QUANTITY SHEET

Windows
Tubular Steel 2" x 2" x 6m
Quantity Length Units Perimeter
W1 10 1.6 3 48
10 1.2 4 48
W2 6 0.5 3 9
6 1.5 2 18
W3 1 0.6 4 2.4
125.4 20.9
21 pcs

Z-bar
Quantity L W P Units Total L
W1 10 0.55 0.48 2.06 6 123.6
6 0.7 0.42 2.24 2 26.88
1 0.52 0.52 2.08 1 2.08
152.56 25.426667
26 pcs

1/4" thick Clear Glass


Quantity L W Area Units Total A
10 0.53 0.46 0.2438 6 14.628
6 0.68 0.4 0.272 2 3.264
1 0.5 0.5 0.25 1 0.25
18.142 sq.m.
Project Title:
Location:

PAINTING WORKS

Materials:
Quantity Unit Description Unit Cost Amount
2 gal Concrete Neutralizer -
8 pail Flat Latex -
2 pail HardiePutty -
2 pail Masonry Putty -
8 bags Skimcoat -
8 kg Patching Compound -
1 gal Epoxy Primer (Gray) -
1 gal Epoxy Reducer -
5 pcs Roller #7 -
5 pcs Mini Roller #4 (Cotton) -
5 pcs Paint Brush #2.5 -
1 kg Rugs -
3 pcs Masking Tape 3/4" -
3 pcs Periory Tape -
10 ft 3M Sandpaper #100 -
20 pcs Sandpaper #120 -
4 pail Semi-Gloss (White) -
Davies Sun&Rain Elastomeric Paint:
6 gal Big Bacon Beige -
4 pail Mocha Blanch -
1 gal Cathay Red -
1 gal Western Brown -
-

Total -

Labor Cost:
No. of Personnel No. of days Description Rate/day Amount
160,000.00

Total ₱ 160,000.00

Grand Total ₱ 160,000.00