Job Description- QIP for P22 Small Bore Piping Valve Replacement

Drawing No.: Sheet No. Rev.


EFERT EFERT WELD # WELD # WELD #
S# Activity Criteria Kamcon
FM Insp EFERT EFERT
Value Kamcon FM Insp Value Kamcon FM Insp Value Kamcon EFERT FM Insp
Material Varification /
1 Consumables SA335 GR P22 W - P
Randomly
Tacking material /
2 P22 H W H
welding check
3 Before Bevel Fitup check as per WPS H H -
start of
4 welding Welder I.D for Root P22-Qualified H R R

Welding consumables
5 as per WPS ER-90S-B3 W W W
(root+2Hot)

6 DPT of both Bevels No defects H - H

Pre-Heat Prior To
7 250 ℃ min. W - W
Root

8 DPT of Root Not Required


Interpass temp
9 During Max 300 ℃ W W W
control
welding
Welding finishing: VI
Final (No cleat mark,
no under cut, No Capping should not
10 H W H
spatter, No Arc strike, >2.5mm
no other pit at weld
and HAZ area)

11 Final Pass DPT No defects W - P

After Post Weld Heat


12 650℃ for 15 min H - R
Welding Treatment
13 Hardness test < 225BHN H - H,P
100% of Butt Joints
14 RT R - P
& Golden Joint

15 Repairs (if any) H - H