1 7 116+680 117+230 Median Median Drain Cleaning 550 M. 2 11 145+350 145+750 RHS Rank Vegetation 400 M. 3 19 08+600 09+640 MBCB Work Repair Work
1 7 116+680 117+230 Median Median Drain Cleaning 550 M. 2 11 145+350 145+750 RHS Rank Vegetation 400 M. 3 19 08+600 09+640 MBCB Work Repair Work
Consultant L.N. Malaviya Infra Projects Pvt Ltd In association with DN Consultant
Contractor M/s. Abhipsa Construction.
Daily Progress Report on Date: 27.04.2024
BOQ Item Depth<50mm
S.no CH.From CH.To LHS/RHS Boq item no/item of work Length Breath Qty sqmt Contractor Consultant Authority Remark
No. or>50mm
1 7 116+680 117+230 Median Median Drain Cleaning 550 m.
2 11 145+350 145+750 RHS Rank Vegetation 400 m.
3 19 08+600 09+640 MBCB Work repair Work