PENGECEKAN KOLOM STRUKTUR

Terhadap Pinjaman 1000 dari AS (T1.2 / T1.6 / T1.12 / T1.15)


Point Titik A (Kolom Struktur) C2 Titik A (Steel Frame) C2 Point Titik (Kolom StrukturTepi Titik A (Steel Frame by Point Titik (Kolom Struktur ) C20 Titik B (Rangka Steel by Point Titik B (Rangka Steel by
Titik (Kolom Struktur ) C24
Lantai Unit Check Lantai Unit Check Luar) C5 Xinghai) C5 Lantai Unit Check Xinhai) C20 Lantai Unit Check Xinhai) C24
Design Actual Balance Design Actual Balance Design Actual Balance Design Actual Balance Design Actual Balance Design Actual Balance Design Actual Balance Design Actual Balance
Ok, if in & out > 875mm
A 875 879 4 975 979 4 A 875 877 2 975 977 2 A 875 891 16 975 991 16
B 875 871 -4 975 971 -4 B 875 873 -2 975 973 -2 B 875 893 18 975 993 18
C 875 880 5 975 980 5 C 875 871 -4 975 971 -4 C 875 892 17 975 992 17
D 875 872 -3 975 972 -3 D 875 875 0 975 975 0 13-14 Ganjil 14-15 Genap D 875 886 11 975 986 11
13-14 Ganjil 14-15 Genap
E 875 875 0 975 975 0 E 875 840 -35 975 940 -35 E 875 884 9 975 984 9
F 875 869 -6 975 969 -6 F 875 858 -17 975 958 -17 F 875 882 7 975 982 7
G 875 975 G 875 882 7 975 982 7 G
H 875 H 875
A 875 875 0 975 975 0 A 875 869 -6 975 969 -6 A 875 883 8 975 983 8
B 875 876 1 975 976 1 B 875 866 -9 975 966 -9 B 875 875 0 975 975 0
C 875 877 2 975 977 2 C 875 866 -9 975 966 -9 C 875 882 7 975 982 7
D 875 875 0 975 975 0 D 875 861 -14 975 961 -14 11-12 Ganjil D 875 876 1 975 976 1
11-12 Ganjil 12-13 Genap 12-13 Genap
E 875 877 2 975 977 2 E 875 872 -3 975 972 -3 E 875 880 5 975 980 5
F 875 876 1 975 976 1 F 875 873 -2 975 973 -2 F 875 882 7 975 982 7
G 875 876 1 975 976 1 G 875 874 -1 975 974 -1 G
H 875 H 875 h
A 875 873 -2 975 973 -2 A 875 864 -11 975 964 -11 A 875 866 -9 975 966 -9 A 875 875 0 975 975 0
B 875 880 5 975 980 5 B 875 874 -1 975 974 -1 B 875 869 -6 975 969 -6 B 875 879 4 975 979 4
C 875 872 -3 975 972 -3 C 875 865 -10 975 965 -10 C 875 853 -22 975 953 -22 C 875 880 5 975 980 5
D 875 874 -1 975 974 -1 D 875 867 -8 975 967 -8 9-10 Ganjil D 875 861 -14 975 961 -14 D 875 884 9 975 984 9
9-10 Ganjil 10-11 Genap 10-11 Genap
E 875 862 -13 975 962 -13 E 875 848 -27 975 948 -27 E 875 842 -33 975 942 -33 E 875 866 -9 975 966 -9
F 875 862 -13 975 962 -13 F 875 852 -23 975 952 -23 F 875 834 -41 975 934 -41 F 875 881 6 975 981 6
G 875 870 -5 975 970 -5 G 875 864 -11 975 964 -11 G 875 850 -25 975 950 -25 G 875
H 875 975 H H 875
A 875 870 -5 975 970 -5 A 875 A 875 876 1 975 976 1 A 875 869 -6 975 969 -6
B 875 874.5 -0.5 975 974.5 -0.5 B 875 B 875 871 -4 975 971 -4 B 875 867 -8 975 967 -8
C 875 856 -19 975 956 -19 C 875 C 875 857 -18 975 957 -18 C 875 867 -8 975 967 -8
D 875 856.5 -18.5 975 956.5 -18.5 D 875 D 875 857 -18 975 957 -18 D 875 864 -11 975 964 -11
7-8 Ganjil 8-9 Genap 7-8 Ganjil 8-9 Genap
E 875 871 -4 975 971 -4 E 875 E 875 859 -16 975 959 -16 E 875
F 875 873 -2 975 973 -2 F 875 F 875 861 -14 975 961 -14 F 875
G 875 864 -11 975 964 -11 G 875 G 875 870 -5 975 970 -5 G 875
H 875 868 -7 975 968 -7 H 875 H 875 868 -7 975 968 -7 H 875
A 875 870 -5 975 970 -5 A 875 864 -11 A 875 850 -25 975 950 -25 A 875 876 1
B 875 871 -4 975 971 -4 B 875 866 -9 B 875 851 -24 975 951 -24 B 875 876 1
C 875 860 -15 975 960 -15 C 875 869 -6 C 875 845 -30 975 945 -30 C 875 871 -4
D 875 861 -14 975 961 -14 D 875 872 -3 D 875 846 -29 975 946 -29 D 875 871 -4
5-6 Ganjil 6-7 Genap 5-6 Ganjil 6-7 Genap
E 875 882 7 975 982 7 E 875 870 -5 E 875 865 -10 975 965 -10 E 875 880 5
F 875 882 7 975 982 7 F 875 868 -7 F 875 862 -13 975 962 -13 F 875 888 13
G 875 876 1 975 976 1 G 875 867 -8 G 875 866 -9 975 966 -9 G 875 872 -3
H 875 868 -7 975 968 -7 H 875 868 -7 H 875 857 -18 975 957 H 875 877 2
- = Kolom perlu dibobok (Chipping) / baja kurang geser ke sisi kolom
+ = Kolom perlu penebalan (Difinish plaste/aci) / baja kurang geser ke sisi dalam
Baja belum terpasang