-Shri Shamrao Patil (Yadravkar) Educational & Charitable Trust’s

SHARAD INSTITUTE OF TECHNOLOGY,


POLYTECHNIC, YADRAV.

DEPARTMENT OF INFORMATION TECHNOLOGY

MICRO PROJECT PROPOSAL


IN
Computer Peripheral and Hardware
FOR
F.Y. 2021-22

MICRO PROJECT PROPOSAL


IN
SOFTWARE ENGINEERING
FOR
S.Y. 2022-2023
A

Project Proposal On

“ Bus Pass Ticket Management”

Submitted in Partial Fulfillment of the requirements for the

“DIPLOMA in Second Year”

In

Information Technology
To

M.S.B.T.E. MUMBAI.
By

Name of candidate Roll No.


1. Pranav Sanjay Potadar. 23046
2. Sanskar Sanjay Rangole. 25047
3. Sanskar Suhas Sapate. 25048

UNDER THE GUIDANCE OF

Ms. S A. Shaikh.

S.I.T.Polytechnic, Yadrav
(Ichalkaranji) [2023-24]
Shri. Shamrao Patil (Yadravkar) Educational & Charitable Trust’s

SHARAD INSTITUTE OF TECHNOLOGY POLYTECHNIC,Yadrav


(Ichalkaranji)

CERTIFICATE
This is to certify that,

Name of candidate Roll No.


4. Pranav Sanjay Potadar. 23046
5. Sanskar Sanjay Rangole. 25047
6. Sanskar Suhas Sapate. 25048

We have successfully completed the Project work entitled “Currency Converter” under
my supervision, in the partial fulfillment of the requirements for the Diploma in Information
Technology, and the report submitted to M.S.B.T.E. MUMBAI. For academic year 2022-2023.

Date:
Place: S.I.T. Poly. Yadrav.
CURRENCY CONVERTER

1. Rationale: -
a. We get knowledge about Software Engineering.
b. We also got knowledge about how to develop in Currency Converter.

2. Course outcomes: -
1) Simple use of GAD.
2) Using different concepts related to software engineering.

3. Literature Review: -

We had create related to Currency Converter using GUI interface and database concepts. We had used
various concepts of toGUI Application Development Using VB.NET get desired output. This system is
used in Railwayprocesses. Itis designed for people’s knowledge.

4. Proposed Methodology: -

 At first, we searched Project Topics.


 We searched the 3 titles and then shown the titles of our project to our project guide.
Then Discussed and selected one of them named as “ Currency Converter.”After that we
searched the information about the Project title.
 We showed it to our project Guide. Then we read it and studied it.
 After that we start to designing our project. In that some queries asked regarding to our project,
then we solved the queries and shown to our guide.
 Then we obtained softcopy of our Project.
 we collected some formats to done better performance.
 We prepared the Project Dairy, having division of 16 hours of working.
 We completed our Project Report and showed to our Respected Guide.
 At the end, we submitted both project and project report along with the Dairy.
5. Resources Required: -
Sr. Name of Quantit
Specifications Remark
No. Resources y
Operating system–windows 11.
processor - 11th Gen Intel(R) Core
1 Computer System 1 It is used to create project
(TM) i5-1135G7 @ 2.40GHz 2.42
GHz
Visual studio &
It is used to create project,
2 Microsoft office - -
diary, proposal.
word-2007

6. Action Plan: -
Planned Planned Name of
Sr.
Details of activity start finished Responsible
No.
date date member
1. Samiksha Patil
Our Project guide made the group of 3
02-02-23 04-02-23 Sanjana Patil
members.
Vaishnavi Patil
2. Our project guide has given us the project topic. Samiksha Patil

06-02-23 10-02-23 Sanjana Patil


Vaishnavi Patil
3. We asked the guide how to make the project Samiksha Patil
after finalization of project. 15-02-23 20-02-23 Sanjana Patil
Vaishnavi Patil
4. We searched the basic information of the Samiksha Patil
project. 25-02-23 30-02-23 Sanjana Patil
Vaishnavi Patil
5. Collected the actual information of the project. Samiksha Patil

01-03-23 05-03-23 Sanjana Patil


Vaishnavi Patil
6. We visited our guide to discuss suggesting Samiksha Patil
some more information of the project and some 08-03-23 12-03-23 Sanjana Patil
correction in collected information. Vaishnavi Patil
7. Our project guide asked us to correct the 15-03-23 17-03-23 Samiksha Patil
corrections Sanjana Patil
Vaishnavi Patil
8. Then we corrected the corrections suggested by Samiksha Patil
guide. 20-03-23 22-03-23 Sanjana Patil
Vaishnavi Patil
9. We showed the corrections to the guide. Samiksha Patil

25-03-23 27-03-23 Sanjana Patil


Vaishnavi Patil
10. Then we searched some more information and 30-03-23 01-04-23 Samiksha Patil
added to the project report. Sanjana Patil
Vaishnavi Patil
11. We showed to our project guide. Samiksha Patil

02-04-23 05-04-23 Sanjana Patil


Vaishnavi Patil
12. Our guide has got the satisfactory outcome Samiksha Patil
from us. 06-04-23 08-04-23 Sanjana Patil
Vaishnavi Patil
13. We started making the project by implementing Samiksha Patil
the project on required software i.e.; Microsoft 10-04-23 11-04-23 Sanjana Patil
office: - Word Vaishnavi Patil
14. We finished its implementation on Microsoft Samiksha Patil
office: - word. 12-04-23 15-04-23 Sanjana Patil
Vaishnavi Patil

15. We made our project report and project diary. Samiksha Patil

17-04-23 20-04-23 Sanjana Patil


Vaishnavi Patil
16. We submitted our project, project report and Samiksha Patil
project diary to the guide. 23-04-23 23-04-23 Sanjana Patil
Vaishnavi Patil

Sr.no Name of candidate Enrollment No.


1. Samiksha Santosh Patil 2109680550
2. Sanjana Saygonda Patil 2109680551
3. Vaishnavi Shridhar Patil 2109680522