface preparation Sa 2.0 & Epoxy painted ((2 coats, total 100 micromet
DFT)

Plate steel (fy=345 MPa) ton 308.00 - #REF! #REF!

Shape steel (fy=245 MPa) ton 32.11 - #REF! #REF!


Auxiliary materials (bolt, anchor bolt...) ton 6.80 - #REF! #REF!

3 ELEVATOR LOBBY
Steel structure: surface preparation Sa 2.0 & Epoxy painted ((2 coats, total 100 micromet
DFT)

F.05-QT.01/TK_28/09/2019_Rev.02 Page 1 / 2
UNIT RATE UNIT RATE AMOUNT
NO. DESCRIPTION UNIT QUANTITY
(VND) (USD$) (USD$)
Plate steel (fy=345 MPa) ton 21.50 0 #REF! #REF!
Box steel (fy=245 MPa) ton 4.73 0 #REF! #REF!
Auxiliary materials (bolt, anchor bolt...) ton 0.52 0 #REF! #REF!

Subtotal (I) ton 828.7 #REF!


II. OTHER ITEMS
1 Galvanized decking: DDC's profile 0.75mm thk. m² 17,054 - #REF! #REF!
2 Staircase: 02 set m 173 - #REF! #REF!
3 Conventional stairs in Residential loft floor m 1,650 - #REF! #REF!
4 Handrail for staircase m 3,646 - #REF! #REF!
5 Handrail for balcony m 1,519 - #REF! #REF!

Subtotal (II) ton 443.0 #REF! #REF!


III. PACKING
Packing cost for steel structure (use Cont. 40' HC) and shipping CIF to North Manila-
1 cont 46.00 0 #REF! #REF!
Philippines- Incoterm 2020. (Use 18MT/Container)
Packing cost for steel structure (use Cont. 40' HC) and shipping CIF to North Manila-
1 cont 1.00 0 #REF! #REF!
Philippines- Incoterm 2020.

Subtotal (III) #REF!

TOTAL (rounded off) 828.69 #REF! #REF!


(Inwords: USD$…………………………….)

Notes :
+ Erection not by Dai Dung.
+ This quotation only includes attached items.
+ This quotation is valid within 07 days.
+ Payment term:
* 30%: By T/T after signing contract.
* 70%: By L/C.