Foundation Layout (Powerhouse) Roof Deck Framing Plan (Powerhouse)
Foundation Layout (Powerhouse) Roof Deck Framing Plan (Powerhouse)
C1/F1
FTB-4
FTB-3
FTB-2
RB-1
RB-1
RB-2
FTB-2 FTB-2 RB-1 RB-1
1 1
FLOOR LEVEL MARK BREADTH DEPTH LEFT SUPPORT MID - SPAN RIGHT SUPPORT LEFT MID. RIGHT
STIRRUPS SIZE AND SPACING REMARKS
B D TOP BOTTOM TOP BOTTOM TOP BOTTOM SUPP. SPAN SUPP.
TB-1
TRANSFORMER PLATFORM
ROOF DECK USE 10mmØ STIRRUPS SPACED 1@50mm, @ 75mm
BEAMS RB-1 300 350 3-16mmØ 3-16mmØ 3-16mmØ 3-16mmØ 3-16mmØ 3-16mmØ NEAR SUPPORT @ 2D,
REST @ 125mm O.C
3 (POWERHOUSE)
USE 10mmØ STIRRUPS SPACED 1@50mm, @ 75mm use 1-pair 16mm Ø
S 16 RB-1A 300 350 3-16mmØ 3-16mmØ 3-16mmØ 3-16mmØ 3-16mmØ 3-16mmØ NEAR SUPPORT @ 2D,
REST @ 125mm O.C
web bars
TRANSFORMER
USE 10mmØ STIRRUPS SPACED 1@50mm, REST @
BEAMS TB-1 250 300 3-16mmØ 3-16mmØ 3-16mmØ 3-16mmØ 3-16mmØ 3-16mmØ 100mm O.C
4 beam schedule
S 16
PROJECT NAME AND LOCATION SHEET CONTENTS PREPARED REVIEWED SUBMITTED RECOMMENDED APPROVED SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS C.Y. 2023 PROJECT FOUNDATION LAYOUT (POWERHOUSE) FLORANTE F. MANGAMPO
ROOF DECK FRAMING PLAN ENGINEER I
REGIONAL V SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING
ALBAY 2ND DISTRICT ENGINEERING OFFICE GAPS: MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES
(POWERHOUSE)
TRANSFORMER PLATFORM
DATE:
S -
RES V COMPOUND, AIRPORT SITE, LEGASPI CITY STRUCTURAL AND RESILIENCE PROGRAM: CONSTRUCTION (POWERHOUSE) CHECKED PAUL ANTHONY B. AZOTEA EMIL G. FLORES JOANNE T. MORALES WARREN B. AZOTEA
OF MINES AND GEOSCIENCES REGIONAL OFFICE V TEACHING BEAM SCHEDULE (POWERHOUSE) CARLOS LOPE L. CAABAY III 16 - -
AND LEARNING CENTER, GOVERNMENT REGIONAL CENTER, ENGINEER II OIC-CHIEF, PLANNING & DESIGN SECTION OIC-ASSISTANT DISTRICT ENGINEER DISTRICT ENGINEER
ENGINEER II
RAWIS, LEGAZPI CITY DATE: DATE: DATE: DATE: