Ms-Dd-A3000-Str-Pln-0003 - Rev0 - 02-INSPECTION TEST PROCEDURE AND INSPECTION TEST PLAN (ITP)
Ms-Dd-A3000-Str-Pln-0003 - Rev0 - 02-INSPECTION TEST PROCEDURE AND INSPECTION TEST PLAN (ITP)
Ms-Dd-A3000-Str-Pln-0003 - Rev0 - 02-INSPECTION TEST PROCEDURE AND INSPECTION TEST PLAN (ITP)
Apr. 13 '22
PURCHASER'S PERMISSION TO PROCEED OR REVIEW TAKEN ON VENDOR PRINTS SHALL NOT RELIEVE VENDOR FROM ITS
RESPONSIBILITIES OR LIABILITIES UNDER PURCHASE ORDER.
REVISION HISTORY
APPROVAL
Description /
Rev
Date Reason for Prepared Reviewed Approved
No
Issue
by by by
Page 1 of 9
INSPECTION TEST PROCEDURE AND
INSPECTION TEST PLAN (ITP) FOR
FABRICATION AND PAINTING
Project Name: MANYAR SMELTER PROJECT Ref. No. PR-2022-01-QC0002
Rev. 0 Date: 15.03.2022
TABLE OF CONTENTS
1.0 Purpose .............................................................................................................................................................. 3
2.0 Scope ................................................................................................................................................................. 3
3.0 Terms and Definitions ........................................................................................................................................ 3
4.0 Responsibilities................................................................................................................................................... 3
4.1 Head of QHSE Department ................................................................................................................................ 3
4.2 QC Engineer ....................................................................................................................................................... 3
4.3 Material Controller .............................................................................................................................................. 3
4.4 Welding Inspector ............................................................................................................................................... 3
4.5 Painting Inspector ............................................................................................................................................... 4
5.0 Procedure ........................................................................................................................................................... 4
5.1 Inspection and Test Plans (I.T.P) ....................................................................................................................... 4
5.2 Receipt Inspection .............................................................................................................................................. 4
5.3 In- Process Inspection and Testing (Fabrication) ............................................................................................... 5
5.4 In- Process Inspection and Testing (Cleaning and Painting) ............................................................................. 6
5.5 QC Inspections ................................................................................................................................................... 6
5.6 Non-destructive Examination ............................................................................................................................. 6
5.7 Final Inspection .................................................................................................................................................. 7
6.0 Inspection Test Plan for Fabrication and Painting ............................................................................................. 7
7.0 Inspection Report Formats................................................................................................................................. 7
Page 2 of 9
INSPECTION TEST PROCEDURE AND
INSPECTION TEST PLAN (ITP) FOR
FABRICATION AND PAINTING
Project Name: MANYAR SMELTER PROJECT Ref. No. PR-2022-01-QC0002
Rev. 0 Date: 15.03.2022
1.0 Purpose
The purpose of this procedure is to identify the steps to be taken to provide objective evidence
of compliance with the required quality level through inspection and testing to the applicable
standards and specifications at various stages of fabrication.
2.0 Scope
This procedure identifies the responsibility for, the stages at which and the reporting
requirements for, all Inspection and testing activities undertaken by ASSENT during fabrication
to verify compliance with stated quality requirements in Manyar Smelter Project
3.0 Terms and Definitions
QC Quality Control
QA Quality Assurance
4.0 Responsibilities
Page 4 of 9
INSPECTION TEST PROCEDURE AND
INSPECTION TEST PLAN (ITP) FOR
FABRICATION AND PAINTING
Project Name: MANYAR SMELTER PROJECT Ref. No. PR-2022-01-QC0002
Rev. 0 Date: 15.03.2022
a) Any goods found not to be in conformance with the contract requirements shall be quarantined.
The Material Controller shall inform the QC Engineer and the material shall be actioned in
accordance with procedure for Control of nonconformity.
b) Any material released for urgent production purposes prior to verification shall be positively
identified.
c) The completed Purchase Requisition and Receipt Inspection form and all relevant certifications
shall be returned to the Material Controller who shall maintain the Purchase Requisition and
Receipt Inspection file.
d) Copies of Purchase Requisition and Receipt Inspection Reports for rejected items shall be forward
to the QC Engineer for further action.
e) All original certifications shall be forwarded to the QC Engineer who shall maintain the material
certification files.
NOTE
The Materials Controller may, if deemed necessary, maintain a copy of material certification but
this is discretionary and for information only.
5.3 In- Process Inspection and Testing (Fabrication)
a) Receive main steel (sections/plates) from the Sizing Area as per feeding programs. Allocate work
areas and work on shop floor for fabrication.
b) Identify fed pieces with respect to the contract reference, drawing number and erection and steel
mark marked on it.
c) Fabricate item as per approved drawing and welding shall follow the approved drawings and
general note instructions.
d) All the fit-up inspection shall be done as per the approved Inspection Test Plan by authorized
inspectors. Proceed the work depend on inspection results.
e) Dimensional controls by qualified inspector.
f) For each contract the Production Engineer shall issue to the Workshop Supervisor all the relevant
Drawings, Cutting Schedules, and Fabrication Check lists.
g) Fabrication shall be carried out in accordance with ASSENT’s Process Control Procedure.
h) Material Identification and Traceability shall be maintained if required.
i) After fitting the Dimensional Inspector shall check the dimensional accuracy of the fabricated items
against the relevant drawings.
j) Perform Dimensional inspection on 100%.
k) Welding shall be executed in accordance with ASSENT’s Welding Management Procedure and
approved weld procedures
l) The Welding Inspector shall inspect all completed items to ensure that the welding is of the
relevant standard as stated in the I.T.P.
m) Visual examination shall be in accordance with the Procedure and relevant standard as detailed in
the Fabrication I.T.Ps.
n) All Fabrication inspections shall be recorded on Inspection Report and filed with the QC Engineer.
o) Dimension shall be in accordance with the procedure.
Page 6 of 9
INSPECTION TEST PROCEDURE AND
INSPECTION TEST PLAN (ITP) FOR
FABRICATION AND PAINTING
Project Name: MANYAR SMELTER PROJECT Ref. No. PR-2022-01-QC0002
Rev. 0 Date: 15.03.2022
Page 7 of 9
INSPECTION TEST PROCEDURE AND
INSPECTION TEST PLAN (ITP) FOR
FABRICATION AND PAINTING
Project Name: MANYAR SMELTER PROJECT Ref. No. PR-2022-01-QC0002
Rev. 0 Date: 15.03.2022
6.0
INSPECTION TEST PLAN FOR FABRICATION AND PAINTING
Page 8 of 9
INSPECTION AND TEST PLAN (ITP)
Document No.: PR-2022-01-QC0002
MANYAR SMELTER PROJECT Activity: STRUCTURAL STEEL FABRICATION & PAINTING
Revision: 0
Date: 15.03.2022
Page: 1 of 11
Inspection Level: III Critical Rating:
Activity
(Description of Medium
Sl. Reference Characteristics Verifying Inspection/Testing Authority
activity/ operation Acceptance Criteria Frequency
No. Document to be verified Documents
requiring inspection/ Contractor/ Owner /
3rd party
testing) ASSENT (Testing Remarks
3rd party 3rd party
agency)
1 PRELIMINARY ACTIVITIES
Application of ISO
MS-DD-3000- 9001 : 2015 clauses ISO 9001 : 2015 , MS-
MS-DD-A3000-
1.1 Project Quality Plan STR-REQ- Project DD-3000-STR-REQ- Once P R R -
STR-PLN-0002
0001_revN2 Organization chart 0001_revN2
MS-DD-3000- 1. Welding
Welding Procedure STR-REQ- procedures
Specification and 0001_revN2, Approved shop MS-DD-A3000-
1.4 Procedure qualification Once P R R -
MS-DD-3000- 2. Raw material drawings and AWS D1.1 STR-PRO-0004
e STR-SPE-0001
records
Rev1 3. Consumables
INSPECTION AND TEST PLAN (ITP)
Document No.: PR-2022-01-QC0002
MANYAR SMELTER PROJECT Activity: STRUCTURAL STEEL FABRICATION & PAINTING
Revision: 0
Date: 15.03.2022
Page: 2 of 11
Inspection Level: III Critical Rating:
Activity
(Description of Medium
Sl. Reference Characteristics Verifying Inspection/Testing Authority
activity/ operation Acceptance Criteria Frequency
No. Document to be verified Documents
requiring inspection/ Contractor/ Owner /
3rd party
testing) ASSENT (Testing Remarks
3rd party 3rd party
agency)
MS-DD-3000-
STR-REQ-
Welder Qualification 0001_revN2, Welder Qualification MS-DD-A3000-
1.5 AWS D 1.1: 2020 Once P R R -
records MS-DD-3000- Certificate STR-PRO-0005
STR-SPE-0001
Rev1
Project Spec-
1.Operator qualification
NDT procedures & NDE MS-DD-3000-
as per ASNT-TC-1A MS-DD-A3000-
1.6 Operator Qualification STR-SPE-0001 ASNT-TC-1A Once R R R P
Level II STR-PRO-0010
records REV-1 Clause-
2.NDE procedures
13.9
MS-DD-3000-
1.Material selection
STR-REQ-
2.Coating specification
0001_revN2, MS-DD-A3000-
1.7 Painting Procedure 3.Inspections SSPC standards Once P R R -
MS-DD-3000- STR-PRO-0009
4.Testing
MEC-SPE-
5.Application methods
0801_rev0
MS-DD-3000-
1.ICV process
LOG-INS- Project specific
Packing and delivery 2.IRN Process MS-DD-A3000-
1.8 0001, MS- requirements Once P R R -
Procedure 3.Bundling methods STR-PRO-0011
DD-3000- IRN process.
4.RFID
LOG-INS-0002
Code A / Code B
MS-DD-3000- approval of Inspection
Pre-inspection meeting and test plan, Pre-Inspection
1.9 QUA-PRO- - Once P Y Y -
(PIM) Fabrication Procedure, Meeting (PIM)-
0002_rev E,
Welding procedure, Notification
NDE procedures
INSPECTION AND TEST PLAN (ITP)
Document No.: PR-2022-01-QC0002
MANYAR SMELTER PROJECT Activity: STRUCTURAL STEEL FABRICATION & PAINTING
Revision: 0
Date: 15.03.2022
Page: 3 of 11
Inspection Level: III Critical Rating:
Activity
(Description of Medium
Sl. Reference Characteristics Verifying Inspection/Testing Authority
activity/ operation Acceptance Criteria Frequency
No. Document to be verified Documents
requiring inspection/ Contractor/ Owner /
3rd party
testing) ASSENT (Testing Remarks
3rd party 3rd party
agency)
SS- MS-DD-
Visual Inspection
3000-STR-
Dimensional check ASTM A1011M or JIS Inspection
2.4 Gratings SPE-0001 100% H R R -
Galvanizing results G3101 reports
Rev1 – Clause
Report review
8 & 12
INSPECTION AND TEST PLAN (ITP)
Document No.: PR-2022-01-QC0002
MANYAR SMELTER PROJECT Activity: STRUCTURAL STEEL FABRICATION & PAINTING
Revision: 0
Date: 15.03.2022
Page: 4 of 11
Inspection Level: III Critical Rating:
Activity
(Description of Medium
Sl. Reference Characteristics Verifying Inspection/Testing Authority
activity/ operation Acceptance Criteria Frequency
No. Document to be verified Documents
requiring inspection/ Contractor/ Owner /
3rd party
testing) ASSENT (Testing Remarks
3rd party 3rd party
agency)
3 DIMENSION INSPECTION
4 WELDING INSPECTION
MS-DD-3000-
Verification of weld size Visual and Final
STR-SPE-0001
Visual examination of Surface defects by AWS D1.1 Dimensional
4.2 Rev1 – Clause 100% H (W) R -
completed weld joints Qualified welding Table 8.1 Inspection
13.7.1, 13.7.2,
inspectors Report
13.8 & 13.8.4,
INSPECTION AND TEST PLAN (ITP)
Document No.: PR-2022-01-QC0002
MANYAR SMELTER PROJECT Activity: STRUCTURAL STEEL FABRICATION & PAINTING
Revision: 0
Date: 15.03.2022
Page: 5 of 11
Inspection Level: III Critical Rating:
Activity
(Description of Medium
Sl. Reference Characteristics Verifying Inspection/Testing Authority
activity/ operation Acceptance Criteria Frequency
No. Document to be verified Documents
requiring inspection/ Contractor/ Owner /
3rd party
testing) ASSENT (Testing Remarks
3rd party 3rd party
agency)
Primary
MS-DD-3000- Surface imperfections Member-
Non-Destructive Test –
STR-SPE-0001 verified by qualified 5%
Magnetic Particle test for
Rev1 – Clause technicians AWS D 1.1: 2020
4.3 fillet welds (After a NDT Report (W) (W) R H .
-13.9 ASNT Level II & ASTM E709
minimum 24 hours has Secondary:
Approv. NDE qualification of
completion of welding) NA
procedures technicians
Project Spec-
100% MT
MS-DD-3000-
Testing agency shall be for Fillet
STR-SPE-0001
approved Approved WPS and and 100%
4.6 Weld Repair Rev1 – Clause NDT Report (W) (W) R H
Technicians shall be AWS D1.1: 2020 MT and UT
-13.9
ASNT Level II qualified. for butt
Approved
welds
WPS
INSPECTION AND TEST PLAN (ITP)
Document No.: PR-2022-01-QC0002
MANYAR SMELTER PROJECT Activity: STRUCTURAL STEEL FABRICATION & PAINTING
Revision: 0
Date: 15.03.2022
Page: 6 of 11
Inspection Level: III Critical Rating:
Activity
(Description of Medium
Sl. Reference Characteristics Verifying Inspection/Testing Authority
activity/ operation Acceptance Criteria Frequency
No. Document to be verified Documents
requiring inspection/ Contractor/ Owner /
3rd party
testing) ASSENT (Testing Remarks
3rd party 3rd party
agency)
Subassembly (Survey Approved Survey of the AWS D1.1: 2020, AISC Based on all sub-assemblies
5.2 Total Station inspection drawings and coordinates of welded 303 and Specification the Survey Reports H R R - to be verify by
required) datum points structures tolerances Complexity licensed surveyor
At least
once
before
MS-DD-3000-
surface
6.2 Compressed Air Quality MEC-SPE- Visual / Blotter test ASTEM D4285 - H - - -
preparatio
0801_rev0
n & paint
application
work.
Random Sampling:
Min.1 spot/once per ISO 8502-6 & 9
MS-DD-3000- Once in
100m2 Salt inspection
6.4 Salt Contaminants MEC-SPE- every lot/ H (W) R -
Method: Bresle Patch Average 30mg/m2, report
0801_rev0 batch
test / Salt Maximum 40mg/m2
contamination meter.
ISO 8502-3
MS-DD-3000- Spot checks
Dust inspection
6.5 Surface Dust MEC-SPE- 1 Per shift H (W) R -
Rating 2 or better report
0801_rev0 Method: Dust tape Test.
Final appearance
Packing list
7.1 Packing inspection Verification against the Final product shall be 100% Packing list H (W) R -
MS-DD-3000-PRO-0008 packing list free of any damages
Vendor's Preservation Checklist
MS-DD-3000-
Final product shall be
Pre-Shipment Inspection LOG-INS-0001
free from any damages
(Visual/ packing list/ RevN1, MS- Packing and delivery
7.2 and marking to be 100% Packing List H (W) R -
packing and marking DD-3000- procedure
visible
check) LOG-INS-0002
RFID
Rev N1
Vendor shall ensure
that materials/ ICN shall be
Project Spec-
equipment is fully in forwarded to
MS-DD-3000-
compliance with Contractor along
STR-SPE-0001
Inspection Completion Purchase Order MS-DD-3000-QUA-PRO- ICN & Quality with quality
7.3 Rev1, MS-DD- Each item H H R -
Notice (ICN) submission conditions and are 0001 Rev. E Documents records, reports,
3000-QUA-
without any deficient or and certificates
PRO-0001
incomplete works for Contractor’s
Rev. E
before release for review.
shipping.
Contractor will
Inspection Release Notice Project Spec- All inspection items MS-DD-3000-QUA-PRO- ICN & Quality
7.4 Each item H H R - return ICN to
(IRN) MS-DD-3000- have been successfully 0001 Rev. E Documents Vendor as
INSPECTION AND TEST PLAN (ITP)
Document No.: PR-2022-01-QC0002
MANYAR SMELTER PROJECT Activity: STRUCTURAL STEEL FABRICATION & PAINTING
Revision: 0
Date: 15.03.2022
Page: 10 of 11
Inspection Level: III Critical Rating:
Activity
(Description of Medium
Sl. Reference Characteristics Verifying Inspection/Testing Authority
activity/ operation Acceptance Criteria Frequency
No. Document to be verified Documents
requiring inspection/ Contractor/ Owner /
3rd party
testing) ASSENT (Testing Remarks
3rd party 3rd party
agency)
STR-SPE-0001 completed. Contractor’s
Rev1, MS-DD- - All nonconformity Inspection Release
3000-QUA- items and punches*2) Notice (IRN). Upon
receipt of IRN from
PRO-0001 are closed out.
Contractor, Vendor
Rev. E - All quality records to may then proceed
be submitted to with shipping
Contractor are preparation of
available. materials/
equipment.
MS-DD-3000-
PJC-PRO-0901
As Built drawing Modification to be Final as built Final as built
7.6 -As built all P R R -
submission verify drawings drawings
documentatio
n procedure
Project Spec-
MS-DD-3000-
STR-SPE-0001
Manufacturer Data MS-DD-3000-QUA-PRO- Approved
7.7 Rev1, MS-DD- As per MDR Index MDR H R R -
Records (MDR) 0001 Rev. E MRB Index
3000-QUA-
PRO-0001
Rev. E
INSPECTION AND TEST PLAN (ITP)
Document No.: PR-2022-01-QC0002
MANYAR SMELTER PROJECT Activity: STRUCTURAL STEEL FABRICATION & PAINTING
Revision: 0
Date: 15.03.2022
Page: 11 of 11
Inspection Level: III Critical Rating:
Activity
(Description of Medium
Sl. Reference Characteristics Verifying Inspection/Testing Authority
activity/ operation Acceptance Criteria Frequency
No. Document to be verified Documents
requiring inspection/ Contractor/ Owner /
3rd party
testing) ASSENT (Testing Remarks
3rd party 3rd party
agency)
Legends:
7.0
INSPECTION REPORT FORMATS
Page 9 of 9
DIMENSIONAL AND WELD VISUAL INSPECTION REPORT
REPORT No.:-
CONTRACTOR:- Chiyoda Corporation
PROJECT:- MANYAR SMELTER PROJECT DATE:-
PROJECT No.:- PR-2022-01 SHEET No.:-
NDE
DIMENSION WELD VISUAL INSPECTION
SR. No. STRUCTURE ID MARK No. DRG No. REV QTY EXAMINAT REMARKS
CHECK TYPE OF
WPS No. WELDER ID VISUAL MPI UT
JOINT
LEGEND :- F - FILLET WELD, B - BUTT WELD, PPBW - PARTIAL PENETRATION BUTT WELD, S/D - SAW AND DRILLONLY, LPS - LOOSE PLATE, MPI - MAGNETIC PARTICAL
INSPECTION, UT - ULTRASONIC TESTING & N/A - NOT APPLICABLE
NOTE: ALL DIMENSIONS ARE IN MM, INSPECTED AND FOUND WITHIN TOLERANCE & REFER ATTACHED DRAWINGS
RELEASE AUTHORISED BY :- CONTRACTOR: CLIENT/ Consultant :-
NAME :- NAME :- NAME :-
Form No. ASSENT-QMS-P10,F01 Rev-01 Add a format for dimensional inspection records to fill in dimensional
inspection positions with sketch and tolerances.
INCOMING MATERIAL RECEIVING REPORT
AL SHAFAR STEEL ENGINEERING LLC ASSENT REPORT NO :-
TOTAL WT 0.000
CHECKED BY: REVIEWED BY: REVIEWED BY:
NAME ………………………………………… NAME………………………………………… NAME…………………………………………
SIGN ………………………….……………… SIGN ………………………………………… SIGN …………………………………………
DATE ………………………………………… DATE………………………………………… DATE…………………………………………
FORM NO.:- ASSENT-QMS-P08, F01 REV-01
PROJECT NO : PR-2022-01
PROJECT NAME : MANYAR SMELTER PROJECT
CLIENT : Chiyoda Corporation
PAINTING INSPECTION REPORT PAGE : 1 OF 2
DATE :
REPORT NO. :
1.AMBIENT CONDITION
DATE :
TIME :
R/H %
S.T ˚C
AIR TEMP ˚C
DEW POINT ˚C
2.SURFACE PREPARATION METHOD :
STANDARD SURFACE PROFILE (Microns) TYPE OF ABRASIVE Testex Replica Tape (Press - O - Film)
ISO-8501-1
ASSENT QC CLIENT
NAME : NAME :
SIGNATURE : SIGNATURE :
Legends: RH-Relative Humidity , ST-Steel Temperature , DFT-Dry Film Thickness, SPEC REQ - Specification Required. Form # ASSENT-QMS-P15-F02 Rev 01(01-06-2020)
PAINTING INSPECTION REPORT
REPORT NO. :
PROJECT: - MANYAR SMELTER PROJECT DATE:-
JOB NO.:- PR-2022-01 PAGE:- 2 OF 2
PAINT PAINT PAINT
SR No. ERECTION MARK SYSTEM QTY SR No. ERECTION MARK SYSTEM QTY SR No. ERECTION MARK SYSTEM QTY
NAME : NAME :
SIGNATURE : SIGNATURE :