Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

PT.

Pertamina Hulu Kalimantan Timur Field Santan


Production Operations
Project Slurry Pit Treatment
Production Assurance & Laboratory

SAMPLE SOURCE : WASTEC LEVEL TANK : :80


11.29
170
cmcm
DATE OF SAMPLING 06 APRIL
: 03 May 2024
2024 TIME : 11.30
15:00
SAMPLING BY : OPERATOR
CLINTON S METRIX : OIL
OIL
ANALYZED BY : M.
IHWAN
KHAIRIL
P / REFI A. SAMPLE : SOLID
OIL FROM
WASTEC
CLEAN OIL TANK

PRODUCT OIL :
BS&W TOTAL (COMPOSITE) : 2.00 % (MAX. 3.00%)

√ ACCEPTED FAILED

REPORTED BY APPROVED BY,

Clinton Siregar Heriyanto


Lead Lab Technician Jr. Analyst PA&L

Dokumentasi

Sample Clean Oil Tank (COT) Sample Clean Oil Tank (COT)
Pengukuran S&W ASTM D-4007- Pengukuran S&W ASTM D-4007-
22 22
(50 mL Sample + 50 mL Solvent + (50 mL Sample + 50 mL Solvent +
Demulsifier F46 + Centrifuge) Demulsifier F46 + Heating at 900C +
Centrifuge
WAXING
( 6.60% v/v)

Sed : 1.70 % v/v


Wtr : 0.30 % v/v

Remark : Dilakukan pengujian S&W dengan methode ASTM D 4007-22, didapat nilai waxing sebesar 6.60 % v/v. Sehingga
pengujian dilanjutkan dengan melakukan pemanasan pada suhu 90oC selama 30 menit untuk menguji kandungan waxing
yang diperoleh. Setelah pemanasan pada suhu 90oC selama 30 menit, diamati waxing mencair dan diperoleh nilai BS&W
sebesar 2.00% v/v (Sedimen : 1.70 % v/v dan Water : 0.30 % v/v).

You might also like