7.

0 Environmental Monitoring Program

Below itemizes the proposed monitoring program for the project:

Key Environmental Potential Sampling & Measuring Plan Annual


Parameters to be Lead
Aspects per Project Impacts Per Estimated
Monitored Method Frequency Location Person
Phase Envt’l Sector Cost
OPERATION PHASE
Proper irrigation
Ambient Amount of storm At discharge Part of the
systems leading into As generated PCO
water water runoff point project cost
Generation of river channel
wastewater Total Suspended
Laboratory analysis of At discharge Part of the
Water quality Solids (TSS), Color, As generated PCO
samples point project cost
pH
Weekly visual
Implementation of
Total Suspended monitoring or as Area(s) by the Part of the
Passing vehicles Air quality vehicular speed to 20- PCO
Particulates (TSP) recommended by open road project cost
30 kph
regulating authorities
Non-hazardous solid Land Volume of solid Part of the
In-house monitoring Daily At the site PCO
waste generation contamination waste project cost
Classification and
Hazardous waste Land Part of the
quantity of hazardous In-house monitoring Daily At the site PCO
generation contamination project cost
waste generated
PM, NOx, and CO or Annual or as Generator and
As described in Clean Part of the
Operation of Standby Air quality as recommended by prescribed in DENR engine pumps PCO
Air Act project cost
Electricity Generator regulating authorities MC 2007-003 area
and fire/water engine Semi-annual or as Generator and
Ambient Part of the
pumps Noise Level Direct measurement recommended by engine pumps PCO
Noise project cost
regulating authorities area
Semi-annual or as
Operation of Ambient Compressor Part of the
Noise Level Direct measurement recommended by PCO
compressor Noise area project cost
regulating authorities

68
E13N22 | Tala Properties Inc. | Sinagtala Farm Resort EPRMP | Orani, Bataan
Key Environmental Potential Annual
Parameters to be Lead
Aspects per Project Impacts Per Sampling & Measuring Plan Estimated
Monitored Person
Phase Envt’l Sector Cost
ABANDONMENT PHASE
Existing Planting of trees along Weekly or as
Part of the
ecosystem at Ecological population embankments, recommended by
Restoration At the site PCO abandonment
time of if any restoration of wetland regulating
cost
abandonment habitats authorities
Part of the
Land Volume of solid
Solid waste generation In-house monitoring Weekly At the site PCO abandonment
contamination waste
cost