FND COMMENTS:

1- CONTRACTOR TO ENSURE THAT PVC CONDUITS ARE USED FOR


E
CONCEALED CONDUITING AND EXTRA LIGHT GI/EMT CONDUIT
IS USED FOR SURFACE CONDUITING (NOTED)
S

CONTRACTOR TO ENSURE
THAT THERE ARE NO
CLASHES OF MEP
W
SERVICES AT THIS
LEVEL(NOTED) ISSUED FOR CONSTRUCTION

KEY PLAN

SEC.
10
09

08
07
06
05
04

03
02
01

B-B
IDF

UP
FACP

TRACK
FACP
UP

UP

TO MAIN ROAD

TO MAIN
ROAD

TRACK 2.4M WIDE


SEC.
A-A

TRACK
LAYOUT PLAN

NOTE:

LEGEND

DESCRIPTION SYMBOLS
LCD
FACP

FACP

JOB STATUS:

SHOP DRAWING
CONSULTANT / CLIENT APPROVAL STATUS:
A Approved
B Approved as noted
C Revised and Resubmit
D Disapproved

REVISION STATUS: ISSUED FOR APPROVAL


Rev. Date. Remarks.
01 17-02-2024 FOR APPROVAL
02 21-02-2024 FOR APPROVAL

STRUCTURAL ENGINEERS:

MEP CONSULTANT:

FAHIM, NANJI & DESOUZA (PVT.) LTD.


Consulting Engineers
HVAC, Plumbing, Mechanical & Electrical

FND 10, ILACO House, State Life Building-5, Abdullah Haroon Road,
Karachi-74400 Pakistan.
Ph: +9221 3563 7878 - 82
Email: mech.dpt@fnd.com.pk
web site: www.fnd.com.pk

MEP CONTRACTOR :
MEP SOLUTIONS (PVT) LTD.
MEP Solutions OFFICE # 104 J BLOCK. JOHAR TOWN, LAHORE.
Tel: +92-42-(111-637-111), FAX # : +92-42-35220549
Beyond Engineering. . . . .
Email: INFO@MEP-SOLUTIONS.COM
Web Site: HTTP://MEP-SOLUTIONS.COM

PROJECT:

IRIS-DIC PAKISTAN, KASUR


CLIENT:

DIC PAKISTAN LIMITED


Drawing Title:
FG AND RM STORE
(LEVEL+ 0.45M) FIRE ALARM
AND CCTV SYSTEM LAYOUT
Drawn By:
AKHTAR ALI
Checked By:
NOMAN ALI
Approved By:
M. JUNAID SIDDIQUI
Date: Rev No. :
21-02-2024 02
Scale:
1 = 150 (A1)
Project Ref.
FND-1796-FR-E-48-00-200-00
Drawing Number:
MEPs-ELECT-ELV-B4&7-0002(SH 1-1)