Job Safety Analysis

Company Name: Damodar Valley Corporation (MTPS) Date: JSA No.

Department Name: Ash Handling Management System (AHMS) Permit to Work (PTW) Required: Yes No

Contractor Name (If Applicable): Localized Shutdown: Required Not Required

Job Activity: Overhauling/Dismantling/PM/Replacement or fitting of BA OTP/AWP/SWP/VDP/FASP/BASP Site Location:

Required PPE’s for execute job: Safety Helmet, Steel Toe Shoe, Safety Googles, Hand Gloves, Ear Plug.

Activity/Key Stages Potential Hazards Risk Control Measures Responsibility


List the tasks required to Against each task list the List the control measures required to eliminate or minimize the risk or injury arising Write the name of the
perform the activity in the hazards that could cause from the identified hazards Dept./Person responsible to
sequence they are carried out injury the task is performed implement the control
measure identification
1. Prepare and inspect the area 1. Slips, trips, and falls 1. Barricade work space with caution tape,
for unsafe conditions. Inspect 2. Overhead hazards cones, or signs if necessary. Maintain communication when working with others.
tools and equipment. 3. Noise 2. Ensure proper clearance of equipment. Wear a hardhat.
4. Musculoskeletal injuries
3. Wear hearing protection (Ear Plug) if working around loud equipment.
4. Use proper lifting techniques and body mechanics. Two people lifting above 25 kgs if
possible. Use lifting equipment when possible.
2. De-energize and lock out/tag 1. Electrical hazards 1. De-energize equipment If area is wet, check for frail, corroded, and/or exposed
out the equipment. Block 2. Physical Hazards wires. Ensure proper isolation and cross check it. (Group LOTO is required when
moveable parts to prevent working with others)
inadvertent movement. 2. KEEP work environment clean and tidy to avoid clutter. Clutter may cause accidents.

3. Overhauling/Lifting 1. Hand injuries Caused by 1. An appropriate and valid PTW to be ensured. Appropriate PPEs should be worn by
Operation (Machine) of not using appropriate tools. the workers. Be cautious of hand injuries while using sharp tools and wear protecting
Centrifugal Pump 2. Equipment/ tool damage gloves. Unauthorized personal entry should be restricted.
Disassembly/Assembly due to inappropriate/
2. Load should not exceed SWL of machine/ rigging gears. Only 3rd party tested tools
substitute tools.
tackle should be used. There should only one signal man at the time, and he should be
visible to the operator (Hydra or EOT). No worker should be allowed near/ beneath
when load is in suspended condition.

4. Check the intended route 1. Slips, Trips & Falls 1. Inspect the area immediately around the load and the route for clearance and
and point of placement Crush Injury tripping hazards. Clear movable objects from the route. If the load must be carried for
a long distance, find location(s) load can be placed to allow for a rest break. If possible,
keep load elevated to avoid lifting the object to resume moving it
5. Install new pump, remove 1. Musculoskeletal injuries 1. Use proper lifting techniques and body mechanics.
equipment, reconnect wires, 2. Electrical hazard
2. Restore energize equipment If area is wet, check for frail, corroded, and/or exposed
refill water, re-energize, and
wires. Ensure proper isolation and cross check it. (Group LOTO removing is required
test the pump.
when working with others)
6. Housekeeping 1.Physical Injuries could 1. Ensure that after work, site is
occur while stepping on clean and tidy, remove all damage gasket, spare from location.
objects and tripping, slippery Clean surface from oil and grease that are used.
areas, and fall.

1. HSE Plan and safety procedures are to be followed at all times.


General Safety 2. Minimum PPE to be worn at all times.
3. This JHA to be available at all point of work-operatives must be informed of this JHA and understand the risks involved in the works.
Condition
4. Tool box talk / pre-job brief to be given at the start of each work shift and before starting a new task or activity.
Requirements 5. Summer and Ramadan working hours changes are to be observed and details posted at worksite.
6. Paramedical or ambulance facilities to be available emergency medical no should be visible at site.

Required Training (Tick Which are applicable) 1. Hazard Communication (GHS) 2. Lock Out/Tag Out

3. Confined Space 4. Personal Protective Equipment

JSA Prepared By JSA Approved By