Professional Documents
Culture Documents
006 Check List For Shuttering
006 Check List For Shuttering
Contract
Client
Concessionaire
IC
EPC Contractor
Bridge no Date:
Sub-Component:
Approved/
Sl no Item Rectification required Remarks
Accepted
Dimensions:
a. Length
b. Breadth/Thickness
c. Depth /Height
1
d. Diameter
e. Demoulding agent
f. Verticality
Supporting arrangement:
a. Supports
2
b. Bolting
Anchor coil
3
a.
Staging arrangement: (Approved drawing designator false work)
a. No. of supports
4 b. Spacing of supports
c. Position of supports
Shuttering position:
a. Line
5 b. Level
c. Placement inposition
Remarks
work)
Consultant's Representative
Page No.: 1 of 1