Step 2: Ensure that both switches are running the same software version
system view
[H3C]display version
reset saved-configuration
reboot
Step 4: Assign a unit number to each S5800. Switch 1 or 2. (Later you will see the unit number on the
On unit 1:
or loss. Continue?[Y/N]:y
On unit 2:
or loss. Continue?[Y/N]:y
[H3C]quit
save irf.cfg
On unit 1:
switches)
On Unit 1:
[H3C-Ten-GigabitEthernet1/0/25]shutdown
[H3C-Ten-GigabitEthernet1/0/26]shutdown
[H3C-Ten-GigabitEthernet2/0/27]shutdown
[H3C-Ten-GigabitEthernet2/0/28]shutdown
On Unit 1:
[H3C]irf-port 1/1
[H3C-irf-port]quit
On Unit 2:
[H3C]irf-port 2/2
[H3C-irf-port]quit
Step 9: Enable the 10 Gbps ports that will form the IRF (on both
switches)
On unit 1:[H3C]int TenGigabitEthernet 1/0/25
[H3C-Ten-GigabitEthernet1/0/25]undo shutdown
[H3C-Ten-GigabitEthernet1/0/26]undo shutdown
[H3C-Ten-GigabitEthernet2/0/25]undo shutdown
[H3C-Ten-GigabitEthernet2/0/26]undo shutdown
Step 10: Activate the IRF Port Configuration (on both switches)
[H3C]irf-port-configuration active
[H3C]quit
save
Step 12: Connect the 2 10GbE Direct Attach Cables (DACs) as Shown in the IRF Diagram
Step 13: The IRF stack should now be formed. Verify IRF operation
[H3C]display irf
[H3C]quit
save