RA of Tanks Activity - F
RA of Tanks Activity - F
TRANSMITTAL No:
TTI-CCI-028
DELIEVERED RECEIVED
REV.
DATE:
NO
REASON FOR REVISION
16/01/24 TTI CCI
RA of Unloading & installation of syrup tanks
Residual
Task / Activity
Risk Rating
(0,1,2,3,4,5)
(0,1,2,3,4,5)
Risk
Probability
Severity
S/No.
Rating Final
Task Steps Potential Hazards Effect Control Measures Proposed (After Assessment
Controls
in place)
1 Planning of activity Incompetent Personal injury Each worker will have a:
(Unloading & workforce Occupational Site induction
installation of syrup Fatigue illness TBT / Task briefing will be conducted before
tanks) Inadequate Property damage starting activity covering the task and hazard
4 3 H Low Acceptable
supervision prevention controls measures, in the language of
the work force, acknowledged and documented
Provision of rest breaks
Adequate supervision will be provided
2 Preparation of Unauthorized Personal injury PTW will be obtained before starting the job
activity area activity Property damage (LOTO must be apply if required and signed on
(Unloading & (Without PTW) PTW by Technician).
installation of syrup Slips, trips, falls
Inspect site and clear area of any obstructing
tanks) Other workers in material or debris.
the vicinity Area to be cordon of below the appropriate
safety signage or barrication.
5 3 H Low Acceptable
Identify all electrical lines in work area.
All equipment’s and cords testing and tagged
before usage at site.
3 Material Shifting Improper Accident Use proper loading / offloading techniques Low Acceptable
loading/off Personal injury TBT will be conducted before starting the activity
loading Entanglement Ensure appropriate communication is maintained
Bad storage & between the pipes between workers and supervisor
stacking of pipes / Back pain, sprain / Use proper manual handling techniques
materials injury 5 4 H Loose material will not be placed height and must
Slip, trip, fall Damage to be removed immediately.
Pipe loading/off equipment or
loading property loss
Falling objects due
to mishandling
Page 2 of 5
RA of Unloading & installation of syrup tanks
4 Shifting & Lifting • Traffic accidents • Personal injury • Ensure all vehicles / machinery are
of syrup tanks • Falling objects due • Property damage inspected & have their inspections
by using mobile to mishandling / to plant facilities before activity ( third party certificates
cranes / lifters / improper rigging • oil for cranes / lifters)
trailers practices spillage. • Adhere to speed limit 20 Km.
• Crane failure • Use appropriate lifting gears after
•Falling of lifting inspections
gears, shackle • Lifting area to be properly barricaded
•collapse 5 4 H Low Acceptable
• Tagline to be used to maintain
adequate control of load
• Ensure appropriate communication is
maintained between crane operator
and the signal man.
• Strictly no lifting should be done if the
visibility is poor specially after sun set.
• Lifting activity shall be stopped in case
of heavy wind speed.
• The riggers are the only people
permitted to release the load.
• Load is only to be released when
adequately fixed and supported.
5 Work at height. Falling of Personal Injury Tool Box talk /Task Briefing to be conducted Low Acceptable
personnel and Property Damage before starting activity.
materials. Fatality Workers wear full body harnesses and lifeline as
required.
5 5 H Only deploy suitable and medically fit personnel
who have worked at heights before.
Access and egress shall not be obstructed.
Page 3 of 5
RA of Unloading & installation of syrup tanks
Electrocution Accident/ Incident All workers wear the appropriate PPE as per their Low Acceptable
6 Hot work Improper use of Electric shock, work activity.
Power tools. Short Circuiting, Good housekeeping standard
Inadequate Fire Protective Clothing Provision of ELCB in
Supervision electrical circuits.
Plenty of fresh drinking water, Adequate Rest
breaks (including lunch breaks)
Specific Training, PPEs such as leather welding
gloves.
5 4 H TBT will be conducted on a daily basis and all
unwanted, unattended material will be removed
from the site loose materials will not place on
height.
Page 4 of 5
RA of Unloading & installation of syrup tanks
Risk Matrix
Chart KEY
3 Moderate
2 Unlikely
Y
1 Rare
0 1 2 3 4 5
Negligible Slight Moderate High Very High
SEVERITY
Page 5 of 5