23
2 MEZZANINE
Steel structure: surface preparation Sa 2.0 & Epoxy painted ((2 coats, total 100 micromet
DFT)
3 ELEVATOR LOBBY
Steel structure: surface preparation Sa 2.0 & Epoxy painted ((2 coats, total 100 micromet
DFT)
F.05-QT.01/TK_28/09/2019_Rev.02 Page 1 / 2
UNIT RATE UNIT RATE AMOUNT
NO. DESCRIPTION UNIT QUANTITY
(VND) (USD$) (USD$)
Plate steel (fy=345 MPa) ton 21.50 0 #REF! #REF!
Box steel (fy=245 MPa) ton 4.73 0 #REF! #REF!
Auxiliary materials (bolt, anchor bolt...) ton 0.52 0 #REF! #REF!
Notes :
+ Erection not by Dai Dung.
+ This quotation only includes attached items.
+ This quotation is valid within 07 days.
+ Payment term:
* 30%: By T/T after signing contract.
* 70%: By L/C.