Inspection Activity:
Inspection Conducted on April 10, 2024, at 10:00 am to 12:00nn
Each and every inspection has been completed in compliance with RA 7920 and the PEC
standards. In accordance with the as-built plan, the dimensions of the installation, lighting,
breakers, and cable sizes are all current. It showed that the panel box was difficult to access due
to an obstruction, the convenience outlet was not encased and the convenience outlet not
properly installed.
Height checking of convenience outlets
Inspecting of Panel Box
Inspecting of uncased Convenience Outlet
Measuring the height of light switches
Service entrance constructed behind the