GAS TRANSFER PIPELINE FROM SUC TO LUC/GAS
10+000
5+000
6+000
7+000
8+000
9+000
LUC/GAS
ELEVATION
METRESABOVE M.SL
C:\Users\Dell\Desktop\IRAQ MAP\WSCCAY9J4N9CA5TMO0QCA7QVDH4CAYJUWEOCAFQEX2FCAIBHMDLCAKLN6BFCAEUECSCCASOQEPBCA3CFYXYCA2K32FLCAHAVDCWCAGS9SD1CAUHHG1XCA5XGZ5GCAQM398RCAUVCLGRCA2M5QB1CAOF3Q1X.jpg
50
40
30
20
KILOMETRES
SUBA AND LUHAIS OIL FIELDS
SURVEY REFERENCE ( EXISTING MARKER )
10+000
5+000
5+056
5+181
5+306
5+431
5+556
5+681
5+806
5+931
6+056
6+181
6+306
6+431
6+556
6+681
6+806
6+931
7+056
7+181
7+306
7+431
7+556
7+681
7+806
7+931
8+056
8+181
8+306
8+431
8+531
8+681
8+806
8+931
9+056
9+181
9+306
9+431
9+556
9+681
9+806
9+931
PROGRESSIVE DISTANCES REFERRED TO PIPLINE
STARTING POINT AT
35.19
35.29
35.52
35.70
35.97
36.11
36.27
36.45
36.73
36.94
37.21
37.60
37.89
38.12
38.24
38.44
38.78
39.13
39.47
39.81
40.11
40.33
40.47
40.88
41.13
41.36
41.78
42.10
42.39
42.85
43.35
43.56
43.99
44.41
44.74
45.10
45.47
45.70
45.96
46.03
GROUND ELEVATIONS
SOIL NATURE POORLY GRADED SAND WITH SILT AND WITH SALTS
GROUND FEATURE DESERT AREA
PIPE LINE DIA ( ) X THICKNESS mm LENGTH M
CATHODIC PROTECTION
ANCILLARY WORKS
LEGEND SOC
CLIENT:.........................
NOTE
SL 01 SL 02 SL 03 SL 04 SL 05 SUBA AND LUHAIS OIL FIELDS
PROJECT :...........................................
PIPELINE MARKER
- ALL COORDINATES WAS TAKEN BY WGS 84 CATHODIC PROTECTION TEST POINT SEE TEST POINTS SCHEDULE ( -EK-) BASSRA
BAGHDAD IRAQ SITE :..................................
CATHODIC PROTECTION STATION SEE CATHODIC PROTECTION KEY DIAGRAM ( - EK - )
- MINIMUM DISTANCE BETWEEN ELECTRIC LINE AND PIPELINE IS 15M LEAN CNOCRETE WEIGHTING
SCOP STATE COMPANY FOR OIL PROJECTS
PROPOSED P/L SL 06
DOCUMENT TITLE :
O/G P/L ROUTE MAP AND PROFILE FOR ELECTRIC LINE/1 (33kV)
ERTH ROAD FROM SUC TO LUC/GAS FROM DIST. KM 5+000 TO KM 10+000
PAVED ROAD , WIDTH 7.0 M 7.0 M
ELECT.LINE DRAWN ENG. THIA ENG. ARRAF SCALE H:1/ 10 000
1000
DATE: FEB, 2011
KM SURVEYED
V:1/
CANAL ENG. HADI ENG. OMER
PROJECT No. 2084
CHECKED DR.MAHDI
APPROVED DRW. No. 00-00-10- SL 02