Daily Instructions

You might also like

Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 2

1.

General recommendation and procedure


a. M/U & RIH ESP
i. ESP Installation (Max acceptable OD 5.9")
ii. HPJM with all personnel involved. Discuss well control procedure while ESP M/U and ESP Tripping
iii. Provide schematic to Zfod and FIC
iv. Measure all ESP dimensions
v. Check availability of Splice across PKR
vi. Check all handling Equip. certification
vii. Provide all required tools on rig floor in case of kick.
viii. Perform Drill after hang cable sheave to the derrick
ix. Don’t raise wooden box of CCCP on rig floor.
x. Check the Max. OD of ESP before RIH (FIC and CM to be on rig floor)
xi. Watch for ESP cable while set the slips & pull cable away by ESP crew
xii. Check Commission time and provide MTU
xiii. No one from rig team touch the power tong (Only TRS Team).
xiv. ESP team representative to be on the rig floor all time to observe RIH ESP operation.
xv. Use Tbg Protector Pin & Box while P/U Tbg
xvi. ** TIW to be installed above PKR & TRSV while M/U time
xvii. ** Don’t move the string till ESP representative on rig floor
xviii. ** Don’t RIH in the BOP with PKR till confirm that ESP cable already cut & splice to lower part (Confirm with FIC before RIH)
xix. A hole cover must be used at all times to prevent dropped objects falling into the well
xx. All joint that M/U directly to completion assembles, should be M/U pipe wrench and use JAM, never start directly with Power tong
b. Completion Eng.
i. Prepare final well schematic and check all OD, ID & length for all string assemblies
ii. Prepare final tally and confirm only required tubing on racks, mark Tbg at ESP PKR & TRSV
iii. Check and confirm availability of all required fitting
iv. Provide all tool data and certification
v. Confirm all tools has been drifted
vi. Apply pressure in ALL CLs as integrity while RIH
vii. All required fitting to be on location otherwise ask Zfod to provide fitting
viii. Comp. to provide list of all required handling tools, slips, pup joint , XO…..
ix. Confirm PKR Shear Value
x. Check PKR range and compatibility with casing Wt.
xi. Check the availability ESP packer splice with all accessories
xii. TIW to be installed above PKR & TRSV while M/U time
xiii. Function test and pressure test for AGV and TRSV with measuring of return are required
xiv. Confirm availability of CL bands in case no cable use
xv. Completion engineer to check return from TRSV & AGV before and after landing (Vol should be same)
xvi. All joint that M/U directly to completion assembles, should be M/U pipe wrench and use JAM, never start directly with Power tong`
c. TRS to follow global procedure while RIH
i. Whenever complete R/U perform function test for JAM unit with Pup joint (Never start directly with the string joint)
ii. Check elevator load capacity / Whenever String Wt reach to 60 ton call WSL (Elevator capacity is 75 ton)
iii. Use Safety clamp till get sufficient wait ( at least first 20 Jts)
iv. All joint that M/U directly to completion assembles, should be M/U pipe wrench and use JAM, never start directly with Power tong
v. TRS Supv. to provide Min, Max & Opt torq for Tbg 3 ½” TSH-Blue 9.2# L-80 tubing and confirm value with FIC/Zfod
vi. Drift all Joint, & P.Jt X.Os & Assy before RIH // T.Hgr with X-O below
vii. TRS Supv. to monitor Tbg cleaning and check before P/U to the floor.
viii. Use API Dope on Pin side of Tbg
ix. Use Stabbing Guide during M/U
x. No Low or Hi shoulder chart are acceptable
xi. TRS team in completely responsible about the tally and count Tbg that RIH or POOH.
xii. Prepare and clean Tbg. Protector pin side to use when R/B Tbg to the derrick
xiii. Dope only the pin ends of tool joints sparingly with a paint brush. Wipe away any excess dope.
xiv. TRS Spv. To check all string components and provide all necessary accessories
xv. All tools and Equip should be suitable for ESP completion
xvi. No one from rig team touch the power tong (Only TRS Team).
xvii. Use tubing protector Pin and box while P/U the joint on V-Door
xviii. All make up tq should be as per attached manufacture paper

WSL Day WSL N TRS ESP WT Eng. CTU Spv. DST Spv. Tool Pusher RM Driller Client Rep
WSL Day WSL N TRS ESP WT Eng. CTU Spv. DST Spv. Tool Pusher RM Driller Client Rep

You might also like