C 05 Opp Re wall to C 01 Road Formation Level Short Roa

Slope for Each Slope for Req


Sl.No Total Length Chainage
Meter Level
1 2 3 4 5
C 05 Opp Re wall 106.000
C 01 107.600
Difference 1.600
Total Length 58.000
Slope or Gradient 36.250
Slope for Each Meter 0.028

1 0 0.028 0.00

2 5 0.028 0.14
3 10 0.028 0.28
4 15 0.028 0.41
5 20 0.028 0.55
6 25 0.028 0.69
58
7 30 0.028 0.83
8 35 0.028 0.97
9 40 0.028 1.10
10 45 0.028 1.24
11 50 0.028 1.38
12 55 0.028 1.52
13 58 0.028 1.60
tion Level Short Road No
RFL @C 05 Opp Road Formation
Remarks
Re wall at Req Level
6 7 8

Short Road No
Road Formation Level
Chainage RFL
C 05 Opp Re
106.00 106.00 0 106.00
wall
106.00 106.14 5 106.14
106.00 106.28 10 106.28
106.00 106.41 15 106.41
106.00 106.55 20 106.55
106.00 106.69 25 106.69
106.00 106.83 30 106.83
106.00 106.97 35 106.97
106.00 107.10 40 107.10
106.00 107.24 45 107.24
106.00 107.38 50 107.38
106.00 107.52 55 107.52
106.00 107.60 60 107.60
Short Road No Short Road No
Road Formation Level Sub Base Level
Formula Chainage SBL Formula

0,106 0 105.83 0,105.83

5,106.14 5 105.97 5,105.97


10,106.28 10 106.11 10,106.11
15,106.41 15 106.24 15,106.24
20,106.55 20 106.38 20,106.38
25,106.69 25 106.52 25,106.52
30,106.83 30 106.66 30,106.66
35,106.97 35 106.80 35,106.8
40,107.1 40 106.93 40,106.93
45,107.24 45 107.07 45,107.07
50,107.38 50 107.21 50,107.21
55,107.52 55 107.35 55,107.35
60,107.6 60 107.43 60,107.43